A Case Study of a Foundation Design and Construction of a High-rise Building Applying Bi-directional Pile Load Test(BD PLT)

양방향 말뚝재하시험(BD PLT)을 적용한 초고층 건축구조물의 기초설계 및 시공사례

  • Published : 2006.10.27

Abstract

New Songdo city is currently developing on the reclaimed land on a marine deposit and among the development the four sixty-four(64) stories high rise buildings are under construction at block 125. The ground condition of the site is comprised of a deep seated weathered rock staratum under a soft marine deposit layer. As a foundation system, a bored pile was planned to transmit the applied load to the stable layer. In this study, the behavior of the weathered rock especially locating at a upper part having a weak strength(HWR, MWR) has been evaluated through series of hi-directional pile load test(BD PLT) carried out on the 3 drilled shafts socketed in a weathered rock layer in a design stage. It has been planned to increase the effect of the tests that the length of test piles was prepared short enough to perform the test under a high stress. The summary of the design reflecting the test results has been made up. In addition, the 4 hi-directional pile tests excuted on the working piles during the construction stage for the purpose of confirmation and the evaluation of the adequacy of the pile behaviors have been included in this study.

Keywords