• Title/Summary/Keyword: box section

Search Result 328, Processing Time 0.024 seconds

Distribution of Time-dependent Strains In the Top Slab of PSC Box Girder Bridge (PSC박스거더교 상부슬래브에서의 시간의존적 변형률 분포)

  • Kim, Young-Jin;Kim, Byung-Suk;Kawrk, Jong-Won
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.538-541
    • /
    • 2006
  • PSC(Prestressed Concrete) box girder bridges have been widely applied in Korea. A number of these bridges have been built by the segmental construction method in the longitudinal direction and(or) vertically along the cross-sectional depth with MSS(Moving Scaffolding System). An actual 2-span continuous PSC box girder bridge of Kyeongbu high speed railway was selected and instrumented with 96 vibrating wire embedded type strain gauges and 2 thermocouples. The long-term behavior of the bridge was monitored through two major points located at mid-span of the first span and at the internal support. Data collection started just after the casting of the first segment (U section). Concrete strain and temperature data were gathered regularly by a data logger (CR10) during 600 days under and after construction. According to this measurement, the parabolic longitudinal strain distribution in the top slab at mid-span is shown. And also, the same distribution at the interior support is shown. The compressive strains at the cantilever region are larger than at the web position and the internal part in the top slab. Strain difference largely happened during the early construction period.

  • PDF

Behavior of Steel Box Girder Bridge According to the Placing Sequences of Concrete Slab (II) (강합성 상자형 교량의 바닥판 타설에 따른 거동 연구(II) - 해석적 연구 및 균열제어 -)

  • Kwak, Hyo Gyoung;Seo, Young Jae;Jung, Chan Mook;Park, Young Ha
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.2 s.45
    • /
    • pp.133-142
    • /
    • 2000
  • This study deals with behavior of steel box girder bridges according to the concrete slab casting sequences and sectional types. The time dependent behavior of bridges caused by the differential setting of slab concrete resulting from time gap for each part of slab deck in a sequential placing method produces is analyzed. In correlation studies between girder section types and placing sequences, time dependent effects of concrete creep and shrinkage are implemented in the analytical model proposed in the previous study. Finally, field recommendations in terms of concrete slump and relative humidity are suggested to prevent early transverse cracking of concrete slabs.

  • PDF

Behavior of Steel Box Girder Bridge According to the Placing Sequences of Concrete Slab (I) (강합성 상자형 교량의 바닥판 타설에 따른 거동 연구(I) - 해석모델 및 현장실험 -)

  • Kwak, Hyo Gyoung;Seo, Young Jae;Jung, Chan Mook;Park, Young Ha
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.2 s.45
    • /
    • pp.123-131
    • /
    • 2000
  • In this study, both experimental and analytical study for behavior of the existing composite steel box girder bridges, constructed along with the procedure of continuous placing slab, are conducted to establish the validity of the proposed model. The layer approach is adopted to determine the equilibrium condition in a section to consider the different material properties and concrete cracking across the sectional depth, and the beam element stiffness is constructed on the basis of the assumed displacement field formulation and the 3-points Gaussian Integration. In addition, the effects of creep and shrinkage of concrete for time-dependent behavior of the bridge are taken into consideration. Finally, both analytical and experimental results are compared.

  • PDF

Fire Loading Analysis of Underground Box Structure with Considering of Concrete Spalling II : Load Carrying Capacity (박리를 고려한 지하박스구조물의 화재하중해석 II : 내하력)

  • Lee, Gye-Hee;Kim, Sun-Hoon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.20 no.4
    • /
    • pp.485-492
    • /
    • 2007
  • In this study, based on the temperature distribution and the spalling histories those obtained in the companion paper, the thermal stress and moments of underground box structure were estimated. Additionally, the ultimate sectional moment considering with the thermal nonlinearities of material were estimated and the load carrying capacity of underground box structure was also obtained. As results, the load carrying capacity of negative moment part was dominated by thermal moment that come from thermal gradient of the section. However, the load carrying capacity of the positive moment part was rules by the yield stress of rebar that exposed to the high temperature induced spalling phenomena.

The railway line planning pass through the center of Seoul in the railway line of Incheon International Airport Railway (인천국제공항철도 노선에서 서울도심통과 구간의 노선 선형계획)

  • Shin Tae-Gyun;Kim In-Yong;Jung Chan-Mun;Kim Yong-Man
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1138-1143
    • /
    • 2004
  • We as a civil investment enterprise have been constructing In-cheon International Airport Railway which is a transportation means to approach In-cheon International Airport. In this alignment. a section between the Seoul station and Ka-joa follows the existing Yong-san line at the center of Seoul city and traverses Seoul subway 2,5,6 lines. So we planned that the alignment would have the shallowest depth to lie under Kyung-eui line and above the airport railroad. The alignment is planned to construct an open-box structure only 3.6m apart from the subway line 5 tunnel structure and construct the open-box structure 0.7m apart from the subway line 2 box structure. In the line planning, we investigated both the security of the existing subway structures during and after construction and the stability and workability between newly structured tunnel structures with three dimensions numerical analysis methods. Also we raised the reliability of design verification which was achieved by specialty society's review on the planned construction method.

  • PDF

An Experimental Study on the Seismic Behavior of Box Type Concrete-Filled Steel Piers (박스형 강합성 교각의 내진 성능 평가를 위한 실험적 연구)

  • 서진환
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.10a
    • /
    • pp.381-388
    • /
    • 2000
  • The steel piers and the concrete-filled steel piers, in spite of reasonable strength, high ductility, small section, and fast construction, have not been considered as the alternatives to the RC piers even in the highly populated urban area where aseismic safety, limited space and fast construction are indispensably required. In this paper, a steel pier and 4 box type concrete-filled steel piers were tested with the quasi-static cyclic loading to estimate the ductility and the strength. Additional devices such as base rib, turn-buckle, and anchor bolted added at the to increase the ductility with minimum additional cost. The result showed that the concrete filled-in steel piers had higher energy absorbtion and strength than steel piers had, but also showed that slight overlooking in the design and fabrication could lead to the abrupt fracture just after small local buckling at the bottom.

  • PDF

Design of Dang-San Steel Railway Bridge (당산철교의 설계)

  • 유동호;김선일
    • Computational Structural Engineering
    • /
    • v.12 no.4
    • /
    • pp.69-69
    • /
    • 1999
  • Design of Dangsan Steel Railway Bridge(a part of Seoul Subway Line NO. 2), which is supposed to be replaced after its 15years survice, was done, and the reconstruction has begun in Dec. 1997. The design include new superstruc-ture and bridge piers, retrofitting of the foun-dation, rail system, electric and signal, etc. In this paper, design of the structure is mainly summarized. The main span superstructure, across Han river, is composite section which is com-posed of steel box and reinforced concrete deck slab with 9 span continuous. The superstructure for the approaches is bottom througth type 2-cell steel box girder with steel floor system and concrete deck slab with 3 or 4 span continuous. The bridge piers was planned to be reconstructed based upon the result from the various investi-gations, while the foundation(cassion and pile foundation) was planned to be retrofitted. For superstructure erection, the method of combination of barge bent and heavy lifting and the launching truss method was investigated for the main span and approach spans, respectively.

  • PDF

Optimum Design of Modular FRP Box Member to Bending Moment (휨을 받는 조립형 FRP 박스부재의 최적단면검토)

  • Kwak, Kae-Hwan;Kim, Kyung-Suk;Kim, Ho-Sun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.3
    • /
    • pp.43-51
    • /
    • 2011
  • Fiber Reinforced Polymer (FRP)s have various advantages for construction material in that they are noncorrosive and very strong. FRPs are economical and effective for management and maintenance when applied to footbridge, beam or deck of the bridge, girder, and marine structure. For safety, optimal design for standard modulation of the cross section is necessary. Conditions of optimum are possibilities of domestic production, modular assembly, and structure materials cast in compressed area.

Progressive collapse analysis of two existing steel buildings using a linear static procedure

  • JalaliLarijani, Reza;Celikag, Murude;Aghayan, Iman;Kazemi, Mahdi
    • Structural Engineering and Mechanics
    • /
    • v.48 no.2
    • /
    • pp.207-220
    • /
    • 2013
  • In this study, the vulnerability of two existing asymmetric steel building frames to Progressive Collapse (PC) is assessed. The buildings have different frame systems, steel sections and number of stories (nine and six). An alternate path method (APM) with a linear static analysis (LS) is carried out according to General Services Administration (GSA) 2003 guidelines. The Demand Capacity Ratio (DCR) of each primary element (beams and columns) is given with its specific details for all frames. The results show that the nine-story building with a dual frame system (moment frame with bracing system) has a lower susceptibility and greater resistance to PC than the six-story building with a simple building frame system (gravity system with bracing system). Implementing built-up box-shaped sections for columns is a better choice than using built-up I-shaped sections because there is no weak axis for the box section.

Design & Construction of PSC Box-Girder Bridge with Central Suspension by Extradosed Cables and Constant Girder Depth (중앙일면식 케이블과 등형고를 갖는 Extradosed PSC 교량의 설계 및 시공)

  • 조의경;김성일;박종화;이수열
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.618-625
    • /
    • 2003
  • The recent development of PSC girder bridges are mostly dedicated for optimization of self-weight, simplification of girder section for easy construction and minimization of maintenance efforts. Moreover some of those bridges are required as a landmark facility which raises the image of locality and harmony with surroundings. An extradosed bridge is one of the best alternates which not only covers the longer span than PSC box girder and also performs the role of landmark facility with much cheaper cost than cable stayed bridge. Hyundai is carrying out the construction of unique style extradosed bridge which have central suspension system and uniform girder depth named Keong-An grand bridge on the Sungnam-Janghowon Express highway. In this paper, major process of design and construction features of Keong-An bridge is presented.

  • PDF