Assessing Contractor Competition in Competitive Bidding for Highway Construction Projects Using Network Analysis

  • Le, Chau;Arya, Minakshi;Moriyani, Muhammad Ali;Le, Tuyen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.18-24
    • /
    • 2022
  • State highway agencies (SHAs) typically apply a competitive procurement procedure to select contractors for their design-bid-build projects. Since the level of competition affects construction bid prices and project outcomes, the Federal Highway Agency (FHWA) suggests SHAs seek ways to improve competition among contractors continuously. However, they rarely conduct an empirical assessment of the current competition level necessary to identify room for improvement. Besides the number of bidders on a project, other factors such as winning or losing rates among the contractors in previous projects can also indicate the degree of competition; only a few contractors may have won the majority of the projects in a specific region. However, few studies have investigated such factors. This paper proposes a network analysis-based approach to evaluating contractor competition levels of highway projects using historical bid tabulation data. The proposed method provides insights into overall competition levels, the determination of competitive contractors, and winning rate distribution among contractors.

  • PDF

Development of Prediction Model of Subcontract's Bidding-Ratio for Private Apartment Projects (민간 공동주택 하도급 낙찰률 예측모델 개발)

  • Jang, Ki-Suk;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.250-251
    • /
    • 2021
  • A subcontract work order is the basis of the construction process and consists of the root and trunk of the construction industry. The construction process through a subcontract work order is an important element of project success, and it is the basic unit of creating profit in the construction industry. Therefore, correct analysis and forecasting of subcontract work orders allow correct estimation of construction cost and profit which is the foundation of corporate decision making. This study has started to provide predictions of subcontractor's bidding-ratio for decision-making. Since the actual project data has been used in this study, the contribution level of the model is highly expected in actual field. The statistical confidential level of adjusted decision coefficient is concluded low because of limited sample numbers. However, its accuracy and confidence level can be increased through increasing sample numbers, considering more variables, and studying of reducing error.

  • PDF

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF

Purchasing Status and Supplier Performance Evaluation of School Foodservice in Chanwon, Korea (창원시 학교급식 식재료 구매 실태 및 공급업체 수행도 평가)

  • Jung, Hoi-Jung;Kim, Hyun-Ah
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.41 no.6
    • /
    • pp.861-869
    • /
    • 2012
  • This study was conducted to investigate the purchasing status and to compare supplier performance evaluations between competitive bidding and negotiated contracts in school foodservice in Changwon, Korea. A total of 190 questionnaires were distributed and 167 (return rate 87.9%) were collected from June 29 to September 28, 2010, and then a total of 151 (analysis rate 79.5%) were used for the final analysis. First, 91.4% of food product purchases for school meals were contracted through competitive bidding, especially limited competitive bidding. It mainly consisted of agricultural products, processed food, and eco-friendly agricultural products (fruit). Second, 78.8% of schools purchased food products by negotiated contracts, while single negotiation accounted for 59.7%. Food products by negotiated contract consisted of meat, kimchi, and fish. Third, the purchase status of competitive bidding and negotiated contracts showed a significant difference in agricultural products (p<0.001), fish (p<0.001), meats (p<0.001), poultry (p<0.001), antibiotic-free poultry (p<0.001), eco-friendly grain (p<0.001), eco-friendly agricultural products (fruit) (p<0.001), eco-friendly processed food (p<0.001), processed products (p<0.001), milk (p<0.001) and general grain (p<0.001) except for kimchi. Fourth, comparative analysis of supplier performance evaluation (on a 5-point Likert scale) of school foodservice showed that price of product of competitive bidding (3.73) was significantly higher than that of negotiated contract (2.95) (p<0.001), and the overall performance level of the negotiated contract (3.85) was significantly higher than that of competitive bidding (3.61) (p<0.01). The supplier performance evaluation levels of product packaging (p<0.01), product quality at the time of delivery (p<0.001), hygiene of products (p<0.001), consistency to specification (p<0.001), swiftness of return and exchange (p<0.001), emergency delivery (p<0.001), service of delivery staff (p<0.05), and handling of complaints (p<0.001) of negotiated contracts were significantly higher than those of competitive bidding of school foodservice. In conclusion, school foodservice selected food suppliers both by adopting competitive bidding and negotiated contracts. And there was a significant difference of school foodservice supplier performance between competitive bidding and negotiated contracts in Changwon, Korea.

An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies (국내건설기업의 해외 프로젝트 입찰단계 우선집중역량 분석)

  • Kim, Ji Hyung;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.23-30
    • /
    • 2014
  • Overseas construction orders of domestic companies had been increased significantly in a short period from $10.9 billion in 2005 to $64.9 billion in 2012. However experts are concerned that quality of growth will not support quantitative growth. This study suggest concentrate competencies for not only winning in bid but also successful execution of domestic companies. 4 Steps which are Pre-Marketing, Bid-Preparation, Bidding, Contract Phase are defined for competency assessment. After drawing specific tasks by phase, survey asking importance and capability of the tasks to the person in charge of bidding and site was conducted by utilizing Likert 7 point scale. According to the result of IPA analysis, domestic construction companies need to ensure internal competencies; Project risk review, Bid team organization, and external competencies; Client needs grasp, Localization strategy, Cooperation establishment. Hearafter domestic construction companies will be able to utilize the result of the study for setting bidding strategy for winning in bid and improving earning rate.

A Delphi Study on the Price Escalation Clause in a Construction Contract

  • Choi, Min Soo;Kim, Moo Han
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.69-76
    • /
    • 2006
  • The purpose of this study is to suggest policies to improve the price escalation system in a construction contract through a Policy Delphi technique. The Delphi, including two times questionnaires and a group discussion, was conducted by joining 14 experts. Also, the escalation provisions of various countries were examined. Results of the Delphi showed that the minimum fluctuation rate for price escalation was desirable at a level of 3%. To compute the fluctuation rate, calculating the price fluctuation of overall articles was more desirable than using price indices. A bidding date was more reasonable as the initial date of change in price. Losses caused by price change should be shared between contractor and owner; therefore a deduction rate should be introduced in price escalation. Meanwhile, overhead and profit should be adjusted in proportion to the fluctuation rate; but advance payment or the delayed construction amount should be deducted from the adjusted amount.

A Study on the Characteristics of the Cultured Oyster Marketing in Sacheon Bay (사천만 양식 굴의 유통 특성 연구)

  • Bong-Yong Park;Jong-Ho Kang
    • The Journal of Fisheries Business Administration
    • /
    • v.53 no.4
    • /
    • pp.069-078
    • /
    • 2022
  • This study studied the characteristics of cultured oyster marketing in Sacheon Bay. The results of this study are summarized as follows. First, the GULDAE aquaculture is a unique production method of Sacheon Bay. Second, oysters in Sacheon Bay were low in production, but the price was more than 70% higher than in other producing areas. Third, profit is 12.5% higher and rate of return was 179.8%. Fourth, there were more out-of-market sales than other than other producing areas, and it is a bidding method. Fifth, the marketing cost was higher than the longline hanging aquaculture; however, the advantage of price offseted this point. Although the Sacheon Bay Oyster aquaculture is small, it was confirmed that it was a producing area with high profitability and a unique marketing form from other regions. Although the Sacheon Bay Oyster culture is small, it has been confirmed that it is a producing area with high profitability and shows a unique distribution form.

Incorporated Multi-State Nash Equilibriums For The Generation Allocation Considered Ramp Rate In the Competitive Power Market (경쟁적 전력시장에서 Ramp-rate를 고려한 발전량배분의 다중시간 통합 내쉬균형)

  • Park, Yong-Gi;Song, Hyoung-Yong;Lee, Joo-Won;Park, Jong-Bae;Shin, Joong-Rin
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.569_570
    • /
    • 2009
  • This paper presents a methodology to find the profit maximized Nash Equilibriums of each generator(or GenCo), which considers the Ramp-rate of each generator under a competitive market environment. The ramp-rate of a generator is one of the physical or technical constraints of a generator and means the ability to increase or decrease the output instantaneously. In this paper, we found several Nash Equilibriums of the generation allocation problem through Dynamic Programming in a competitive market. Individual generators participate in a game to maximize its profit through competitions and play a game with bidding strategies of its generation quantities in a spot market.

  • PDF

A Study of Improvement on Accident Rate Index of Construction Industry (건설업 산업재해발생율 평가지표 개선방안)

  • Lee, Miyoung;Oh, Sewook;Lim, Sejong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.108-119
    • /
    • 2016
  • Since the introduction of the converted accident rate in Pre-Qualification(PQ) process in 1992, the safety evaluation system has contributed to a reduction of construction accidents and development of the safety management system in public construction projects. As the comprehensive evaluation method the government plans to introduce includes the indicators 'accident rate' and 'death rate per 10,000 workers', the influences on the safety evaluation in the bidding process would be broader in public sector construction projects. However, the current safety evaluation system is operated by different estimating standards in the bidding process. At this point, a study of improvement on the safety evaluation index is required to review its current conditions and to propose its efficient operating method. Therefore, the purpose of this study is to analyze problems of the current safety evaluation system through the questionnaire survey on the qualified workers in construction safety management and to propose an improvement plan for the problems noticed. Our results suggest the standards of the unified process for the safety evaluation index, the size of construction firms needed for accident rate estimation, and the improvement plan for unreported accidents. The proposed improvement plan enables the reasonable estimation and efficient operation of the safety evaluation index, and further, it would contribute to reducing construction accidents through the activation of voluntary safety management by construction firms.

Estimation Method of the Competitive Bid-price in Bid-rigging of Public Construction (기댓값 분석에 따른 공공공사 입찰담합의 가상경쟁가격 산정방법)

  • Jeong, Kichang;Kim, Wooram;Kim, Namjoon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.52-60
    • /
    • 2018
  • Korea's public construction projects are under construction through bidding, however, due to the nature of the bidding, collusion between participants can occur. The collusion of bids accordingly damages the client. So, it is necessary to calculate the appropriate fictitious competition price to compensate for this. In this regard, econometrics methods are generally used, but there are limitations and issues arising from the nature of construction, especially design-build bid. Therefore, this study proposes a method to estimate reasonable competitive bid-price in design-build bid. It derives the lowest bid-price from the design submitted by the proponent and estimates the competitive bid-price by examining the factors according to the penetration rate according to the technical level of the tester, the skill level of the competitor, and the type of tester. Based on the method proposed in this study, a reasonable price can be derived that reflects the characteristics of the design and construction bidding bidder selection method and also it can be used as a reference material in the actual bidding process as well as calculating the damage due to the answer.