• Title/Summary/Keyword: automated terminal

Search Result 167, Processing Time 0.024 seconds

3-Dimensional Simulation Model for Automated Container Terminals (자동화 컨테이너터미널을 위한 3차원 시뮬레이션 모델)

  • Choi, Yong-Seok;Ha, Tae-Young
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2005.05a
    • /
    • pp.74-81
    • /
    • 2005
  • In this study, we introduce a 3D simulation model to support the design on ACT(Automated Container Terminal) using 3D animation. The developed simulation model simulate virtual operations of ACT and animate the simulated results with real time. We provide several validation points for the design of ACT. And the developed system applied an object-oriented design and C++ programming to increase the reusability and extensibility. We can perform the various simulation experiment and analyze performances to estimate the required number of equipment using developed simulation model.

  • PDF

A Study on the Tracking Control of a Transfer Crane with Tire Slip (슬립을 고려한 트랜스퍼 크레인의 주행제어에 관한 연구)

  • Jeong, Ji-Hyun;Lee, Dong-Seok;Kim, Young-Bok
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.16 no.12
    • /
    • pp.1212-1219
    • /
    • 2010
  • The most important thing in the container terminal is to handle the cargo effectively in the limited time. To achieve this object, many strategies have been introduced and applied to. If we consider the technical trends and environment of the automated container terminal, it is necessary that the systems for cargo handling are equipped with more intelligent control technologies. To cope with this tendency, from the middle of the 1990's, the automated RMGC (Rail-Mounted Gantry Crane) and RTGC (Rubber-Tired Gantry Crane) have been developed and widely used to handle containers in the yards. Recently, in these cranes, the many equipments like CCD cameras and sensors are mounted to cope with the automated terminal environment. If we want to obtain more efficient handling performance, the modelling, tracking control, anti-sway system design, skew motion suppressing and complicated motion control problems must be considered in the control system design and application process. Considering these problems, in this paper, the system modelling with the tire slip and a tracking control approach are proposed. Especially, we design the tracking control system based on the 2DOF servosystem design approach to cope with undesirable disturbance input. The experiment results show the desirable performance and usefulness of the designed control system.

A Study on the Perception Difference of the Subjects about Necessity of Automated Container Terminal (컨테이너터미널 자동화 필요성에 대한 관련 주체별 인식차이 연구)

  • You, Ji-Won;Kim, Yul-Seong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.11a
    • /
    • pp.216-217
    • /
    • 2019
  • As the shipping market deteriorates, shipping companies seek to realize economies of scale by promoting the enlargement of container ships. Container terminal operators are increasingly adopting automated equipment and systems in order to quickly provide services and attract traffic. As such, the competition for each terminal to become a hub port is intensifying. Increased automation of advanced container terminals improves productivity and efficiency In the meantime, Korea remains semi-automated. Therefore, the relevant subject survey through SPSS 23.0 program for analysis of recognition difference, We will check the awareness among stakeholders for the smooth introduction.

  • PDF

Anti-Sway System for Automated Transfer Crane (자동 트랜스퍼 크레인을 위한 컨테이너 흔들림 장치)

  • 박찬훈;박경택;김두형
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1743-1746
    • /
    • 2003
  • Automated Container Terminals have been being developed over the world for many recent years and more and more countries get interested in it because the amount of containers exported or imported is steeply increasing. Existed Container Terminals were not designed to control this kind of heavily many containers. They would face many structural problems soon or later, although they have managed to do well until now. One of the most important things in developing Automated Container Terminal is to develop the equipment able to transfer the awfully many containers. Those are maybe Automated Transfer Cranes, Automated Guided Vehicles, and Automated Quay-Side Cranes. The word "Automated" means the equipment is operated without drivers and those equipments are able to work without taking any break. Through the researches on the existed transfer cranes, authors decided that the structure of existed transfer cranes is not proper to swift and fast transfer and it′s not impossible to handle so many containers in limited time. Therefore authors have been studying on the proper structure of the Automated Container Crane for past several years and a new type of transfer crane has been developed. Design concepts and control methods of a new crane will be introduced in this paper.

  • PDF

Performance evaluation of double stack vehicle at container terminal (2단 적재차량의 컨테이너 이송능력 분석)

  • Ha Tae-Young;Choi Yong-Seok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.255-261
    • /
    • 2005
  • The purpose of this paper is to analyze transport ability of Automated Guided Vehicle(AGV) and Double Stack Vehicle(DSV) at Automated Container Terminal(ACT). Usually, the main difference of AGV and DSV is capacity of container that they can transport between apron and yard block at once. AGV can carry out two 20 feet or one 40 feet maritime containers, but DSV can carry out four 20 feet or two 40 feet maritime containers. Therefore, DSV may improve more efficiency of stevedoring system of container terminal. In this paper, a simulation model using a graphics simulation system is developed to compare the proposed DSV with the current AGV at automated container terminal. The paper includes examples, performance tests and a discussion of simulation results.

  • PDF

A Study on Simulation of Remarshalling Work in an Automated Container Terminal (자동화 컨테이너터미널의 이적작업에 관한 시뮬레이션 연구)

  • Lee Joo-Ho;Choi Yong-Seok
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.203-208
    • /
    • 2004
  • The objective of this study is to analyze the efficiency of marshalling work using ATC(automated transfer crane) for ACT(automated container terminal). It is important fact to assignment of containers, because the character of ACT which block layout is vertical for berth and there are four other works which are inbound, oubound, loading and unloading in one block. And then there is need which assignment of containers with remarshaling work using ATCs in one block. Therefore, we analyze the efficiency of remarshaling work using simulation and suggest the assignment methodology of containers in yard

  • PDF

A Development on the ATC Operation Strategy of the Automated Container Terminal (자동화터미널의 ATC 운영전략 개발)

  • Kim Woo-Sun;Nam Ki-Chan
    • Journal of Navigation and Port Research
    • /
    • v.30 no.3 s.109
    • /
    • pp.235-240
    • /
    • 2006
  • This study analyzed equipment operation strategy of ATC(Automated Transfer Crane) in order to development efficiency ATC operation logic for apply to domestic ACT(Automated Container Terminal). Improving productivity of ACT developed dynamic operation logic and established dispatching rule. As a result of simulation experiment reduced waiting time and interference time of ATC. Thus, we can improve productivity of ACT using dynamic operation logic and interference avoidance strategy.

Tracking Control System Design for the Transfer Crane : Design of Full-order Observer with Weighted $H_{\infty}$ Error Bound (트랜스퍼 크레인의 이송위치제어를 위한 서보계 설계 : 가중 $H_{\infty}$ 오차사양을 만족하는 동일차원 관측기 설계)

  • Kim, Y.B.;Jeong, H.H.;Yang, J.H.
    • Journal of Power System Engineering
    • /
    • v.12 no.6
    • /
    • pp.42-49
    • /
    • 2008
  • The most important job in the container terminal area is to handle the cargo effectively in the limited time. To achieve this object, many strategies have been introduced and applied to. If we consider the automated container terminal, it is necessary that the cargo handling equipments are equipped with more intelligent control systems. From the middle of the 1990's, an automated rail-mounted gantry crane(RMGC) and rubber-tired gantry crane(RTG) have been developed and widely used to handle containers in the yards. Recently, in these cranes, the many equipments like CCD cameras and sensors are mounted to cope with the automated terminal environment. In this paper, we try to support the development of more intelligent automated cranes which make the cargo handling be performed effectively in the yards. For this plant, the modelling, tracking control, anti-sway system design, skew motion suppressing and complicated motion control and suppressing problems must be considered. Especially, in this paper, the system modelling and tracking control approach are discussed. And, we design the tracking control system incorporating an observer based on the 2DOF servo system design approach to obtain the desired state informations. In the case of observer design, a weighted $H_{\infty}$ error bound approach for a state estimator is considered. Based on an algebraic Riccati equation(inequality) approach, a necessary and sufficient condition for the existence of a full-order estimator which satisfies the weighted $H_{\infty}$ error bound is introduced. Where, the condition for existence of the estimator is denoted by a Linear Matrix Inequality(LMI) which gives an optimized solution and observer gain. Based on this result, we apply it to the tracking control system design for the transfer crane.

  • PDF

Finding Subjects for Automated Container Terminal Development by Systems Approach (시스템적 접근에 의한 자동화컨테이너터미널 개발 과제 도출)

  • 박창호;노홍승;정의균
    • Journal of Korean Port Research
    • /
    • v.12 no.2
    • /
    • pp.243-250
    • /
    • 1998
  • This study is to find subjects for the Automated Container Terminal(ACT) development and container terminal system. Also we analyze the present condition of the container terminal system in Pusan port and its automation level by systems approach. And this paper aims at evaluating on the priority of R&D investment until the beginning of the second stage of New Pusan Port Project(2006). In this process we have considered 8 evaluation indexes(cost, labor, area, time, volume, reliability. safety, convenience) to analyze 6 subsystems. The priority of R&D until target year by sub-systems is as follow: 1. Cargo Handing System, 2. Transfer System, 3. Port Entry System, 4. Storage System (Distribution & Manufacturing System included), 5.Inland Transport System, 6.Port Management & Information System.

  • PDF

Control Architecture for Automated Container Cranes (무인자동화를 위한 컨테이너크레인의 제어구조)

  • 김형진;홍경태;홍금식
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.746-751
    • /
    • 2004
  • Demands for higher productivity in container terminal environments continues to escalate consideration of equipment upgrades. And then transportation of containers using the automated container crane becomes more and more important for productivity enhancements. Introducing a hybrid control architecture to the container crane, it provides a effective means to the automated operation of the container crane. This paper addresses the methodology for automation of container cranes. In addition, this paper proposes a new control architecture for the automated container crane and explains each component of that architecture. The control architecture is composed of a deliberative control layer, a sequencing layer, and a reactive control layer. The proposed architecture is applied to a dual-hoist double-trolley container crane.

  • PDF