• Title/Summary/Keyword: avoided cost

Search Result 114, Processing Time 0.022 seconds

A Study on the $H_{\infty}$ Robust Controller for Adaptive Control-polynomial approach (적응제어를 위한 $H_{\infty}$ 강인제어기의 설계-다항식 접근방법)

  • Park, Seung-Kyu
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.936-938
    • /
    • 1996
  • The $H_{\infty}$ robust controller is designed for on-line adaptive control application by using polynomial approach. The $H_{\infty}$ robust controllers for adaptive system were designed first by Grimble. But they have a problem that two minimum costs can exist and did not minimize the conventional $H_{\infty}$ cost function which is the $H_{\infty}$ sum of weighted sensitivity and complementary sensitivity terms. In this paper, the two minimum costs problem can be avoided and the conventional $H_{\infty}$ cost function is minimized by employing the Youla parameterization and polynomial approach at the same time. In addition pole placement is possible without any relation with weighting function.

  • PDF

Economic Analysis on a PV System in an Apartment Complex (공동주택 태양광발전 시스템의 경제성 평가)

  • Kim, Jin-Hyung
    • Journal of Climate Change Research
    • /
    • v.1 no.2
    • /
    • pp.163-177
    • /
    • 2010
  • This study analyzes the economies of photovoltaic systems in an apartment complex of 1,185 households, in cases of feed-in tariff and subsidy for solar home program of the government. When including the revenue only from electricity sales, NPVs of subsidy and that of feed-in tariff are -560 million KRW and -87 million KRW respectively. With the avoided social cost included without the revenues from CERs, NPVs of subsidy and feed-in tariff are -556 million KRW and -84 million KRW respectively. With the revenues from CERs, NPV of subsidy is -526 million KRW and NPV of feed-in tariff is -54 million KRW. As results of sensitivity analysis based on the changes in capital costs and discount rates, while all scenarios with subsidy including the revenues from CERs are not commercially viable, all scenarios with feed-in tariff exclusive of the revenues from CERs are commercially viable when discount rate is less than 7.2% or capital cost is less than 6,840 thousand KRW/kW. In the cases that include the avoided social cost, while all scenarios with subsidy including the avoided social cost as well as the revenues from CERs are not commercially viable, all scenarios with feed-in tariff are commercially viable without the revenues from CERs when discount rate is less than 7.2% or capital cost is less than 6,856 thousand KRW/KW. The results indicate that the changes in discount rates do not influence the revenues from CERs, but the revenues from electricity sale. Considering that the number of apartment complex and the positive environmental and social benefits from PV system, government needs to promote its diffusion.

Impact of BMP Allocation on Discharge and Avoided Costs in an Urbanized Watershed (최적관리기법 위치분배에 의한 유역단위 하천유량과 회피비용 변화에 관한 연구)

  • Kang, Sang-Jun
    • Journal of Environmental Policy
    • /
    • v.9 no.1
    • /
    • pp.83-107
    • /
    • 2010
  • Urbanized environments are constructed to estimate peak flow and cost savings in response to possible BMP allocation at a watershed scale. The main goal is to explore the proper allocation of sub-watershed level BMPs for peak flow attenuation at a watershed scale. Since several individual site scale BMPs work as a form of aggregated BMPs at a sub-watershed scale, it is a question as to how to properly allocate the sub-watershed level BMPs at a watershed scale. The Hydrological Simulation Program-FORTRAN (HSPF) is set up for a hypothetically urbanized watershed. A peak flow is determined to be the primary variable of interest and targeted to characterize the spatial distribution of aggregated BMPs. Construction cost of a regional pond forms the basis of the economic valuation. The results indicate that when total size of BMPs is constant in the entire watershed, (1) it is most effective to have aggregated BMPs in some upper sub-watersheds while the BMPs in either the mainstem sub-watershed or a single sub-watershed are the least effective choices for peak flow attenuation at a watershed scale; (2) savings exist between allocation differences and reduced peak flow increases cost savings. The largest saving is found in the strategy of aggregated BMPs in some upper sub-watersheds. These findings, however, call for follow-up site specific case studies revisiting the watershed scale impacts of BMP allocation. Then, it will be argued that location and extent of decentralization are considerable policy variables for an alternative stormwater management policy at a watershed scale.

  • PDF

An accurate and cost-effective fuzzy logic controller(I)-A VHDL design and simulation (고정밀 저비용 퍼지 제어기(I)-VHDL 설계 및 시뮬레이션)

  • 김대진;조현인
    • Journal of the Korean Institute of Telematics and Electronics C
    • /
    • v.34C no.7
    • /
    • pp.38-50
    • /
    • 1997
  • This paper concerns a VHDL design and simulation of an accurate and cost-effective fuzzy logic controller (FLC). The accurcy of the proposed FLC is obtained by using the center of gravity (COG) defuzzifier that considers both membership values and spans of membership functions in calculating a crisp value. The cost-effectiveness of the proposed FLC is obtained by restructuring the conventional FLC in the following ways: Firstly, the MAX-MIN inference is inference is replaced by a read-modify-write operation that can be implemented economically in the structure of register files. Secondly, the division in the COG defuzzifier is avoided by finding the moment equilibrium point. The proposed COG defuzzifier has two disadvantages that it requires additional multipliers and it takes a lot of computation time to find the moment equilibrium point. The first disadvantage is overcome by replacing the mulitpliers with stochastic AND operations and the second disadvantage is alleviated by using a coarse-to-fine searching algorithm. The proposed FLC is described in VHDL structurally and behaviorally and whether it is working well or not is checked on SYNOPSYS VHDL simulator by using the truck backer-upper control problem.

  • PDF

Development of Techno-Economic Evaluation Model for CCS (Carbon Capture & Sequestration) (CCS (Carbon Capture & Sequestration) 기술·경제성 평가 분석)

  • Lee, Ji Hyun;Kwak, No-Sang;Lee, Dong Woog;Shim, Jae-Goo;Lee, Jung Hyun
    • Journal of Climate Change Research
    • /
    • v.7 no.2
    • /
    • pp.111-120
    • /
    • 2016
  • In this study, Techno-economic evaluation model for carbon capture & sequestration (CCS) technologies are reviewed. Based on a key parameters of Korea's electricity market, performance data of 10 MW-scale post-combustion $CO_2$ capture pilot plant in Boryong station, the cost of $CO_2$ avoided was evaluated followed by international guideline suggested by IEA CCS costing methods task force. The result showed that Korea's Electricity cost including CAPEX & OPEX of reference power plant is relatively low compared to OECD nations which lead to a lower CCS cost ($33USD\;t/CO_2$). And future work using newly evaluated CAPEX & OPEX data of power plant with/without CCS is recommended.

Cost-benefit Analysis of Massive Screening for Inborn Errors of Metabolism in Korea (선천성대사이상검사 사업의 비용편익 분석)

  • Kim, Sun-Mean;Hwang, Na-Mi;Kim, Chang-Yup
    • Journal of Preventive Medicine and Public Health
    • /
    • v.32 no.3
    • /
    • pp.317-324
    • /
    • 1999
  • Objectives: Since 1991, nationwide massive neonatal screening program for phenylketonuria (PKU) and congenital hypothyroidism have been performed in Korea. As in many other countries, efficiency of this program has not been definitely concluded. For the purpose of evaluation of this program, from the perspective of efficiency, a cost-benefit analysis was carried out. Methods: Costs of the detection and the treatment program were compared with the projected benefit(avoided costs) that results from the prevention of the mental retardation associated with the disorders due to PKU and hypothyroidism. Costs and benefits were discounted at an annual rate of 5%, and duration of life-long labor was assumed to be 30 years. Cost and benefit were estimated based on the detection rates of one case of PKU per 5,572 and one case of congenital hypothyroidism per 32,554 babies screened during 1991-1997. Results: The benefit-cost ratio was 0.418. The sensitivity analysis for the discount rates and labor durations showed that most cost-benefit ratios were lower than one(1.0) except when discount rate was changed to 3% and detection rate to two- or threefold and/or labor duration to 40 years. Conclusion: The result of this study suggested that present program of mass screening for PKU and congenital hypothyroidism could not be justified in terms of efficiency. It doesn't coincide with the results of previous studies in major developed countries, presumably because of difference in detection rates and welfare cost for the disabled.

  • PDF

Elimination of Lancet-Related Needlestick Injuries Using a Safety-Engineered Lancet: Experience in a Hospital

  • An, Hye-sun;Ko, Suhui;Bang, Ji Hwan;Park, Sang-Won
    • Infection and chemotherapy
    • /
    • v.50 no.4
    • /
    • pp.319-327
    • /
    • 2018
  • Background: Lancet-related needlestick injuries (NSIs) occur steadily in clinical practices. Safety-engineered devices (SEDs) can systematically reduce NSIs. However, the use of SEDs is not active and no study to guide the implementation of SEDs was known in South Korea. The lancet-related NSIs may be eliminated to zero incidence using a SED lancet with effective sharp injury protection and reuse prevention features. Materials and Methods: We implemented a SED lancet by replacing a conventional prick lancet in a tertiary hospital in a sequential approach. A spot test of the new SED was conducted for 1 month to check the acceptability in practice and a questionnaire survey was obtained from the healthcare workers (HCWs). A pilot implementation of the SED lancet in 2 wards was made for 1 year. Based on these preliminary interventions, a hospital-wide full implementation of the SED lancet was launched. The incidence of NSIs and cost expenditure before and after the intervention were compared. Results: There were 29 cases of conventional prick lancet-related NSIs for 3 years before the full implementation of SED lancet. The proportion of prick lancet-related NSIs among yearly all kinds of NSIs during two years before the pilot study was average 11.7% (22/188). Pre-interventional baseline incidence of all kinds of NSIs was 7.01 per 100 HCW-years. After the full implementation of SED lancet, the lancet-related NSIs became zero in the 2nd year (P = 0.001). The average direct cost of 18,393 US dollars (USD) per year from device and post-exposure medical care before the intervention rose to 20,701 USD in the 2nd year of the intervention. The incremental cost-effectiveness ratio was 210 USD per injury avoided. Conclusion: The implementation of a SED lancet could eliminate the lancet-related NSIs to zero incidence. The cost increase incurred by the use of SED lancet was tolerable.

Process Development of Constant Curvature Extrusion for Aluminum Alloy (알루미늄 합금의 일정 곡률 압출공정 개발)

  • Joe, Y.J.;Lee, S.K.;Oh, K.H.;Park, S.W.;Kim, B.M.
    • Transactions of Materials Processing
    • /
    • v.16 no.7
    • /
    • pp.555-560
    • /
    • 2007
  • This paper shows some achievements at bending of extruded aluminum profiles during the extrusion process. The conventional process for the production of bent profiles involves a successive extrusion, stretching, and bending of the profiles. Conventional bending methods can not meet demands far precision and cost-effective production in some cases, due to cross sectional deformation, irregular decrease of tube wall thickness and a complication of the process design. An estimation of spring-back required for precision of the bending radius can not always be achieved by the over bending of the profile. Since the profile is hot during the bending process, the spring-back phenomenon can be avoided. This means that an additional bending process is not necessary. Consequently, flexible bending can be achieved with cost reduction and quality improvement. Experimental tests were completed to study the relationship between curvature radius of profile and position of guide on the extrusion for vehicle bumper. A7108 is applied as a billet material in order to increase strength. The overall correlation between the experimental and numerical results is good. It is therefore concluded that the present method provides an efficient means for the constant curvature extrusion process.

Model Predictive Torque Control of Surface Mounted Permanent Magnet Synchronous Motor Drives with Voltage Cost Functions

  • Zhang, Xiaoguang;Hou, Benshuai;He, Yikang;Gao, Dawei
    • Journal of Power Electronics
    • /
    • v.18 no.5
    • /
    • pp.1369-1379
    • /
    • 2018
  • In this paper, a model predictive torque control (MPTC) without the use of a weighting factor for surface mounted permanent-magnet synchronous machine (SPMSM) drive systems is presented. Firstly, the desired voltage vector is predicted in real time according to the principles of deadbeat torque and flux control. Then the sector of this desired voltage vector is determined. The complete enumeration for testing all of the feasible voltage vectors is avoided by testing only the candidate vectors contained in the sector. This means that only two voltage vectors in the sector need to be tested for selecting the optimal voltage vector in each control period. Thus, the calculation time can be reduced when compared with the conventional enumeration method. On the other hand, a novel cost function that only includes the dq-axis voltage errors between the desired voltage and candidate voltage is designed to eliminate the weighting factor used in the conventional MPTC. Thus, the control complexity caused by the tuning of the weighting factor is effectively decreased when compared with the conventional MPTC. Simulation and experimental investigation have been carried out to verify the proposed method.

ANALYZING CAUSES OF CHANGE ORDERS IN KOREA ROAD PROJECTS

  • Kang-Wook Lee;Wooyong Jung;Seung Heon Han;Byeong-Heon Yoon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1283-1287
    • /
    • 2009
  • The Korean government implemented 259 road projects from 2004 to 2007, valued at $18.4 billion. Change orders of these road projects occurred 8,973 times and, subsequently, caused significant increases in the cost of the projects, approximately up to $4.2 billion (22.8% of the initial budget). These significant problems of huge change orders require a more workable control system for budget management whereas the effectiveness of the government's control is still not satisfied. However, previous approaches and studies mostly limited their analyses to simply classifying the causes of the change orders. This paper investigates the real frequency and cost impacts incurred by each cause of a change order, primarily based on 218 road projects in Korea. The paper then identifies the attributes of change orders through a survey of 204 project participants in that those sources were inevitable or avoided if properly managed. The causes of the change orders are further analyzed with analysis of variance (ANOVA) in connection with contract volume, bid award rate, the contractor's capacity to perform, and the design company's capacity. This study found that if the contract volume is smaller, then the possibility of change orders is higher. Interestingly, if the bid award rate is less than 67.5%, it signifies the highest rate of change orders. In addition, the contractors whose construction ability is assessed as the top-ranked group showed the lowest change order rates. With these results, this paper provides the preventive guidelines for reducing the likelihood of change orders.

  • PDF