A Study for operation results of the comprehensive examination on tendering system in the cultural heritage repair and restoration, focusing on the cause of the decline in the winning bid rate (문화재수리 종합심사낙찰제·종합평가낙찰제 운영결과 및 낙찰률하락 원인 분석)

  • JUNG, Younghun;YUN, Hyundo
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.111-132
    • /
    • 2022
  • The comprehensive examination on tendering system has been introduced to the Cultural Heritage repair and restoration field since 2016 to remedy the repair issues of South Gate in 2014. The Cultural Heritage Administration tried to attain the high performance of the cultural heritage repair and restoration works securing the proper payment for the repair and restoration works. It is high time to review the operating performance of the comprehensive examination on tendering system (hereinafter referred to as the "CEOTS"), as the system has been run for over 5 years to correspond with its original goal, i.e., "The Proper Payment in return for the High Performance of Repair and Restoration works." This study intends to analyze 114 tenders of CEOTS from 2016 to 2020. As a result of the analysis of 114 tenders, firstly, more than half of bid winners were in the top 20% of repair & restoration capacity disclosure amount list, which mostly fulfilled the goal of 'attaining high performance.' Secondly, as the winning bid rate is decreasing from 86.847% in 2017 to 85.488% in 2020, the goal of 'guarantee of a proper payment' is not achieved yet. Thirdly, the influence of Economic Evaluation section in CEOTS has been grown since the change of scoring system in CEOTS in 2019. This study identifies two reasons why the winning bid rate of CEOTS has decreased. Firstly, it is caused by the fact that 'the group that got more than 1st place' and 'the first place group' that are more than half of the total bidders have the decreasing bidding rate trend as the years go by. Secondly, the exclusion rate of 'the group that got more than 1st place' is higher than the exclusion rate of 'the group that got less than 1st place', which means the expected winning rate would be lowered. It is proposed that the revision of CEOTS code is needed, i.e. easing the strict rule concerning the exclusion rate as well as setting up the lower bidding limit to prevent the excessive decreasing winning bid rate.

The Effect of Yearly Purchase Price Pattern in Electricity Transaction Between Utility and IPPs (IPP와의 전력거래에서 연도별 요금지불 구조의 영향)

  • 김창수;진병문;권영한
    • Journal of Energy Engineering
    • /
    • v.8 no.2
    • /
    • pp.265-271
    • /
    • 1999
  • In recent years, the electric utility industry in Korea has undergone fast change. Private power generation has been introduced by competitive bidding to improve economic efficiency and to strengthen the competitive generation market. In these private generation projects, the yearly pattern of purchase price between the utility and IPPs is very important. Currently, the levelized payment schedule is applied to capacity payment, and price escalation rates are reflected to energy payment. In this paper, we Proposed different patterns of payment and analyzed the outcomes. As a result, we found possibility of applying the partial front-loading pattern in Korean market to share the risk of the long-term business. And, the importance of discount rate is also found.

  • PDF

An Empirical Study on the Detection of Phantom Transaction in Online Auction (온라인 경매에의 카드깡 탐지요인에 대한 실증적 연구)

  • Chae Myeong-Sin;Jo Hyeong-Jun;Lee Byeong-Chae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.10a
    • /
    • pp.68-98
    • /
    • 2004
  • Although the internet is useful for transferring information, Internet auction environments make fraud more attractive to offenders because the chance of detection and punishment are decreased. One of fraud is phantom transaction which is a colluding transaction by the buyer and seller to commit illegal discounting of credit card. They pretend to fulfill the transaction paid by credit card, without actual selling products, and the seller receives cash from credit card corporations. Then seller lends it out buyer with quite high interest rate whose credit score is so bad that he cannot borrow money from anywhere. The purpose of this study is to empirically investigate the factors to detect of the phantom transaction in online auction. Based up on the studies that explored behaviors of buyers and sellers in online auction, bidding numbers, bid increments, sellers' credit, auction length, and starting bids were suggested as independent variables. We developed an Internet-based data collection software agent and collect data on transactions of notebook computers each of which winning bid was over 1,000,000 won. Data analysis with logistic regression model revealed that starting bids, sellers' credit, and auction length were significant in detecting the phantom transaction.

  • PDF

An Empirical Study on the Detection of Phantom Transaction in Online Auction (온라인 경매에서의 신용카드 허위거래 탐지 요인에 대한 실증 연구)

  • Chae Myungsin;Cho Hyungjun;Lee Byungtae
    • Korean Management Science Review
    • /
    • v.21 no.2
    • /
    • pp.273-289
    • /
    • 2004
  • Although the Internet is useful for transferring information, Internet auction environments make fraud more attractive to offenders, because the chance of detection and punishment is decreased. One of these frauds is the phantom transaction, which is a colluding transaction by the buyer and seller to commit the illegal discounting of a credit card. They pretend to fulfill the transaction paid by credit card, without actually selling products, and the seller receives cash from the credit card corporations. Then the seller lends it out with quite a high interest rate to the buyer, whose credit rating is so poor that he cannot borrow money from anywhere else. The purpose of this study is to empirically investigate the factors necessary to detect phantom transactions in an online auction. Based upon studies that have explored the behaviors of buyers and sellers in online auctions, the following have been suggested as independent variables: bidding numbers, bid increments, sellers' credit, auction lengths, and starting bids. In this study. we developed Internet-based data collection software and collected data on transactions of notebook computers, each of which had a winning bid of over W one million. Data analysis with a logistic regression model revealed that starting bids, sellers' credit, and auction length were significant in detecting the phantom transactions.

Study on the System Implementation for a Reliable Auction Right Analysis System with a Focus on Commercial Zone Analysis (상권분석시스템을 통한 신뢰성 기반의 상가건물 권리분석 프로그램 개발에 관한 연구)

  • Kim, Sangbeom
    • Journal of Digital Contents Society
    • /
    • v.16 no.5
    • /
    • pp.767-773
    • /
    • 2015
  • This study suggests a reliable auction right analysis system that improves the existing auction right analysis in a sense that the system is more applicable to a real economic world. The existing study has used an auction successful bidding price rate and an auction successful contract price for its estimation of the auction right analysis. But in this paper the degree of market vitality which is provided from the commercial zone analysis is used as an input variable so the expected auction price can be estimated and the auction right analysis is conducted in that manner.

Cause Analysis of Cost Overruns in International Infrastructure Project Conducted by Korean Contractors (해외토목 원도급사업의 원가상승 원인에 관한 연구)

  • Jung, Wooyong;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.105-116
    • /
    • 2017
  • In recent years, large Korean construction companies have suffered serious losses in their overseas business. Many practitioners and researchers have analyzed causes of cost overrun in these projects. However, these arguments have not been empirically verified based on acutal project cases. This study investigated cost overrun rate, contingency, allowance, predicted risk before bidding, and actual and residual risk after award in the 67 international infrastructure projects conducted by 13 large construction companies. The causes of cost overruns are derived as follows. First, they identified the possibility of cost overrun to some extent before the bidding, but did not reflect the enough risk money to bid price. In particular, this behavior was more severe in badly cost-overrun projects. Second, the causes of cost overrun were more influenced by external environmental risk than internal capability risk. However, the internal risk in badly cost-overrun projects was relatively high compared to cost-underrun projects. Third, badly cost-overrun projects failed to mitigate risk. However, cost underrun projects were affected more by low exterior risk conditions than by well mitigated risk. This study provides more informed knowledge in controlling project costs in international infrastructure projects.

A Study on the Policies to improve the Escalating Regulations of Construction Price - With a Focus on Results of a Delphi Survey - (물가 변동에 따른 건설공사비 조정 제도의 개선 방안 - 델파이(Delphi) 설문 조사 결과를 중심으로 -)

  • Choi Min-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.203-211
    • /
    • 2004
  • This study is the results to survey on the problems and improvable Policies for current escalation system in construction contracts, through a Delphi survey to experts. From the survey results, it is desirable to decide the fluctuation rate of construction cost, which is the requirement of escalation clause, on the basis of inflation rate or construction cost index. The desirable price fluctuation rate is proposed as a $3\%$ level. However, it is difficult for construction companies to cope with the sudden increase of material price in advance, arising from short-term shock factors such as exchange rate and international raw material's price. Accordingly escalation system for specified materials, as an exceptional mode, should be introduced. As a method to calculate the fluctuation rate, ARCA(adjustment rate for the categories of articles) is more desirable than ARI(adjustment rate for an index), because the ARCA can be more reflected the characteristics of each construction work.To rationalize the ARI method, it is needed to announce the wage index, material index and machinery expense index via detailed classification by construction types. Also, it is desirable to prescribe the bidding date as a starting date of the price change, rather than contact signing date. considering the price change can happen since the biddiilg stage.

Ripple Effect Analysis of Construction Standard Unit Price in Public Construction (공공건설공사 표준시장단가 적용 파급효과 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho;Lee, Ju-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.

Improvement on the Managerial Method of Price Fluctuation System (물가변동제도 운영방식 개선방안)

  • Lee, Jae-Seob;Shin, Young-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.3-11
    • /
    • 2011
  • There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.

A Study on Perceived Problems of and Improvement Measures for Asbestos Abatement Companies in Support of Related Policies (석면 해체 및 제거 업체가 느끼는 관련 제도의 문제점 및 개선방안에 관한 연구)

  • Chang, Jaepil;Rho, Youngman;Jung, Kihyo
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.30 no.1
    • /
    • pp.28-38
    • /
    • 2020
  • Objectives: The purpose of this study is to identify the perceived problems of and suggest improvement measures for asbestos abatement companies in support of asbestos-related systems and policies. Methods: For this study a questionnaire was prepared consisting of current work (two questions), the contribution and necessity of a risk assessment system for asbestos abatement (two questions), and problems with and improvement measures for systems and policies (nine questions). The questionnaires were sent to 2,170 asbestos abatement companies and were returned by 83 companies (return rate = 3.8%). We conducted frequency analysis, ANOVA, and a Chi-squared test at the 5% significance level. Results: Asbestos abatement companies expressed difficulties with complying with wet work (43% of unenrolled managers), negative pressure enclosure (36% of all respondents), and installation and use of decontamination units (26% of all respondents) as stipulated in the relevant regulations. In addition, 43% of the respondents expressed concerns that the expertise of the company was not considered during bidding for asbestos abatement and hoped that an advantage (e.g., bid point) would be given to the upper grades for asbestos risk assessment (38%). Asbestos abatement companies generally rented and used negative pressure devices (including negative pressure recording devices) and suggested that periodic calibration (32%) is needed to ensure the performance of the rented equipment. Finally, the respondents asked for clear definitions for three situations specified in the Occupational Safety and Health Acts: (1) temporarily leaving the asbestos abatement workplace; (2) tasks with less airborne asbestos; and (3) physically breaking or cutting using a machine. Conclusions: The problems and improvement measures identified in this study of asbestos abatement companies can be utilized as fundamental information for the improvement of the systems and policies for safe asbestos abatement.