• Title/Summary/Keyword: bridge construction

Search Result 1,911, Processing Time 0.038 seconds

Construction of Continuous Bridges in Hi8h-Speed Railway using Precast Span Method (프리캐스트 스팬 공법을 적용한 고속철도 연속교 시공)

  • 김성일;김성호;이원표;윤철수
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.401-407
    • /
    • 2001
  • Out of 412km long Kyung-bu high-speed railway, 302km was designed in tile form of either bridges or tunnels. Most of bridges were designed to be prestressed concrete box girder type. The precast span method was selected because of good quality of bridge section secured by factory manufacturing, fast construction speed, low construction cost with mechanized construction and the safety fur field workers. The precast span method has been mainly utilized in bridges consisted of repeated simple spans. However, we applied the precast span method to continuous bridge for high-speed railway Since it was the first attempt to apply ate precast span method to a continuous bridge for high-speed railway, many design and construction details were studied and implemented in the construction. Design and construction processes of a continuous bridge construction using tile precast span mettled are briefly described in this paper.

  • PDF

Design & Construction of PSC Box-Girder Bridge with Central Suspension by Extradosed Cables and Constant Girder Depth (중앙일면식 케이블과 등형고를 갖는 Extradosed PSC 교량의 설계 및 시공)

  • 조의경;김성일;박종화;이수열
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.618-625
    • /
    • 2003
  • The recent development of PSC girder bridges are mostly dedicated for optimization of self-weight, simplification of girder section for easy construction and minimization of maintenance efforts. Moreover some of those bridges are required as a landmark facility which raises the image of locality and harmony with surroundings. An extradosed bridge is one of the best alternates which not only covers the longer span than PSC box girder and also performs the role of landmark facility with much cheaper cost than cable stayed bridge. Hyundai is carrying out the construction of unique style extradosed bridge which have central suspension system and uniform girder depth named Keong-An grand bridge on the Sungnam-Janghowon Express highway. In this paper, major process of design and construction features of Keong-An bridge is presented.

  • PDF

Design of Prestress for prefabricated bridge piers (조립식 교각의 프리스트레스 설계)

  • Kim, Hyun-Ho;Shim, Chang-Su;Chang, Chul-Hun;Kim, Cheol-Hwan;An, Dong-Geun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.11a
    • /
    • pp.225-228
    • /
    • 2006
  • Fast construction of bridge structures is a new trend of bridge design. Accelerated bridge construction includes the construction of superstructures and substructures. In order to reduce the construction time for substructures, precast prestressed bridge piers are increasingly applied in other countries. One of the main concern in the design of precast piers is the determination of the axial prestress forces. The behavior of the piers should be investigated under service loadings and ultimate conditions. In this paper, the magnitude of prestress is calculated to control the stress at the joint of precast piers. Considering long-term behavior of prestressed piers, P-M diagrams for precast piers are obtained to verify the ultimate behavior of the piers. Based on these studies, precast piers are applied to the light-railway bridge piers.

  • PDF

An Experimental Study on the Flexural Fatigue Fracture Behavior of RC Slab of Widened Bridge (교량 확폭시 RC 상판 접합부의 휨 피로파괴거동에 관한 실험적 연구)

  • 박영훈;전준창;조병완;장동일
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1994.04a
    • /
    • pp.13-18
    • /
    • 1994
  • Most widened bridges have been constructed by the joining-construction method that makes new and existing bridge structurally single structure. However, joing-construction method has several problems in design and construction viewpoint. Therefore, this study is conducted in order to investigate structural behavior of widened RC slab and traffic-induced vibration of existing bridge during placing and curing of new concrete by the prototype flexural fatigue test. From the results of this study, it is shown that stress-concentration and slip occur between concrete and reinforcing rod at joint section but the reduction of load carrying capacity and of fatigue strength is negligible according to the traffic-induced vibration as well as the difference of construction method. A reasonable construction method for the bridge widening which takes into account the effects of the traffic-induced vibration and S-N curve for the widened bridge are also proposed.

  • PDF

Construction of the longest open toped steel box girder composite bridge in the country (국내 최장 개구제형 합성형교 시공)

  • Oh, Hyun-Chul;Ma, Hyang-Wook;Kim, In-Gyu;Kim, Young-Jin;Jang, Seung-Kyoon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.165-166
    • /
    • 2009
  • This paper is to research for construction of the longest open toped steel box girder composite bridge using precast concrete deck in the country. This type bridge can bring down the construction costs by reducing the steel's weight used it's girders. And, it also can reduce working hours for construction over 6months by applying the precast deck system. I will introduce the process of construction the longest this type bridge within the country named Seochon Bridge

  • PDF

Structural behavior of precast concrete deck with ribbed loop joints in a composite bridge

  • Shin, Dong-Ho;Chung, Chul-Hun;Oh, Hyun-Chul;Park, Se-Jin;Kim, In-Gyu;Kim, Young-Jin;Byun, Tae-Kwan;Kang, Myoung-Gu
    • Smart Structures and Systems
    • /
    • v.17 no.4
    • /
    • pp.559-576
    • /
    • 2016
  • This study is intended to propose a precast bridge deck system, which has ribbed loop joints between the decks and lacks internal tendons to improve the workability of existing precast deck system. A composite bridge deck specimen was fabricated using the proposed precast deck system, and static and fatigue load tests were conducted to evaluate the structural behavior and the crack pattern of the deck. Leakage test of the deck joints was also conducted and finite element analysis was carried out to compare with the test results.

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

DEVELOPMENT OF BRIDGE MANAGEMENT SYSTEMS IN TAIWAN

  • Nie-Jia Yau;Hsien-Ke Liao
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.440-449
    • /
    • 2007
  • This paper describes the efforts in developing several versions of bridge management system (BMS) in Taiwan. There were several versions of stand-alone BMS developed in Taiwan prior to the Ji-Ji earthquake that occurred in year 1999. Since many bridges were seriously damaged by this earthquake, the Ministry of Transportation and Communication determined to develop a nationwide BMS to have a better by control on the status of bridge maintenance. Implemented in year 2000, the Taiwan Bridge Management system (T-BMS) is now the dominating and mandatory system used by all the government agencies that are responsible for bridge maintenance. Having more then 25,000 bridges in its inventory, T-BMS has thousands of logins per month to update data in the relevant database. The experiences and difficulties of using such a nationwide bridge management system are discussed. Finally, future plans for BMS development are also proposed in this paper.

  • PDF

Improved bracing systems to prevent exterior girder rotation during bridge construction

  • Ashiquzzaman, Md;Ibrahim, Ahmed;Lindquist, Will;Hindi, Riyadh
    • Steel and Composite Structures
    • /
    • v.32 no.3
    • /
    • pp.325-336
    • /
    • 2019
  • Concrete placement and temporary formwork of bridge deck overhangs result in unbalanced eccentric loads that cause exterior girders to rotate during construction. These construction loads affect the global and local stability of the girders and produce permanent girder rotation after construction. In addition to construction loads, the skew angle of the bridge also contributes to girder rotation. To prevent rotation (in both skewed and non-skewed bridges), a number of techniques have been suggested to temporarily brace the girders using transverse tie bars connecting the top flanges and embedded in the deck, temporary horizontal and diagonal steel pipes placed between the webs of the exterior and first interior girders, and permanent cross frames. This study includes a rigorous three-dimensional finite element analysis to evaluate the effectiveness of several bracing systems for non-skewed and several skewed bridges. In this paper, skew angles of $0^{\circ}$, $20^{\circ}$, $30^{\circ}$, and $45^{\circ}$ were considered for single- and three-span bridges. The results showed that permanent cross frames worked well for all bridges, whereas temporary measures have limited application depending on the skew angle of the bridge.

Analysis of Construction Cost of the Second-Dolsan Bridge and the Sepung Bridge (제2돌산대교와 세풍대교의 공사비 분석)

  • Seo, Young-Jae;Lee, Kyoung-Jae;Kim, Jae-Hong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2010.05a
    • /
    • pp.21-22
    • /
    • 2010
  • Recently, many concrete cable-stayed bridges are under construction for economic benefits. This study deals with analyzing construction cost of the Second-Dolsan Bridge and the Sepung Bridge as examples of concrete cable-stayed bridges.

  • PDF