• 제목/요약/키워드: ballasted railway track

검색결과 82건 처리시간 0.027초

크리너 작업구간 선로안정화 상태평가에 관한 연구 (A Study on the Assessment of Track Stabilization on Ballast Cleaning work site)

  • 전일식;이승열;최형수;김한집
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.268-274
    • /
    • 2011
  • In railway, Ballast plays an essential role as intermedium in transmitting train load to subgrade safely. Gyoung-Bu HSL 1st phase consists of ballasted track except for over 5km long tunnels. Ballast track occurred track irregularity by train loads and requires periodic maintenance work. However, Repetitive train operation and tamping work cause to accelerate track irregularity and ballast deterioration such as abrasion and crushing. For these reason, Track irregularity areas had occurred ballast cleaning work to improve track quality. However, for the train to run safety, ballast cleaner working area needs train speed reduction and track stabilization work due to ballast relaxation and initial settlement. In this study, according to train speed-up and cumulative traffic tonnage, we measured and analyzed the track settlement and acceleration of sleepers to evaluate of track stabilization in order to keep the ballast condition stable after cleaning work.

  • PDF

다양한 궤도틀림 데이터의 신뢰성 검토 (A Study on the Reliability of Various Track Recording Data)

  • 이지하;안성혁;박혜종;김박진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.435-441
    • /
    • 2011
  • Track geometry changes by traffic loads. The bigger the changes are, the worse the riding comfort and running stability of train. This is so-called track irregularity and is the most important quality parameters of ballasted track. To objectively assess track irregularity, track geometry should be able to be measured. Practically, railway companies in Korea use various track recording equipments to measure track irregularity. But this various equipments output different data due to their geometrical structure even measured at same location. In this report, the correlation of various track recording data used in Korea was reviewed.

  • PDF

궤도틀림 검측 데이타의 확률분포 검토 (Probability Distribution of Track Recording Data)

  • 이지하;나성훈;김박진;최유복
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.310-314
    • /
    • 2010
  • Track geometry changes by traffic loads. The bigger the changes are, the worse the riding comfort and running stability of train. This is so-called track irregularity and is the most important quality parameters of ballasted track. To objectively assess track irregularity, track geometry should be able to be measured. Practically, railway companies in Korea use normal distribution as probability distribution of track irregularity. But some countries use non-normal distribution according to their own track recording system. In this report, reviewed probability distribution of Kyung-Bu high-speed line and tested normality.

  • PDF

고속철도 뜬침목 발생량에 대한 정량적 연구 (Study on the quantification of void between floating sleepers and ballast bed in th high-speed railroad line)

  • 김석동;박용걸;김대상;김학균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.370-375
    • /
    • 2005
  • Floating sleepers in a ballasted track increase both track deterioration and track irregularities. Consequently, a considerable maintenance work is required and maintenance cycle is shortened due to the floating sleepers. This paper quantifies the degrees of void between the floating sleepers and a ballast bed. In the future, the influence of floating sleepers on the track will be investigated by an analytical method using a dynamic model.

  • PDF

궤도구조 변경에 따른 열차 진동 추정식 제안 (Suggestion for Train Vibration Equations based on Change in Track System)

  • 김응록;박연수;강성후;박선준;김흥기
    • 한국철도학회논문집
    • /
    • 제5권1호
    • /
    • pp.48-54
    • /
    • 2002
  • This research estimated decreased vibration level as quantitative according to change of track system on Seoul Subway Line No. 1 from existing ballasted track system(Pandrol type clip) to concrete track system(Youbgdan type isolation rubber clip). Following change to concrete system, vibration level at tunnel floor decreased between 4-8dB(V). Vibration equations suggested in this paper consider the velocity of train and can estimate quantitative vibration response. These are divided by ultimate limit state($\beta$=0), serviceability limit state($\beta$=1.28) and safety state($\beta$=3), respectively. The reliability index, $\beta$=0, means 50% data line obtained by least squares best-fit line. The reliability index $\beta$=1.28 and 3 represent boundaries below 90% and 99.9% respectively.

콘크리트 궤도의 최적 탄성에 관한 연구 (A Study on the Optimum Stiffness of Concrete Slab Track)

  • 공선용;김상진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1085-1090
    • /
    • 2007
  • In recent railway construction, the concrete slab track is getting highlighted as main stream in track type. However, it is the fact that there are different opinions in selection of the optimized spring coefficient of elastic pad. In this study, the performance of vibration reduction in different stiffness of rail pad for ballasted track was compared, and the changes in characteristics, such as static/dynamic deflection of components, vibration acceleration, insertion loss etc., were analysed by using ISI Program for various types of rail fastening system used in concrete slab track. It was concluded that the fastening system with softer pads has shown the better performance of vibration reduction in concrete slab track and the optimized static stiffness has been calculated to 21.1kN/mm for conventional railways, 17.6kN/mm for high-speed railways and 17.8kN/mm for subways.

  • PDF

GPR/PBS/FWD를 이용한 도상/노반 상태평가 기술 개발 (Development of ballast/subgrade investigation technique using GPR/PBS/FWD)

  • 김대상;박태순;강승구
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1113-1118
    • /
    • 2004
  • Ballasted track is constructed in consideration of the maintenance. The application time and frequency of MTT(Multiple Tie Tamper) and BS(Ballast Cleaner) depend on track geometry measurements. This paper presents the application of Ground Penetrating Radar(GPR), Falling Weight Deflectometer(FWD), and Portable Ballast Sampler (PBS) to evaluate the effects of track geometry due to substructure deterioration and to build a reliable substructure evaluation system.

  • PDF

철도 BIM의 룰 항목 도출을 위한 설계기준 검토 (A Review on Track Design Standards for Selection of Rule Items for Railway BIM)

  • 박수열;배영훈;박영곤;김석
    • 한국BIM학회 논문집
    • /
    • 제12권3호
    • /
    • pp.30-38
    • /
    • 2022
  • Railway is compsed in various components, such as subgrade, track bed, sleeper, rail, and overhead line, on a linear space. Therefore, comprehensive work for various design standards and guidelines is required when designing a railway facility. For this reason, much time and effort are required to review the relevant design standards and guidelines. While, automatic legal check system for BIM models has been developed in the architectural engineering, it has not been developed in the railway engineering. This study reviews the korean design standard and the korean code for railway engineering, and suggests some rule items of logical information. Comparing the suggested rule items to the railway BIM library, items of logical information and additional attribute information are obtained. The analysis results of railway design standards and BIM library presented in this study would be utilized for defining rule-set items that is essential for development of the automatic legal check system for railway BIM models.

교량신축부에서의 궤도틀림 저감을 위한 활동체결구 및 침목결속 효과 (The Effect of the ZLR and Tied Sleeper to Reduce the Track Irregularity in the Bridge Expansion Joint Zone)

  • 강태구;민경주;임남형
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2405-2408
    • /
    • 2011
  • In recent time, the cause analysis and the reduction of the track irregularity have become the most important issue in the ballasted track on the high-speed railway bridge. This is because that the frequency of the maintenance work at the bridge expansion joint zone is on the rise. The track irregularity on the railway bridge starts at the end of the bridge-deck and spreads along the bridge. Due to the dynamic vibration and the thermal expansion of the bridge, the compaction of the ballast gravel on the bridge expansion joint zone become loose and then the progress of the track irregularity result from the train-induced dynamic impact is accelerating further. Among the several options for reducing the track irregularity on the bridge expansion joint zone, the application and efficiency of the zero longitudinal restraint(ZLR) and tied sleeper are investigated in this paper. Field test construction has been conducted, then the progress of the track irregularity and the frequency of the maintenance work are analyzed before and after the filed test construction. Of the two methods, it is shown that the installation of the ZLR seems to be better than the tied sleeper.

  • PDF

측량과 현방식 궤도틀림 측정 비교 (Comparison of Chord method with Surveying in Track irregularity Measurement)

  • 이지하;이상진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1647-1652
    • /
    • 2008
  • Track geometry consists of tangent and curved lines, which caused undesirable changes in initial track geometry by traffic loads. The bigger the changes are, the worse the riding comfort and running stability of train. This is so-called track irregularity and is the most important quality parameters of ballasted track. To be able to objectively assess track irregularity, track geometry should be able to be measured. Practically, railway companies use moving chord method, this method determine versine values via a chord. The versine is the vertical distance to curve measured in the middle of the chord. This type of method measures only versine of track irregularity curve by transfer function from specific property of measuring tool. In this report, review the characteristics of two types of measuring tools by comparing the measurements. The one is GRP-1000 system, optical surveying system with Total station and lazar prism trolly. This calculates track geometry by surveying absolute coordinates of two points each on both rail heads. The other is Trackmaster, measures versine with 2m of chord length.

  • PDF