Blasting Impact by the Construction of an Underground Research Tunnel in KAERI (한국원자력연구소내 지하처분연구시설 건설에 따른 발파 영향)

  • Kwon Sang-Ki;Cho Won-Jin;Kim Deug-Su
    • Explosives and Blasting
    • /
    • v.23 no.4
    • /
    • pp.1-18
    • /
    • 2005
  • The underground research tunnel, which is under construction in KAERI for the validation of HLW disposal system, is excavated in a granite rock by drill&blasting. In order not to disturb the operation at the research facilities including Hanara reactor by the blasting for the excavation of $6m{\times}6m$ tunnel, a test blasting at the site was performed. Using the vibration equation derived from the test blasting, it was possible to predict the vibration at different locations at KAERI and to conclude that the blasting design would meet the design criteria at the major facilities in KAERI. The noise and vibration generated by the main blasting were continuously measured. In the case of vibration, the measured values were lower than the predicted one from the vibration equation. It is, therefore, concluded that the influence of blasting work for the construction of 280m long research tunnel on the major facilities in KAERIl would be insignificant.

Blasting Design for Large Shaft in Urban Area Considering Noise and Vibration -Singapore Transmission Cable Tunnel EW2- (소음 및 진동을 고려한 도심지 내 대단면 수직구 발파설계 사례 -싱가포르 Transmission Cable Tunnel EW2 공구-)

  • Kim, Julie;Lee, Hyo;Kim, Dave;Ko, Tae-Young;Lee, Simon
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.55-63
    • /
    • 2013
  • With increasing needs in power, Singapore is requiring stronger power transmission. Singapore Transmission Cable Tunnel is underground tunnel for transmission system installation such as 400 kV cable. This Transmission Cable Tunnel is 35 km long in total. The North-South Transmission Cable Tunnel is 18.5 km long and there is a total of three (3) contracts; NS1, NS2 and NS3 in respect of the design and construction. The East-West Transmission Cable Tunnel is 16.5 km long, and also there is a total of three (3) contracts; EW1, EW2 and EW3. Among of them, SK E&C has been awarded and operating contract EW2 and NS2. In scope of works, each contract has 3 to 4 shafts which connect aboveground and underground high volt cable and those shafts are used as TBM launching shafts during construction. Transmission Cable Tunnel is undercrossing middle of Singapore and most of shafts are located in urban area. Thus, optimal blasting design satisfying high blasting efficiency as well as blasting vibration limit of Singapore is highly required. Blasting design for large shaft of Singapore Transmission Cable Tunnel follows blasting vibration limits in Singapore and reflects our blasting engineering skills. With Singapore Transmission Cable Tunnel Contract EW2, it is expected that our excellent blasting engineering and performance skills can be delivered to the world.

A Study on the Characteristics of MS Delay Blasting Considering Cooperating Charge (협동장약을 고려한 MS 지발 발파 특성 연구)

  • Kang Choo-Won;Kim Jong-In;Park Joung-Bong
    • Explosives and Blasting
    • /
    • v.23 no.3
    • /
    • pp.11-18
    • /
    • 2005
  • The waveform at the blasting pattern using k13 delay electronic detonator depends on the interference of adjacent delay time according to the degree of distance and frequency. The degree of interference affects the size of blasting vibration at a measuring point. This study analyzed the cooperating change characteristics of MS delay blasting separately detonated at intervals of 40m and presented through frequency the delay time design method that is able to reduce the cooperation of blasting vibration at the MS delay blasting.

Study on Applicability of Asymmetry V-Cut method in Underground Mine (비대칭 V-cut의 갱내 광산에 대한 적용성 연구)

  • Kim, Jung-Gyu;Jung, Seung-Won;Kim, Jun-Ha;Kim, Jong-Gwan
    • Tunnel and Underground Space
    • /
    • v.31 no.6
    • /
    • pp.520-533
    • /
    • 2021
  • It is necessary to increase the blasting efficiency in order to minimize the economic loss caused when the excavation cross section is reduced due to the stability problem of underground mining development, and for this, a new blasting design is proposed. In this study, the blasting efficiency of the general design in the field, the suggestion designI, which added two columns to production blasting, and the suggestion design II, which added one column to create asymmetry, is compared. Advance rate and fragmentation were selected as the evaluation index of the blasting efficiency. In the case of advance rate, compared to the normal, the suggestionI improved by 6.07% and the suggestionII improved by 4.65%. In the case of fragmentation, based on P80, compared to the normal, the suggestionI reduced about 58% and the suggestionII was about 47%. Accoording to the evaluation index, the suggestion designI shows better blasting efficiency than the suggestion designII. But considering the additional work time and cost required for the suggestion designI due to the insignificant difference in the evaluation index results, the asymmetry V-cut, the suggestion designII, is judged to be a more suitable blasting design for the site.

Finite Element Analysis for Shot Blasting Process Optimization of Stainless Steel (유한요소해석을 이용한 스테인리스 스틸의 쇼트 블라스팅 공정 최적화)

  • Song, Seung Youp;Park, Junyoung;Kim, Jun-Sik
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.12 no.1
    • /
    • pp.22-27
    • /
    • 2013
  • A shot blasting process is to improve the surface quality of stainless steels. The process is similar to a well-known shot peening that is used to strengthen the surface via the residual stress. In the shot blasting process, it is important to decide many parameters, such as the size, incident angle and velocity of shot balls, to effectively get rid of the iron oxide on the surface of stainless steels. In this study, the simulation of the shot blasting process is carried out by a finite element software, which can help to find out the optimal design parameters to cause the delamination of the iron oxide from the stainless steel substrate. The results obtained are also compared to those of the discrete element method to verify them.

A Case Study on the Application of Vibration Level Units in the Construction Phase (시공단계의 진동레벨 단위적용에 관한 사례 연구)

  • Choi, Hyung-Bin;Kim, Dong-Yeon
    • Explosives and Blasting
    • /
    • v.30 no.2
    • /
    • pp.86-97
    • /
    • 2012
  • Ground vibration induced by a bench blasting in the construction site should cause the damage to the structure and indirect damage to a human body, and the vibration level is most practical descriptor for regulating the damage to human body and peak particle velocity is the descriptor for direct damage assesment of the structure. Meantime, the vibration level has not been considered for the blasting design but this study is the case that apply not only peak particle velocity but also vibration level on the blasting design. Also, we strongly believe that this study will be helpful for the management in the blasting site which some civil appeal is concerned. Total 232 measurements of both ppv and vibration level was used to estimate the scale distance. When the regulating threshold was ppv 0.3 cm/s and vibration level 75 decibel, the charge per delay to be estimated with vibration level could be recommended by 1.2~1.4 times than it of ppv. So, it is proven that considering vibration level on the blasting design is reasonable for not only prevention of the civil appeals but also effective blasting. Again, the blasting design which follows the law, "Noise and Vibration Control Act" can actually serve good condition to carry much more economical and effective blasting. The instruments used for this study are the SV-1 model, as first instrument in korea which can measure vibration velocity and vibration level at the same time.

Review of Applicability of the Standard Blasting Patterns of MLTM to Various Rock Types (국토해양부 표준발파패턴의 셰일암반 적용성에 관한 사례 연구)

  • Kim, Se-Hyun
    • Explosives and Blasting
    • /
    • v.27 no.1
    • /
    • pp.47-52
    • /
    • 2009
  • Blasting is necessary for excavation processes since more than 70% of korean land is consist of mountains. The vibration and noise accompanied by blasting processes usually bring about public complaints. Blasting patterns are chosen by economical efficiency, stability and construction conveniency. However, there are many alternatives without control to settle the popular complaint. To prevent those alternatives, standard blasting method for design and construction were suggested by MLTM (Ministry of Land, Transport and Maritime Affairs) in 2006. However, standard blasting pattern of MLTM was designed in a lump irrespective of types of rocks. Economical loss may occur by ignoring the characteristics of rocks for the applications to the rocks with low intensity, such as shale, or containing many joint. We deduced some economical progresses by performing test blasting with adjusted drilling spacing and length of burden considering the characteristics of local rock. This paper suggests the start of case studies for different applications. Economic improvement can be expected by applying those results deduced from case studies to design and construction.

Case Study of Blasting Pattern Design for Tunnelling in Which Considered Blast Induced Vibration Affected Across Buildings (터널 굴착 시 주변 구조물에 미치는 영향을 고려한 발파 설계 사례)

  • Baek, Seung-Kyu;Choo, Seok-Yeon;Yoon, Jong-O;Baek, Un-Il;Park, Hyung-Seop
    • Tunnel and Underground Space
    • /
    • v.16 no.5 s.64
    • /
    • pp.377-386
    • /
    • 2006
  • In generally blasting pattern design is carried out in-situ borehole blasting test and its analysis. We added the 3D numerical analysis for blast induced vibrations. This paper is case study of 3D numerical analysis in which considered blast induced vibration affected across buildings, and then we design the blasting pattern of tunnel excavation.

Suggesting Blasting Design for Kazakhstan mine using Korea Mining Technology (국내 광산 기술을 적용한 카자흐스탄 광산 발파설계 제안)

  • Jin, Yeon-Ho;Min, Hyung-Dong;Jeong, Min-Su;Park, Yoon-Suk;Heo, Eui-Haeng;Nurmatov, Murod
    • Explosives and Blasting
    • /
    • v.32 no.1
    • /
    • pp.10-17
    • /
    • 2014
  • In this study, the information achieved from the visit to Kazakhmys mine in Kazakhstan was introduced. An optimal blasting pattern designed for the mine with the application of Korean blast technology was suggested. As a result, it was found that the blast design can reduce the consumption of explosives and the number of drill holes. The blast design can reduce the overall production cost in the mine.