• Title/Summary/Keyword: assessment criteria of project performance capability

Search Result 6, Processing Time 0.018 seconds

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety (안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

A Study on the Development of Criteria to Assess the Business Performance of the Development Fund for Women and the Organizations it Supports - focusing on the Assessment of the Seoul Metropolitan Government's Development Fund for Women - (여성발전기금의 평가도구 개발 및 지원단체의 사업수행능력 평가에 대한 연구 - 서울특별시 여성발전기금 지원사업 평가를 중심으로 -)

  • Lee, Bong-Wha;Kim, Kyoung-A
    • Journal of the Korean Home Economics Association
    • /
    • v.44 no.3 s.217
    • /
    • pp.127-141
    • /
    • 2006
  • This study aims to create assessment tools for the development fund for women, and to assess the business performance of the organizations using this development fund for women on the basis of such tools. A total of 57 projects by 58 organizations were assessed for a period of eight months. The assessment was carried out by using five tools: 1) examining the weight of the assessment tools, 2) visiting and inspecting project sites, 3) visiting and inspecting the offices of the participating organizations, 4) cooperating with the Seoul Metropolitan Government for municipal administration, and 5) assessing the final project report. Each tool was comprised of three elements: ability of relevant organizations, operational procedure, and projects results. The assessment results are summarized below: 1. According to the examination of the general trends in assessing the organizations that received the Development Fund for Women, it was found that the assessment emphasized performance more than the process involved in the project. Thus, the result suggested that the projects should be carried out more aggressively. 2. Regression analysis was conducted to identify the capability of the organizations in performing the projects with the development fund for women and the capability of the subjects as an independent variable. It was observed that such capabilities were affected by the degree of role sharing and the utilization of internal organizations. It suggested the importance of human resources. 3. To motivate the subjects involved in executing the projects with the use of the Development Fund for Women, the requirements and the satisfaction factors suggested strengthening the scope of financial support and activating the project environment. In conclusion, it is considered that the findings would provide practical ways to improve the system in using the Development Fund for Women, and in setting relevant policies in the future.

A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects - (철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 -)

  • Son, Seo-Yeon;Lee, Geun-Il;Jung, Ji-Hyun;Moon, Woo-Hyoung
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Construction Management) Considering Safety (안전을 고려한 건설사업관리용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Kim, Baek-Joong;Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.6
    • /
    • pp.557-566
    • /
    • 2019
  • The construction industry has the most safety accidents of any of the domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening their regulations on safety management. In particular, the OSHA (Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on the client's responsibility for safety management is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

A Study on the Evaluation Criteria of Safety Competency of Construction Manager (건설사업관리자 선정평가에 안전역량 평가항목 적용 연구)

  • Kim, Dosu;Joh, Hyunwoo;Kim, Gwanghee;Joo, Jinkyu;Shin, Yoonseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.46-54
    • /
    • 2020
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA (Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

A Study on the Verification of Significance of Assessment Items for Selecting Start-ups: Focusing on Project Fostering Start-ups through Leading Universities (창업기업 선정평가지표 유의성 검증에 관한 연구: 창업선도대학육성사업을 중심으로)

  • Jung, Kyung Hee;Sung, Chang So
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.13 no.4
    • /
    • pp.13-22
    • /
    • 2018
  • In this study, we examined the accuracy of the assessment items for selecting start-ups used in the project to support start-ups and verified their validity in determining whether they are appropriate assessment items based on selection criteria. The results of 973 start-ups that applied for the project fostering startup leading universities were collected and logistic regression was performed using SPSS 18.0. The study results are summarized as follows. First, the differences in characteristics of start-ups were identified in terms of selection. Second, the impact of selection by assessment items was gender in 2015, capability of the founder, business establishment in 2016, performance and potential in the global market, and business startup in 2017. Third, the overall selection accuracy analysis for the last three years confirmed that the accuracy of the selection is lower each year and that the accuracy of the selection is lower than the accuracy of the non-selection. This means that the current assessment items for selecting start-ups are inaccurate for selection, and that changes in the items due to changes in the start-up environment each year have led to lower accuracy of selection. It is meaningful that this study raised the importance of assessment items and the need for improvement of assessment items for the screening functions of good start-ups to enhance efficiency of the policies for startup support.