• Title/Summary/Keyword: blasting excavation

Search Result 205, Processing Time 0.024 seconds

A Study on the Improvement of a Charging and Initiating Method in a Tunnel Excavation (터널굴진에서 장약 및 기폭방법 개선에 관한 연구)

  • Oh, E-Hwan;Won, Yeon-Ho;Lim, Han-Uk
    • Explosives and Blasting
    • /
    • v.24 no.2
    • /
    • pp.1-8
    • /
    • 2006
  • In this study, a charging density has been differently applied to all holes to improve an excavated length per round on excavating a tunnel in quartzite mine and to prevent a dead pressure phenomena and sintering phenomena. A composition initiating system using simultaneously a direct initiating system and a indirect initiating system with 2 detonators in one hole has been introduced to cut holes. As a bottom part which is difficult to make a free face are charged with a higher charging density and a column part are charged with a lower charging density, the composition charging and initiating system which the power of explosives works effectively in the rock mass is developed. As the results, a dead pressure phenomena and a sintering phenomena being often produced in a hard rock or in a long hole could be prevented. Besides, the workability was improved by about 15% and the specific charge was reduced to about 20%, as an excavated length vs. a drilled length per round could be increased over 95%.

Application of Fracture Toughness for Scaled Model Test (파괴인성의 축소모형실험 적용 연구)

  • Kim, Jong-Gwan
    • Tunnel and Underground Space
    • /
    • v.30 no.1
    • /
    • pp.87-97
    • /
    • 2020
  • Fracture toughness of rock is a constant that can indicate the initiation and propagation of cracks due to blasting, excavation, etc. Scaled model tests have been applied to the behavior of tunnels and the stability of limestone mines. Through the scaled model, damaged zone evaluation due to blasting is also carried out, and the scale factor is not applied to the failure-related factors. In this study, DCT (diametral compression test) and finite element method ATENA2D numerical analysis results were compared to determine whether the scale factor could be applied to the fracture toughness of rock. The theoretical values of the scale factor applied to the fracture toughness of the rock and the DCT test results and the numerical results are 0.21~0.46, 0.40, and 0.99MPa ${\sqrt{m}}$ respectively, so these three values should be considered when determining scale factor. It is necessary to derive a suitable scale factor in consideration of the length, time, and mass to which the scale factor is applied, as well as the values of the scale factor of major design factors such as uniaxial compressive strength and density.

An Evaluation of the Influence of a Mixed Gas Explosion on the Stability of an Underground Excavation (혼합 가스폭발이 지하구조물 안정성에 미치는 영향 평가)

  • Kim, Minju;Kwon, Sangki
    • Explosives and Blasting
    • /
    • v.38 no.4
    • /
    • pp.1-15
    • /
    • 2020
  • With the increase of the utilization of underground space in Korea, explosion accidents at the underground facilities such as gas pipes have occurred frequently. In urban area with high population density, individual explosion accidents are likely to spread into large complex accidents. It is necessary to investigate the effect of explosion on the stability of underground structures in urban area. In this study, a sensitivity analysis was carried out to investigate the possible influence of nearby explosion on the stability of underground structure with 8 parameters including explosion conditions and rock properties. From the sensitivity analysis using AUTODYN, the main and interaction effects of each parameters could be determined. From the analysis, it was found that the distance between explosion point and tunnel, charge weight, and Young's modulus are the most important parameters on the stress components around a tunnel.

A Study on the Behavior of Concrete floors with Over-break in Railroad Tunnel (여굴깊이에 따른 철도터널 바닥 콘크리트의 거동에 관한 연구)

  • Yang, Joo-Kyoung;Kim, Hyo-Jung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.5
    • /
    • pp.101-107
    • /
    • 2017
  • Over-break, which is excavated larger than planned line at tunnel excavation, is inevitable due to the nature of blasting. But regarding the bottom of the foundation, most of the domestic ordering organizations pay only 10 cm thick filled concrete when pouring concrete due to over-break. In accordance, the construction cost will increase greatly if all the depths of the designed over-break are filled only with concrete. When tunnel excavation occurs, concrete filling of 18 MPa(T = 100 mm) and 150 mm~237 mm auxiliary concrete layer and 240 mm concrete track(TCL) are applied to the upper part. The concrete is installed in an excessive amount of about 600 mm between the lower part of the rail and the tunnel rock bed. Therefore, in this study, it is necessary to analyze the concrete crack structure according to the depth of the existing tunnel and the modified tunnel section, and to evaluate the adequacy of the required thickness of the tunnel floor concrete for securing the crack stability of the concrete.

Blast Design for Controlled Augmentation of Muck Pile Throw and Drop (발파석의 비산과 낙하를 조절하기 위한 발파 설계)

  • Rai, Piyush;Yang, Hyung-Sik
    • Tunnel and Underground Space
    • /
    • v.20 no.5
    • /
    • pp.360-368
    • /
    • 2010
  • The paper presents a case study from a surface mine where the controlled augmentation of throw and drop of the blasted muck piles was warranted to spread the muck piles on the lower berm of the bench. While the augmentation of throw increased the lateral spread and the looseness of the broken muck, the augmentation of drop significantly lowered the muck pile height for easy excavation by the excavators. In this light, the present paper highlights and discusses some pertinent changes in the blast design parameters for such specialized application of cast blasting in a surface mine, where a sandstone bench, with average height of 22-24 m was to be made amenable for excavation by 10 m3 rope shovels, which possessed maximum digging capability of up to 14 m. The results of tailoring the blast design parameters for augmentation of throw and drop are compared with the baseline blasts which were earlier practiced on the same bench by dividing the full height of the bench in 2-slices; upper slice (10-14 m high) and lower slice (12-15 m high). Results of fragment size, its distribution and total cycle time of excavator (shovel) are presented, and discussed.

Estimation of Ripperbility in Rock Mass (암반의 굴착난이도 평가를 위한 제안)

  • 황영철;유병옥;김태수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.159-166
    • /
    • 1999
  • One of the most general methods that can evaluate the rippability is the seismic exploration. However, most field engineers have hardly used the seismic exploration. Instead of using the seismic exploration, they have usually used rock hammer and naked eyes to confirm the degree of rippability for soil, ripping rock and blasting rock. Therefore, to excavate the ground rationally, it is required to establish a quantitative criterion that can be used for distinguishing rippability. In this study, we find out the characteristics of rock strength through laboratory and field tests. The weathering condition of rock exposed to air due to excavation of soil layer and the variation of rock strength caused by weathering were investigated. A relationship between rock strength values that are obtained from uniaxial compression test, slaking durability test, point load test, schmidt hammer test and absorption ratio test is analyzed. The relationship is expressed in a form of equation by which we can evaluate the rock strengths obtained from simple laboratory and field tests. To evaluate rippability in a reasonable manner, a quantitative approach is proposed and a check list of rippability is developed based on the proposed methodology. It is recommended to modify the proposed method for evaluation of rippability in the field.

  • PDF

A study on Actual Quantity of Shotcrete Sprayed in a NATM tunnel (NATM 산악터널의 숏크리트 투입율에 관한 연구)

  • Lee, Cheol-Ju;Kim, Sung-Yun;Kim, Dong-Gun;Yoo, Nam-Jae
    • Journal of Industrial Technology
    • /
    • v.29 no.B
    • /
    • pp.57-64
    • /
    • 2009
  • This study has analysed actual overbreak, shotcrete rebound and the ratio between the actual quantity of shotcrete to designed shotcrete measured during a NATM tunnel construction. The measured shotcrete rebound was about 7.2% in average which was about half the allowable rebound (15%), showing shotcrete spraying was performed well. Based on the measurement of excavated tunnel shape, average overbreak was about 28.5cm after tunnel excavation by drill and blasting method. This was about 260% of allowable overbreak. In addition, due to the rebound and overbreak actual amount of shotcrete used in the tunnelling work was about 116.5 % of the designed value. According to the field measurement the ratio of actual shotcrete to designed value showed some relation with standard support pattern, but the size of overbreak did not show the correlation with standard support pattern. Hence current design specifications stating the size of overbreak based entirely on standard support pattern should perhaps be reestablished. The insight into the design guideline regarding overbreak and shotcrete.

  • PDF

The Estimation of Volume Conversion Factor of Rock Fill using Field Density Test (현장밀도시험을 이용한 암성토 체적환산계수 산정에 관한 연구)

  • Park, Jong-Beom;Ma, Myong-Soo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.1
    • /
    • pp.9-17
    • /
    • 2017
  • In this study, the field density test was conducted as a volume conversion factor for the design of the excavation soil of the blasting rock. As a result of the field density test, the average volume conversion factor of rock was 1.001, which was smaller than the volume conversion factor of weathered rock 1.1. In the case of rock filled soil, the causes of the increase and decrease of the volume of the soil are provided by various phenomena. However, the specific techniques such as investigation and test methods are insufficient. Therefore, it was confirmed that the method of field density test is very useful method.

A Study on Disaster Influencing Factors and Importance for Safety Management in NATM Tunnel Drilling (NATM 터널 굴진 시 안전관리를 위한 재해영향요인 및 중요도에 관한 연구)

  • Lee, YoungSoo;Yoon, Younggeun;Oh, Taekeun
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.757-763
    • /
    • 2022
  • In the NATM tunnel construction method for urban subway and underpass construction, various causes of disaster exist. In this study, in order to analyze the importance of disaster influencing factors during NATM tunnel excavation, the possible risk factors were analyzed through prior research such as drilling, charging and blasting, It was divided into the work items of wrinkle treatment, pumice cleanup, and support materials. Next, the final 21 detailed measurement indicators were selected through the FGI survey of related experts, and AHP (Analytic Hierarchy Process) analysis were conducted. As a result, it was found that the workers involved in the tunnel construction were the most influential disaster influencing factor.

A case study of large - long tunnel using the charging mechanization system of the bulk emulsion explosives (Bulk Emulsion 기계화 장전시스템을 이용한 대단면 장대터널 시공사례연구)

  • Yoon, Ji-Sun;Jang, Young-Min;Lee, Sang-Hun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.107-115
    • /
    • 2009
  • Lately, the length of tunnel, the number of large-long tunnel over three lanes are steeply increased because of the request for high speed and straight road. Therefore, the maximization of excavation efficiency is needed in tunnel construction. Bulk Emulsion explosives charging system is the spearhead equipment using the radio remote control $&$ mechanization system compare with a traditional method Cartridge type. This study introduced the bulk emulsion explosives which is new method in tunnel blasting and verified the efficiency of bulk emulsion explosives for long-large tunnel. And we tried to compare Cartridge type efficiency with bulk emulsion explosives efficiency by the field test.