• Title/Summary/Keyword: bridge construction

Search Result 1,905, Processing Time 0.034 seconds

Beffeting Analysis of Long Span Cable-stayed Bridge using PCCAP (PCCAP을 이용한 장대 사장교의 버페팅 해석)

  • 유원진;이석용;남효승;이완수
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2003.10a
    • /
    • pp.202-208
    • /
    • 2003
  • In this study, a time domain analysis is presented for investigation on the buffeting response of cable-stayed bridge during both erection and completion stages. The main span length and width of deck are 520 m and 15.1m, each. Since the ratio of span over width is 34.44, aerodynamic stability of the bridge during erection is expected to dominate the safety of the bridge in construction stage. Several conclusions regarding different construction stages and temporary wind cables are obtained.

  • PDF

The Strength Properties of Concrete used in Yeongdo Bridge (영도대교 콘크리트의 강도 특성)

  • Lee, Il-Sung;Ahn, Jae-Cheol;Kang, Byeung-Hee;Kim, Ki-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.23-25
    • /
    • 2011
  • The purpose of this study is to suggest documentation with determination of concrete then property, according to demolition and restoration the Youngdo bridge which has valuable meaning to modern technique as an only bascule bridge in Korea.

  • PDF

Cable Tension Force Management Using Vibration Method at Cable Stayed Bridge Construction Stages (진동법을 이용한 사장교 시공단계별 케이블 장력관리)

  • Park, Yeon-Soo;Cheon, Dong-Ho;Cheon, Yang-Bae;Kang, Kyoung-Koo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.4
    • /
    • pp.127-134
    • /
    • 2005
  • Design and construction of long-span bridge are recently increasing by development of computer technology. Specially, cable stayed bridge and suspension bridge having cable component are representative of long-span bridge may do. Therefore, this paper a present a methodology for cable tension force monitoring in cable-stayed bridge under construction using acceleration data acquired by the vibration method. To improve accuracy construction, all stay cables are measured, according to 4-step construction stage and change of temperature.

Flutter analysis of Stonecutters Bridge

  • Hui, Michael C.H.;Ding, Q.S.;Xu, Y.L.
    • Wind and Structures
    • /
    • v.9 no.2
    • /
    • pp.125-146
    • /
    • 2006
  • Stonecutters Bridge of Hong Kong is a cable-stayed bridge with two single-column pylons each 298 m high and an aerodynamic twin deck. The total length of the bridge is 1596 m with a main span of 1018 m. The top 118 m of the tower will comprise structural steel and concrete composite while the bottom part will be of reinforced concrete. The bridge deck at the central span will be of steel whilst the side spans will be of concrete. Stonecutters Bridge has adopted a twin-girder deck design with a wide clear separation of 14.3 m between the two longitudinal girders. Although a number of studies have been conducted to investigate the aerodynamic performance of twin-girder deck, the actual real life application of this type of deck is extremely limited. This therefore triggered the need for conducting the present studies, the main objective of which is to investigate the performance of Stonecutters Bridge against flutter at its in-service stage as well as during construction. Based on the flutter derivatives obtained from the 1:80 scale rigid section model experiment, flutter analysis was carried out using 3-D finite element based single parameter searching method developed by the second author of this paper. A total of 6 finite element models of the bridge covering the in-service stage as well as 5 construction stages were established. The dynamic characteristics of the bridge associated with these stages were computed and applied in the analyses. Apart from the critical wind speeds for the onset of flutter, the dominant modes of vibration participating in the flutter vibration were also identified. The results indicate that the bridge will be stable against flutter at its in-service stage as well as during construction at wind speeds much higher than the verification wind speed of 95 m/s (1-minute mean).

Conceptual Design of Remote Precise Installation System for Bridge Girders (교량용 거더 원격 정밀거치 시스템 개념 설계)

  • Lee, Sangyoon;Park, Youngsoo;Lee, Sangwon;Chung, Taeil;Song, Jaejoon
    • The Journal of Korea Robotics Society
    • /
    • v.16 no.3
    • /
    • pp.199-206
    • /
    • 2021
  • The robot is an effective means to perform repetitive tasks quickly and accurately. It could be more effective in dangerous environments where human is difficult to access. The construction site is a dangerous environment with a high possibility of industrial accidents where heavy work is frequently carried out at a high place. In particular, an accident in the construction site is highly likely to lead to a severe disaster. Of course, various technologies are being developed to monitor the safety of workers in construction sites and prevent accidents, but there is a limit to eliminate the risk of accidents. Therefore, it is necessary to make efforts to replace workers exposed to dangerous environments with equipment or robots that could be controlled remotely in a more active way. In this study, Remote Precise Installation System was proposed to replace the workers exposed to the risk of accident at a high place during the bridge construction. Also, the conceptual design and analytical reviews of this system were carried out. Suppose Remote Precise Installation System is developed according to the derived concept and the target performance. In that case, this system is expected to be applied as a technology that can effectively replace the workers at the bridge construction site.

A method for evaluation of longitudinal joint connections of decked precast concrete girder bridges

  • Smith, Matthew Z.;Li, Yue;Bulleit, William M.
    • Structural Engineering and Mechanics
    • /
    • v.40 no.3
    • /
    • pp.297-313
    • /
    • 2011
  • As bridge conditions in the United States continue to deteriorate, rapid bridge replacement procedures are needed. Decked precast prestressed concrete (DPPC) girders are used for rapid bridge construction because the bridge deck is precast with the girders eliminating the need for a cast-in-place slab. One of the concerns with using DPPC girders as a bridge construction option is the durability of the longitudinal joints between girders. The objectives of this paper were to propose a method to use a spring element modeling procedure for representing welded steel connector assemblies between adjacent girders in DPPC girder bridges, perform a preliminary study of bridge performance under multiple loading scenarios and bridge configurations, and discuss model flexibility for accommodating future field data for model verification. The spring elements have potential to represent the contribution of joint grout materials by altering the spring stiffness.

The Plan & Design for Through Plate Girder Bridge of Variable Section (변단면 하로판형교의 계획 및 설계)

  • Min, Young-Taek;Kim, Sung-Yeol;Ko, Seung-Young;Kim, Young-Sang
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.530-537
    • /
    • 2006
  • Recently, the railroad route plan is trying to minimize the damage of the local resident which is caused by railroad construction. For this reason, reducing the banking height of soil roadbed, lowering the bridge girder height of a solid intersection and a part of cross river, the through bridge type which can achieve a required span length must apply. The representative through bridges of railroad are arch bridges, truss bridges and plate girder bridges, the through plate girder bridge of variable section can apply that the span length of these bridges is about $30{\sim}50m$, namely, middle span length bridge types, and that can satisfy structural capacity and beauty of railroad at the same time. This paper introduces plan and design process of the Su-eo cheon bridge applied by a through plate girder bridge type of the Jinju-Gwangyang double track 6th construction ordered at Korea Rail network Authority in 2005.

  • PDF

A Study on the Probabilistic Risk Analysis for Safety Management in Construction Projects

  • Lee, Dong-Yeol;Kim, Dong-Eun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.8
    • /
    • pp.139-147
    • /
    • 2021
  • In this study, we proposed the possibility of reliability analysis of risk index by using Monte Carlo simulation as basic data of safety accident occurrence data and expert opinion by construction industry type. Through this, it is expected that risk index for safety accidents according to detailed types of works will be presented stochastically and it will be possible to predict the risk factors and the expected range of damage based on the reliability analysis in the construction safety management plan. It will also reduce many of the planning risks that are common to decision makers in the field of construction management. In identifying risks, road bridge construction was classified into earthworks, drainage works, and bridge construction, and possible safety accidents were classified based on expert data. The risk index was calculated for each detailed construction of road and bridge construction, drainage construction, and bridge construction.

Development of the Purlin Hanging System Form for the Girder Bridge Slab and Economic Analysis (거더교 상판 콘크리트 타설용 거푸집 개발 및 경제성 분석)

  • Lim, Jeeyoung;Kim, Sunkuk;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.3
    • /
    • pp.271-278
    • /
    • 2016
  • In the case of South Korea, steel girder bridge (steel box or H-steel) and PSC (Pre-Stressed Concrete) girder bridge are the representative upper structures of railroad and road bridges. These structures account for 75% of the total bridge constructions and 80% of the total construction cost. Since the form work for concreting bridge slab is difficult, various construction methods developed and applied. However, several problems in those methods did not solve partially, including cost increase by material loss and rise of labor costs, quality deterioration by unskilled workers, increased construction time by complicated method, reduced productivity, safety accident by high place work, difficult transportation by big member, and rise of maintenance cost by material characteristic. Alternative method is needed to solve problems of as-is methods. Therefore, the purpose of this study is development of the purlin hanging system form for the girder bridge slab and its economic analysis. Through the findings of this study, it was verified that the purlin hanging system form is possible 60% reduction in cost and 80% reduction in time as comparison with conventional method.

A Study on the Electronic Manual of Maintenance System for Bridge Facilities on Local Area (중소규모 교량시설물의 유지관리를 위한 전자매뉴얼 구성)

  • Jeong Won-Myung;Chang Kyung-Tae;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.581-584
    • /
    • 2003
  • Recently, construction industry has an interest on the maintenance area of construction facilities to maximize utilization of the each facility. This study suggests an interactive electronic technical manual for bridge facility to improve quality and to ensure safety of the bridge facility. The improvement method of bridge maintenance system consists of the basic information ell the facilities, maintenance manuals and measurement system. And the suggested system is based on the facilities, maintenance manuals and measurement system. And the suggested system is based on IETM (Interactive Electronic Technical Manual), and this study defines and develops a $BF\_IETM (Bridge Facility\_ITEM$ as the bridge maintenance system.

  • PDF