• 제목/요약/키워드: assembly system

검색결과 2,204건 처리시간 0.039초

수정 BOM 을 이용한 조립제품의 표준시간 산출 (Determining Standard Times of Assembly Products using A Modified BOM)

  • 엄광용;이문규
    • 산업공학
    • /
    • 제11권3호
    • /
    • pp.103-114
    • /
    • 1998
  • This paper suggests a computer software system which generates standard times for assembly products. The system called "computer aided logical system for standard times(CALS4ST)" incorporates a modified bill of materials, BOM4ST(BOM for standard time) to deal with auxiliary operations which are not directly related to parts and assemblies listed in the standard BOM. Typical examples of the operations include inspection, adjustment, and repairing works to be done before or after assembly operations. Once standard time data bases for both the part assembly operations and the auxiliary operations are set up, the system relates the BOM4ST to the standard time data bases so as to calculate the standard time for a assembly part concerned. According to the structure of parts and auxiliary operations in the BOM4ST, their standard times stored in the data bases are to be sequentially added up considering the specified assembly-operation characteristics. To illustrate the feasibility of the system, the case study of L company is provided.

  • PDF

차체 C/Pad 조립을 위한 증강현실 기반의 조립시스템 구현 (Implementation of AR based Assembly System for Car C/pad Assembly)

  • 박홍석;최흥원;박진우
    • 한국정밀공학회지
    • /
    • 제25권8호
    • /
    • pp.37-44
    • /
    • 2008
  • Nowadays, the increasing global competition forces manufacturer to reduce the cost and time for implementation of manufacturing system. The AR(augmented reality) technology as a new human-machine interface introduces a noteworthy perspective for a new manufacturing system design. Using AR technology, a physically existing production environment can be superimposed with virtual planning objects. Therefore, the planning tasks can be validated without modeling the surrounding environment of the production domain during short process planning time. In this paper, we introduce the construction of AR browser and determine the optimal environment parameters for field application of AR system through lots of tests. And, many methods such as multi-marker coordinate system, division of virtual objects and so on, are proposed in order to solve the problems suggested from initial field test. Based on these tests and results, the test-bed of C/Pad assembly system is configured and robot program for C/Pad assembly is generated based on AR system.

DEVELOPMENT OF DIGITAL LASER WELDING SYSTEM FOR AUTOMOBILE SIDE PANELS

  • Park, H.S.;Lee, G.B.
    • International Journal of Automotive Technology
    • /
    • 제8권1호
    • /
    • pp.83-91
    • /
    • 2007
  • Nowadays, the increasing global competition forces manufacturing enterprises to apply new technologies such as laser welding to manufacturing of their products. In case of automotive industries, they interest in assembly system for BIW (Body in White) carrying out laser welding. In this paper, the method of implementation for digital laser welding assembly system is proposed. Based on the requirements of assembly tasks obtained through product analysis, process modeling is executed by using the IDEF0 and UML model. For digital assembly system, the selected components are modeled by using 3D CAD tools. According to the system configuration strategy, lots of the alternative solutions for the assembly system of welding side panels are generated. Finally, the optimal laser welding system is chosen by the evaluation of the alternative solutions with TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) method.

가정배달 노인급식서비스 작업공정관리 모형개발을 위한 PERT-Type System의 적용 (Application of a PERT-Type System on Work Management in Home-Delivered Meals Service Program for Elderly)

  • 양일선;채인숙;유일근
    • Journal of Nutrition and Health
    • /
    • 제34권6호
    • /
    • pp.701-714
    • /
    • 2001
  • The purpose of this study was to apply a PERT-type system, a combination of the project evaluation and review technique(PERT) and critical path method(CPM) on the employees' work time management of flood preparation, assembly, transportation and cleaning in home-delivered meals program for elderly The resources allotment heuristic program was developed by considering the number of employees and cooking utilities, being limited resources of home- delivered meals program. This program could assign the employees to perform the works included in flood preparation, assembly, transportation ind cleaning. Critical path and activities ware identified by PERT-type system on the basic of work time investigation in five senior centers. Work sheets were invented to perform the work by the shortest path with flexible employees'maximum flow As a result of the work time investigation, the most prevalent activities were ones of preparation in center C and E. Besides, the preparation(over fifty percent) was the most proportion among flood preparation, assembly, transportation and cleaning in center C and E. Critical path and activities of 'C'center were cucumber in sauce preparation path and assembly, wrapping in assembly path and case delivery in transportation path. Critical path and activities of 'E'center were Pan-fried Potato Preparation Path and assembly, case covering, wrapping in assembly Path. The work sheet invented by the heuristic program and PERT-type system reduced the work completion time and man hours in both centers.

  • PDF

자동차 글라스 조립 자동화설비를 위한 프라이머 도포검사 비전시스템 개발 (Primer Coating Inspection System Development for Automotive Windshield Assembly Automation Facilities)

  • 김주영;양순호;김민규
    • 센서학회지
    • /
    • 제32권2호
    • /
    • pp.124-130
    • /
    • 2023
  • Implementing flexible production systems in domestic and foreign automotive design parts assembly has increased demand for automation and power reduction. Consequently, transition to a hybrid production method is observed where multiple vehicles are assembled in a single assembly line. Multiple robots, 3D vision sensors, mounting positions, and correction software have complex configurations in the automotive glass mounting system. Hence, automation is required owing to significant difficulty in the assembly process of automobile parts. This study presents a primer lighting and inspection algorithm that is robust to the assembly environment of real automotive design parts using high power 'ㄷ'-shaped LED inclined lighting. Furthermore, a 2D camera was developed in the primer coating inspection system-the core technology of the glass mounting system. A primer application demo line applicable to the actual automobile production line was established using the proposed high power lighting and algorithm. Furthermore, application inspection performance was verified using this demo system. Experimental results verified that the performance of the proposed system exceeded the level required to satisfy the automobile requirements.

조선 조립블록 운영관리에 관한 사례연구 (A Case Study on Assembly Block Operations Management at Shipyard)

  • 박창규;서준용
    • 경영과학
    • /
    • 제23권2호
    • /
    • pp.175-185
    • /
    • 2006
  • How to efficiently manage assembly blocks at shipyard has been a hot management issue in the shipbuilding Industry, because it has significantly influenced on the productivity of shipbuilding process. This paper introduces the real practice of assembly block operations management in Hyundai Heavy Industries (HHI) and the Ship Assembly Block Operations Optimization (SABOO) project that h3s been launched in HHI as an academy-and-industry collaborative project, aimed to diagnose problems, propose possible solutions, and develop a prototype system in order to search ways of improving the assembly block operations management. Through the field interviews, observations, and benchmarking studies, the SABOO project diagnosed the most rudimental and urgent problem and proposed possible solutions. In addition, the SABOO project developed the prototype system that embodied the visual function of monitoring the shipyard on a real-time and the Interactive block assignment function that utilized the assembly block assignment algorithm developed by the project. As a whole, the SABOO project tested the possibility and gained an insight in extending the functions of block transportation/stockyard management system.

유연성 있는 부품의 조립을 위한 부품변형 및 상대오차 측정장치 (A sensing system for measuring parts deformation and a misalignment in flexible parts assembly)

  • 김진영;조형석;김성권
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 한국자동제어학술회의논문집(국내학술편); 포항공과대학교, 포항; 24-26 Oct. 1996
    • /
    • pp.632-635
    • /
    • 1996
  • Flexible parts can be deformed by the contact forces during assembly on the con to rigid parts and thus their successful assembly requires informations about their deformation as well as a misalignment between mating parts. However, because of the nonlinear and complex relationship between parts deformation and assembly reaction forces, it is difficult to acquire all required informations from only the reaction forces during assembly. In this paper, we propose a sensing system consisting of a camera and multiple mirrors for flexible parts assembly. Simulation results show that the system can be effectively used for detecting parts deformation and a misalignment between mating parts.

  • PDF

부품 형상 및 조립공정에 따른 부품의 코드체계 (Coding system considering a part feature and assembly process)

  • 목학수;문광섭
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.28-31
    • /
    • 2000
  • In this paper, part features are classified and then coding system is constructed by the considering characteristics of features in assembly process. Analyzing the characteristics of features, code values about part features are determined. Assembly process is divided into five functions such as transporting, handling, approaching, alignment, joining and then the detail parameters of each function are determined. Code values about assembly process are determined according to detail parameters. The detail parameters are the kinds of available working method and assembly tools, when each assembly function is going on. By the coding system, available assembly process can be grasped and perceived the part that Is difficult to assemble.

  • PDF

조립순서의 자동생성에 관한 연구 (Automatic Generation of Assembly Sequences)

  • 손경준;정무영
    • 대한산업공학회지
    • /
    • 제19권1호
    • /
    • pp.1-17
    • /
    • 1993
  • It is well known that an assembly operation is usually constrained by the geometric interference between parts. These constraints are normally presented as AND/OR precedence relationships. To find a feasible assembly sequence which satisfies the geometric constraints is not an easy task because of the TSP(Traveling Salesman Problem) nature with precedence constraints. In this paper, we developed an automated system based on Neural Network for generating feasible assembly sequences. Modified Hopfield and Tank network is used to solve the problem of AND/OR precedence-constrained assembly sequences. An economic assembly sequence can be also obtained by applying the cost matrix that contains cost-reducing factors. To evaluate the performance and effectiveness of the developed system, a case of automobile generator is tested. The results show that the developed system can provide a "good" planning tool for an assembly planner within a reasonable computation time period.

  • PDF

동시공학에서의 조립을 위한 설계(DFA) 지원 시스템 개발 (Development of Support System of Design for Assembly (DFA) in Concurrent Engineering)

  • 목화수;조종래;문광섭;정융호;황용우
    • 한국정밀공학회지
    • /
    • 제20권6호
    • /
    • pp.151-159
    • /
    • 2003
  • This paper presents a new DFA methodology to estimate the standard assembly time and evaluate the assemblablity of a product. The assembly time is estimated with some decision and influencing factors of assembly using motion analysis. The assemblability is evaluated using weights of the decision and influencing factors and assembly difficulty scores, and the tables that include the time and score of assembly are suggested. Finally, a new DFA system supporting the DFA is implemented to help designers to analyze the product during the design process in concurrent engineering.