Proceedings of the Korean Geotechical Society Conference
/
1993.03a
/
pp.49-58
/
1993
Reappraisal of the design and the construction concept of the bottom drainage tunnel has been made through the seepage analysis. An appropriate design approach for this tunnel has also been proposed. It was revealed from this study that water pressures acting on the concrete lining in the bottom dralnage tunnel much depend on the permeability of the surrounding ground, the source of water supply and the discharge capacity of dralnage facilities. The full release of these water pressures by the current drainage system could not be expected if this type of tunnel is constructed in the ground including alluvial deposits having a high permeability. The necessity of a proper reinforcement of the concrete lining or a modification of its shapes corresponding to the water pressure has been suggested.
Journal of the Korean Society of Hazard Mitigation
/
v.8
no.3
/
pp.117-122
/
2008
Generally, water is taken through channels and rivers, in which there are many weirs and structures, which cross rivers and temporally hold up water. But this way has its own shortcomings. It is main reason that the water flows through structures, and backwater come into being. So it causes many water quality problems and some flood side-effects and so on. In this study, among the various movable weirs, we installed bottom-discharged and air pressure movable weir in the experimental channel. And we analyzed flowing influence, which is followed by the angle variation of movable weir. We also make further study the flow characteristic variation followed by installing entrance at the bottom to discharge the bottom water. The analysis result was that installed weir angle was increased, and the discharge also gradually increased. The installed weir angle depended on the water quantity, which can be excluded in the bottom. In case of velocity, there was increased as maximum 21.9 times, according to there is entrance or not at the bottom. And in case of water level, it showed the water level of locally above the average decrease in the upper river of weir.
Magazine of the Korean Society of Agricultural Engineers
/
v.9
no.2
/
pp.1296-1300
/
1967
This study was made through the utilization of heavy soil taken from the experimental plot of heavy soil in Konkuk University, Changan-dong, Sungdong-ku, Seoul. The soil used in the experiment has the following physical characteristics: 1. The soil is very compact, impervious, and unfit for any plant growth, 2. For improvement of the soil, tile drainage practice has been employed, 3. According to the general theory of tile drainage, it is unnatural that the effect of drainage is actually observed in such a soil. The followings are the results of the experiment: 1. Water moved to crosswise when the plotted soil profile was not broke. In this case the upper sloped part was dry while the bottom part was moistned. The upper part of the tile was also moistned. 2. The crosswise movement of water was not observed in the artificially broken plot of subsoil. However, the water flow from the tile was observed for long period as a result of the increase of soil void, seepage, aeration, and water holding capacity. However, the water flow from the tile in the plot of unbroken subsoil was observed only in short period and soon the flow was stopped. 3. the distance between the tile laid in the heavy soil should not exceed 10m for the efficient drainage. 4. When the pF is 2.5 in the subsoil the moisture content was between 23.97% and 28.20%. However, when the water saturated in the subsoil the moisture content was between 34.30% and 22.10%. Accordingly without the higher pF than 2.5 the water can not be absorbed and therefore the drainage can not be occured.
Magazine of the Korean Society of Agricultural Engineers
/
v.42
no.6
/
pp.83-89
/
2000
A depot encircled with contact oxidation canal has been developed to improve water qualityr. The depot is aimed to settle suspended solid in the flow. The oxidation canal is to contact the pollutants and oxygen in the surface of gravel filter to purify the water. The deposit of the pollutant in the depot is released by the drainage culvert located at the bottom of it. Aeration nozzle is installed to supply enough oxygen to the gravel filter layers in the bottom of the detent the flow and improve oxidation efficiency. From the experiment it is founded that 91% of SS, 39% of TN, 63% of TP and 77% of COD were removed in the system. The treatment efficiency of total nitrogen is rather lower than any other components, however, it would be higher when some floating vegetation is added in the primary clarifier. The depot and oxidation canal system would be useful to purify the flows in the mouth of the reservoirs or at the outlet of the drainage canal.
Sihwa dyke was constructed during the period from June, 1987 to January, 1994 and the sluice gates were opened to allow sea water intrusion and outflow to improve water quality of the lake since June, 1997. Bottom sediment samples from 29 stations were co
Generally, the groundwater pressure is not considered in the design of concrete lining of bottom drainage tunnel. This design method implies that the phreatic surface is drawdown to the bottom of tullnel. When tile groundwater is continually supplied without changing of groundwater table, there is a possibility at which the groundwater pressure acting on the tunnel lining after the completion of tunnel. Therefore, the safety of tunnel lining must be checked in this case. In this paper, the stability of bottom drainage tunnel which is affected by groundwater discharge is analzed by using of the Finite Element Method at the 2 sections of subway where the groundwater level has a tittle change during the construction. As the result of analysis, the grouting for the water tightness and the permanent monitoring system of tunnel are required for maintaining of long-term stability of bottom drainage tunnel for the case of groundwater plassure acting on the tunnel lining is greater than that of design stage.
Clogging phenomenon in drainage system is one of the important problems and this phenomenon would be bad effect to structure of tunnel, so it needs a remedy urgently. Recently, scale in drainage pipe is removed by water jet cleaning and other treatment. But these treatments need much cost and regular management. In this study, magnetic device was used to solve this problem and an effect of prohibiting scale in accordance with array of magnetic device was investigated. Analysis method was visual analysis and measuring weight of each pipes. As a result, interior top and out-bottom (CASE II) was the most effective array to prohibit scale. and interior left and right (CASE III), interior top and bottom (CASE I) was effective for prohibiting scale in order.
Choi, Seung-Hyun;Kim, Seok-Hwi;Lee, Jin Won;Kim, Kangjoo;Oh, Chang Whan
Economic and Environmental Geology
/
v.48
no.6
/
pp.467-475
/
2015
The Deokjin Pond is one of the places representing Jeonju City's history but has the poor water quality. The pond has a storage of $88,741m^3$ and a drainage area of $3.77km^2$. It has been maintained only by the groundwater pumped from the upstream wells and the direct rainfalls on the water surface since the old streams replenishing the pond were turned into a part of the sewer system due to indiscreet urbanization. The lack of replenishing water as well as the organic-rich bottom sediment were suggested as two main causes deteriorating the water-ecosystem. In this study, possible measures obtaining waters for restoration of Deokjin Pond ecosystem are discussed. It is estimated that the present pond can be replenished about 32 times a year by the runoff when the drainage system in the watershed is recovered to a state before urbanization. To support this, the drainage system is compared with that of nearby Osong Pond, which shows relatively better water-ecosystem. Even though Osong Pond has a drainage area one-seventh of that of Deokjin Pond, its storage is more than the half of it. It is because its watershed has a near natural drainage system where the rain mostly infiltrates into soil and slowly discharges into the pond. Therefore, it is believed that the low impact development (LID), which is known as a technique restoring the water circulating system to a condition before development, would be helpful in obtaining waters required for Deokjin Pond ecosystem management.
Recently the large scale civil engineering projects are being implemented by reclaiming the sea or utilizing seashore and river embankment areas. The reclaimed land and utilized seashore are mostly soft ground that doesn't have sufficient bearing capacity. This soft ground consists of fine-grained soil such as clayey and silty soils or large void soil like peat or loose sand. It has high ground water table and it may cause the failure and crock of building foundation by uplift pressure and ground water leakage. In this study, the permittivity and the transmissivity were evaluated with the applied normal pressure in the laboratory. The laboratory model tests were conducted by utilizing geocomposite drainage system for draining the water out to release the uplift pressure. The soil used in the laboratory drainage test was dredged soil from the reclaimed land where uplift pressure problems can arise in soil condition. Geocomposite drainage system was installed at the bottom of apparatus and dredged soil was layered with compaction. Subsequently the water pressure was supplied from the top of specimen and the quantities of drainage and the pore water pressure were measured at each step water pressure. The results of laboratory measurements were compared with theoretical values. For the evaluation of propriety of laboratory drainage test, 2-D finite elements analysis that can analyze the distribution and the transferring of pore water pressure was conducted and compared with laboratory test results.
Water quality data for 10 years (2000~2009) from about 826 reservoirs that are operated as a agricultural water quality survey network were analyzed in order to seek water quality management plan based on physical and chemical characteristics of agricultural reservoirs. The 95% reservoirs that exceed agricultural water quality standard of Chl-a (35mg/ $m^3$) had effective water depth shallower than 5m. The reason was that the reservoirs had more inflows of nutrient salts from the watershed, bigger surface water area of weak structure to algae occurrence. As the reservoirs of effective water depth shallower than 5m cover 49% of benefited area for irrigation, it is critical for agricultural water quality management of the reservoirs. The water quality of reservoir with shallower than 5m effective water depth was worse than reservoir with deeper than 5m effective water depth. Therefore, it is desirable that effective water depth of reservoirs make more than 5m for water quality management by building the bank higher and dredging the bottom of reservoirs.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.