Browse > Article

DEVELOPMENT OF DIGITAL LASER WELDING SYSTEM FOR AUTOMOBILE SIDE PANELS  

Park, H.S. (School of Mechanical and Automotive Engineering, University of Ulsan)
Lee, G.B. (Korea Institute of Industrial Technology (KITECH))
Publication Information
International Journal of Automotive Technology / v.8, no.1, 2007 , pp. 83-91 More about this Journal
Abstract
Nowadays, the increasing global competition forces manufacturing enterprises to apply new technologies such as laser welding to manufacturing of their products. In case of automotive industries, they interest in assembly system for BIW (Body in White) carrying out laser welding. In this paper, the method of implementation for digital laser welding assembly system is proposed. Based on the requirements of assembly tasks obtained through product analysis, process modeling is executed by using the IDEF0 and UML model. For digital assembly system, the selected components are modeled by using 3D CAD tools. According to the system configuration strategy, lots of the alternative solutions for the assembly system of welding side panels are generated. Finally, the optimal laser welding system is chosen by the evaluation of the alternative solutions with TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) method.
Keywords
Digital manufacturing; Laser welding system; Structure planning; TOPSIS method;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
Times Cited By Web Of Science : 5  (Related Records In Web of Science)
Times Cited By SCOPUS : 4
연도 인용수 순위
1 Suh, J., Lee, J. H., Kang, H. S., Park, K. T., Kim, J. S., Lee, M. Y. and Jung, B. H. (2006). Optimal processing and system manufacturing of a laser welded tube for an automobile bumper beam. Int. J. Automotive Technology 7, 2, 209-216   과학기술학회마을
2 Martin, F. (2003). UML Distilled 3rd Edition. Booch Jacobson Rumbaugh. Addison-Wesley. Canada
3 Wu, S. H., Fuh, J. Y. H. and Nee, A. Y. C. (2002). Concurrent process planning and scheduling in distributed virtual manufacturing. IIE Trans. 34, 1, 77-89
4 Park, H. S. and Lee, H. B. (2006). Development of digital assembly cell for laser welding of side panels. Int. J. Automotive Technology 7, 6, 721-728   과학기술학회마을
5 Nomden, G., Slomp, J. and Suresh, N. C. (2005). Virtual manufacturing cell: A taxonomy of part research and identification of future research issues. Int. J. Flexible Manufacturing Systems 17, 2, 71-92   DOI
6 Mak, K. L. and Wang, X. X. (2002). Production scheduling and cell formation for virtual cellular manufacturing systems. Int. J. Advanced Manufacturing Technology 20, 2, 144-152   DOI   ScienceOn
7 Zhai, W., Yan, J., Ma, D., Jin, Y. and Fan, X. (2005). Production engineering-oriented virtual factory: a planning cell-based approach to manufacturing systems design. Int. J. Advanced Manufacturing Technology 28, 9, 957-965
8 Rosenberg, D. and Scott, K. (2001). Applying Use Case Driven Object Modeling with UML: An Annotated Ecommerce Example. Addison-Wesley. Canada
9 Sen, P. and Yang, J. B. (1998). Multiple Criteria Decision Support in Engineering Design. Springer-Verlag. London
10 Kim, S. C. and Choi, K. H. (2000). Development of flexible manufacturing system using virtual manufacturing praradigm. Int. J. Precision Engineering and Manufacturing 1, 1, 84-90