• Title/Summary/Keyword: bi-directional pile load test specification

Search Result 4, Processing Time 0.018 seconds

A study on case analysis for loading capacity standard establishment of bi-directional pile load test (BD PLT) (양방향말뚝재하시험의 재하용량 기준 설정을 위한 사례분석 연구)

  • Choi, Yong-Kyu;Seo, Jeong-Hae;Kim, Sang-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.377-384
    • /
    • 2008
  • In the bi-directional pile load test (BD PLT) for pile load test of Mega foundation, loading capacity specification were not specified exactly. Therefore there are so many confusions and variations of maximum 2 times in loading capacity are come out. In this study, specifications of bi-directional pile load test (BD PLT) were considered. Based on cases of the bi-directional pile load test performed in domestic areas, maximum equivalent test load, test load increasing ratio and sufficiency ratio of design load were analyzed. It can be known that the loading capacity specification of bi-directional pile load test must be defined as 1-directional test load that is established as more than 2 times of design load.

  • PDF

Study on Development of the Bi-directional High Pressure Pile Load Test(BDH PLT) and Its Application (양방향 고유압 말뚝재하시험(BDH PLT)의 개발 및 적용성에 관한 연구)

  • Lee, Chung-Sook;Lee, Min-Hee;Kim, Sang-Il;Choi, Yong-Kyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.6
    • /
    • pp.23-36
    • /
    • 2007
  • To overcome the limits of the static pile load test for large diameter drilled shafts, bi-directional low pressure pile load test (BDL PLT) has been used but this test method containes some problems that has not been solved basically. That is, BDL PLT has some problems: difficulty in jack (or cell) arrangement for large test capacity, void remain inside jack (or cell) due to the unrecovery of piston after test etc. In this study, bi-directional double-acting high pressure pile load test (BDH PLT W/DOJ) was developed and confirmed for a in-situ large diameter drilled shaft. At present, test specification of bi-directional pile load test (BDPLT) is being made, and severed main issues (such as, test kinds, test capacity, necessity of use of double-acting and attention of application to service pile) will be contained at the specification.

A Case Study on Construction Cost Reduction of Large-size Building Foundation using Bi-directional High Pressure Pile Load Test(BDHPLT) (양방향 고유압 말뚝재하시험을 이용한 대형건축물 기초의 공사비 절감에 관한 사례 연구)

  • Kim, Nam-Il;Kim, Sang-Il;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.518-525
    • /
    • 2009
  • The bi-directional high pressure pile load test(BDH PLT) which is a kind of pile load tests was conducted to find out a reasonable design procedure of large-diameter drilled shafts of large-size building structures. The behaviors of bearing capacity and settlement of the large-diameter drilled shafts were analyzed and the results obtained from BDH PLT were also compared with those obtained from the equations suggested in the specification. In case of the reasonable design procedure adopted, the construction cost could be saved at least 15 ~ 28%. It could be concluded that BDH PLT should be needed for the foundation construction cost reduction of the high-rise building structures.

  • PDF