• 제목/요약/키워드: assessment criteria of project performance capability

검색결과 6건 처리시간 0.027초

안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구 (A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety)

  • 김도수;신윤석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

여성발전기금의 평가도구 개발 및 지원단체의 사업수행능력 평가에 대한 연구 - 서울특별시 여성발전기금 지원사업 평가를 중심으로 - (A Study on the Development of Criteria to Assess the Business Performance of the Development Fund for Women and the Organizations it Supports - focusing on the Assessment of the Seoul Metropolitan Government's Development Fund for Women -)

  • 이봉화;김경아
    • 대한가정학회지
    • /
    • 제44권3호
    • /
    • pp.127-141
    • /
    • 2006
  • This study aims to create assessment tools for the development fund for women, and to assess the business performance of the organizations using this development fund for women on the basis of such tools. A total of 57 projects by 58 organizations were assessed for a period of eight months. The assessment was carried out by using five tools: 1) examining the weight of the assessment tools, 2) visiting and inspecting project sites, 3) visiting and inspecting the offices of the participating organizations, 4) cooperating with the Seoul Metropolitan Government for municipal administration, and 5) assessing the final project report. Each tool was comprised of three elements: ability of relevant organizations, operational procedure, and projects results. The assessment results are summarized below: 1. According to the examination of the general trends in assessing the organizations that received the Development Fund for Women, it was found that the assessment emphasized performance more than the process involved in the project. Thus, the result suggested that the projects should be carried out more aggressively. 2. Regression analysis was conducted to identify the capability of the organizations in performing the projects with the development fund for women and the capability of the subjects as an independent variable. It was observed that such capabilities were affected by the degree of role sharing and the utilization of internal organizations. It suggested the importance of human resources. 3. To motivate the subjects involved in executing the projects with the use of the Development Fund for Women, the requirements and the satisfaction factors suggested strengthening the scope of financial support and activating the project environment. In conclusion, it is considered that the findings would provide practical ways to improve the system in using the Development Fund for Women, and in setting relevant policies in the future.

철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 - (A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects -)

  • 손서연;이근일;정지현;문우형
    • 한국BIM학회 논문집
    • /
    • 제11권4호
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.

안전을 고려한 건설사업관리용역업자(CM) 사업수행능력 평가기준 요인 도출 연구 (A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Construction Management) Considering Safety)

  • 김도수;김백중;신윤석
    • 한국건축시공학회지
    • /
    • 제19권6호
    • /
    • pp.557-566
    • /
    • 2019
  • 건설업은 국내 산업 중 안전사고가 가장 많이 발생한다. 건설업의 재해는 막대한 재산손실과 인명피해로 인한 사회적 문제로 이어지기 때문에 더 각별한 주의를 기울여야 한다. 최근 이로 인해 건설업에서 발생하는 재해에 대한 경각심이 높아지고 있으며 정부 각 부처에서는 안전관리에 관한 규정을 강화하고 있다. 특히 산업안전보건공단에서는 이번 산업안전보건법 전부개정안에서 보호대상의 확대와 책임 소재의 명확화에 중점을 두고 있다. 이에 따라 발주자 책임강화에 따른 건설사업관리자 선정 시 안전을 고려하는 요인 중심으로 분석한 연구가 필요한 실정이다. 따라서 본 연구에서는 먼저, 성장하고 있는 건설사업관리 시장에 비해 증가하고 있는 건설재해에 대한 저감 대책 중 하나인 산업안전보건법 전부개정법률을 참고하였고, 다양한 건설사업의 특성과 안전 요인을 고려하지 않은 획일화된 건설사업관리용역업자 사업수행능력 평가기준을 개선하기 위해, 발주자의 입장에서 건설사업관리자를 선정할 때 안전에 대한 항목을 참고할 수 있도록 관련 요인을 도출하고 중요도를 분석해 새로운 평가의 기준점을 제시하고자 한다. 이를 위해 법령, 국내 논문 및 문헌, 해외 사례 등을 바탕으로 기존 연구와 문헌을 고찰하고, 전문가 면담을 통해 항목을 선정하였다. 선정된 항목은 4가지 상위요인 그룹으로 분류하여 총 19가지의 하위요인으로 정리하여 공공기관 및 민간사업 잘주처 관계자 및 건설사업관리업 종사자, 안전관리자에게 쌍대비교설문을 실시하였다. 수집된 설문조사 결과 데이터를 바탕으로 계층 분석적 방법인 AHP기법을 활용하여 상대적 중요도를 비교하고 우선순위를 분석해 최종적으로 안전을 고려한 건설사업관리 사업수행능력 평가기준에 필요한 요인을 도출하였다. 본 연구의 결과가 발주자 입장에서 건설사업관리자를 선정함에 있어 안전관리 요인을 고려할 수 있도록 도움이 되고 건설 산업 전체의 재해 저감에 기여할 수 있는 기초적인 자료로 활용되기를 기대한다.

건설사업관리자 선정평가에 안전역량 평가항목 적용 연구 (A Study on the Evaluation Criteria of Safety Competency of Construction Manager)

  • 김도수;조현우;김광희;주진규;신윤석
    • 한국건설관리학회논문집
    • /
    • 제21권5호
    • /
    • pp.46-54
    • /
    • 2020
  • 건설업은 국내 산업 중 안전사고가 가장 많이 발생한다. 건설업의 재해는 막대한 재산손실과 인명피해로 인한 사회적 문제로 이어지기 때문에 더 각별한 주의를 기울여야 한다. 최근 이로 인해 건설업에서 발생하는 재해에 대한 경각심이 높아지고 있으며 정부 각 부처에서는 안전관리에 관한 규정을 강화하고 있다. 특히 산업안전보건공단에서는 이번 산업안전보건법 전부개정안에서 보호대상의 확대와 책임소재의 명확화에 중점을 두고 있다. 이에 따라 발주자 책임에 의한 안전관리를 중심으로 분석한 연구가 필요한 실정이다. 따라서 본 연구에서는 건설사업관리자의 사업수행능력평가를 산업안전보건법의 전부개정안을 고려하여 안전항목을 고려하여 건설사업관리자를 선정하는 방안을 제시하고자 한다.

창업기업 선정평가지표 유의성 검증에 관한 연구: 창업선도대학육성사업을 중심으로 (A Study on the Verification of Significance of Assessment Items for Selecting Start-ups: Focusing on Project Fostering Start-ups through Leading Universities)

  • 정경희;성창수
    • 벤처창업연구
    • /
    • 제13권4호
    • /
    • pp.13-22
    • /
    • 2018
  • 본 연구에서는 중앙정부의 창업지원사업에서 활용되고 있는 선정평가지표의 창업기업 선정여부에 대한 정확도를 검증하여 창업기업 선정평가지표의 유의성을 확인하였다. 이를 위해, 초기 창업기업을 집중 발굴 육성하는 창업선도대학육성사업에 지난 3년간 지원한 창업기업 973개의 평가점수와 선정여부 결과를 수집하여, 로지스틱회귀분석을 실시하였다. 연구결과를 요약하면 다음과 같다. 첫째, 선정여부에 있어 창업기업 특성변인에 따른 차이가 확인되었다. 둘째, 선정평가항목에 의한 선정여부의 영향은 2015년 성별(남), 창업자의 보유역량, 2016년 창업여부(기창업), 글로벌 진출 실적 및 잠재력, 2017년 창업여부(기창업) 항목만이 통계적으로 유의한 영향을 미쳤다. 셋째, 최근 3년간 전체 선정의 유의성 분석결과, 매년 정확도가 낮아짐을 확인하였으며, 비 선정보다 선정에 대한 정확도가 더욱 낮음을 확인하였다. 이는 창업지원사업 선정여부 판별에 있어 활용되고 있는 선정평가지표의 유의성 검증 및 부적합한 구성항목을 확인하고 매년 창업환경변화에 따른 지표의 변경은 선정의 정확도를 더욱 낮게 하는 요인임을 확인할 수 있었다. 본 연구는 창업지원정책의 효율성 제고를 위해 우수 창업기업 선별기능에 대한 선정평가지표의 중요성을 재인식하고 환기시키는 계기를 마련하였다는 점에 의의가 있다.