• Title/Summary/Keyword: assembly line tester

Search Result 2, Processing Time 0.022 seconds

Development of the Assembly Line Tester of Power Transmission for Lift Truck (지게차용 동력전달장치의 조립라인 전용시험기 개발)

  • Jang, Kyoung-Yeol;Yoo, Woo-Sik
    • IE interfaces
    • /
    • v.23 no.1
    • /
    • pp.58-67
    • /
    • 2010
  • The purpose of this paper is to present the development processes of the assembly line tester of power transmission for lift truck. Because power transmission is most important part of lift truck, all assembled powertrain parts must be inspected for operational defects, pressures and RPM. Developed assembly line tester is designed to take about 25 minutes for inspecting each assembled power transmission and located it at the end of assembled line. The assembly line no-load tester consists of three parts: (1) the driving hardware part; for installing and operating the transmission. (2) control PCB part; send data from sensors to a computer and control driving part, (3) operation software of no-load tester; for an automatic inspection or manual inspection, for database management and printing transcripts.

FPGA Design of Automatic Checking System for Wiring Harness (하네스 배선의 검사 자동화 시스템을 위한 FPGA 설계)

  • Ryoo, Hwangyu;Kim, Jinyoung;Ryoo, Kwangki
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2018.05a
    • /
    • pp.558-559
    • /
    • 2018
  • The harness wiring serves as an intermediary for transmitting the electrical signals necessary to drive the vehicle and is highly influenced by vehicle performance. Wire harness tester performs assembly test. Harness products are operated with the function of checking 0 and 1. Proceed to inspection in wire assembly process. There is a defect in the finished vehicle during use. We want to improve such defects. We design the FPGA and propose the measurement device design and the simulation result that the line and the line are disconnected by ADC precision harness inspection.

  • PDF