양방향말뚝재하시험의 재하용량 기준 설정을 위한 사례분석 연구 (A study on case analysis for loading capacity standard establishment of bi-directional pile load test (BD PLT))

  • 최용규;서정혜;김상일
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.377-384
    • /
    • 2008
  • In the bi-directional pile load test (BD PLT) for pile load test of Mega foundation, loading capacity specification were not specified exactly. Therefore there are so many confusions and variations of maximum 2 times in loading capacity are come out. In this study, specifications of bi-directional pile load test (BD PLT) were considered. Based on cases of the bi-directional pile load test performed in domestic areas, maximum equivalent test load, test load increasing ratio and sufficiency ratio of design load were analyzed. It can be known that the loading capacity specification of bi-directional pile load test must be defined as 1-directional test load that is established as more than 2 times of design load.

  • PDF

양방향말뚝재하시험의 재하용량 기준에 관한 연구 (A Study on the Loading Capacity Standard of Bi-directional Pile Load Test (BD PLT))

  • 최용규
    • 대한토목학회논문집
    • /
    • 제28권6C호
    • /
    • pp.379-388
    • /
    • 2008
  • 대형말뚝기초의 양방향 재하시험에서 재하용량 기준이 정확하게 규정되어 있지 않다. 그래서 양방향말뚝재하시험을 수행함에 있어 많은 혼란이 발생하고 있으며 재하용량에서 최대 2배까지의 차이가 나타나고 있다. 본 연구에서는 양방향 말뚝재하시험 기준들을 고찰하였으며, 국내에서 수행된 양방향 말뚝재하시험 사례들에 기초하여 최대등가시험하중, 재하하중 증가비, 재하용량 증가비 및 설계하중 충족비를 분석하였다. 양방향 말뚝재하시험 기준은 1방향 재하용량으로 정의되어야 하며, 1방향 재하용량은 설계하중의 2배 이상 이어야 한다는 것을 알 수 있었다.

양방향 말뚝재하시험 기준 제정에 나타난 주요 개념 (Principal Concepts on Bi-directional Pile Load Test Specification)

  • 최용규;정성민
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.603-608
    • /
    • 2006
  • In this paper, principal concepts on bi-directional pile load test(BD PLT) specification were explained. These main concepts are kinds of BD PLT, loading capacity, reporting the test results to relevant association etc.

  • PDF

양방향 고유압 말뚝재하시험(BDH PLT)의 개발 및 적용성에 관한 연구 (Study on Development of the Bi-directional High Pressure Pile Load Test(BDH PLT) and Its Application)

  • 이충숙;이민희;김상일;최용규
    • 한국지반공학회논문집
    • /
    • 제23권6호
    • /
    • pp.23-36
    • /
    • 2007
  • 대구경 현장타설말뚝에 대한 정재하시험의 한계를 극복하기 위하여 양방향 저압 말뚝재하시험이 개발되어 사용되어오고 있으나 이 방법 또한 근원적으로 해결되지 않은 문제점을 내포하고 있다. 즉, 양방향 저압 말뚝재하시험은 대용량 실린더의 배치곤란 및 시험 종료 후 실린더의 미복원에 따른 장치 내 빈 공간잔류 등의 문제점을 내포하고 있다. 본 연구에서는 양방향 복동식 고유압 말뚝재하시험(BDH PLT ; Bi-directional High Pressure Pile Load Test)을 개발하였으며 실제 현장에서 시행된 사례를 분석하여 양방향 복동식 고유압 말뚝재하시험에 대한 적용성을 확보하였다. 현재 양방향 말뚝재하시험 규정이 제정 중에 있으며, 시험종류, 재하용량, 복동식 잭 사용 필요성, 사용말뚝에 적용 시 주의점 등의 주요개념이 포함될 것이다.

양방향 말뚝재하시험(BD PLT)을 적용한 초고층 건축구조물의 기초설계 및 시공사례 (A Case Study of a Foundation Design and Construction of a High-rise Building Applying Bi-directional Pile Load Test(BD PLT))

  • 김성호;이민희;황근배;최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.539-550
    • /
    • 2006
  • New Songdo city is currently developing on the reclaimed land on a marine deposit and among the development the four sixty-four(64) stories high rise buildings are under construction at block 125. The ground condition of the site is comprised of a deep seated weathered rock staratum under a soft marine deposit layer. As a foundation system, a bored pile was planned to transmit the applied load to the stable layer. In this study, the behavior of the weathered rock especially locating at a upper part having a weak strength(HWR, MWR) has been evaluated through series of hi-directional pile load test(BD PLT) carried out on the 3 drilled shafts socketed in a weathered rock layer in a design stage. It has been planned to increase the effect of the tests that the length of test piles was prepared short enough to perform the test under a high stress. The summary of the design reflecting the test results has been made up. In addition, the 4 hi-directional pile tests excuted on the working piles during the construction stage for the purpose of confirmation and the evaluation of the adequacy of the pile behaviors have been included in this study.

  • PDF

양방향 말뚝선단재하시험에 의한 암반근입 현장타설말뚝의 하중-침하거동 분석 (Load-Settlement Behavior of Rock-socketed Drilled Shafts by Bi-directional Pile Load Test)

  • 설훈일;정상섬;한근택;김재영
    • 한국지반공학회논문집
    • /
    • 제24권11호
    • /
    • pp.61-70
    • /
    • 2008
  • 본 연구에서는 국내 4개 지역에서 시공된 총 10본의 대구경 암반 근입 현장타설말뚝의 양방향 말뚝 선단재하시험과 일반적인 말뚝두부 재하시험을 토대로 하중 재하방식에 따른 말뚝의 침하거동 및 하중전이 거동 특성을 분석하였다. 이로부터 양방향 재하하중을 받는 현장타설말뚝의 등가 말뚝 두부하중침하 거동을 고찰하곤 기존 등가 두부하중침하 곡선 산정방법과의 비교분석을 통하여 주면하중에 의해 추가적인 선단침하량의 영향정도를 분석하였다. 본 연구결과, 주면하중에 의해 발생되는 선단침하량을 고려한 하중전이해석(coupled load transfer analysis)을 통한 하중-침하량 예측값은 정재하 시험결과를 적절히 예측하는 것으로 나타났으나, 근사적 해석법을 통한 등가 하중-침하 곡선 및 일반적인 하중전이해식(uncoupled load transfer analysis)의 예측값은 정재하 시험결과에 비해 침하량을 과소 평가할 수 있음을 알 수 있었다. 하지만, 시험말뚝 근입부분의 암반층이 매우 단단할 경우 주면하중에 의한 선단침하량이 매우 작은 것으로 나타났다.