• Title/Summary/Keyword: architectural drawing

Search Result 201, Processing Time 0.023 seconds

An Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies (국내건설기업의 해외 프로젝트 입찰단계 우선집중역량 분석)

  • Kim, Ji Hyung;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.23-30
    • /
    • 2014
  • Overseas construction orders of domestic companies had been increased significantly in a short period from $10.9 billion in 2005 to $64.9 billion in 2012. However experts are concerned that quality of growth will not support quantitative growth. This study suggest concentrate competencies for not only winning in bid but also successful execution of domestic companies. 4 Steps which are Pre-Marketing, Bid-Preparation, Bidding, Contract Phase are defined for competency assessment. After drawing specific tasks by phase, survey asking importance and capability of the tasks to the person in charge of bidding and site was conducted by utilizing Likert 7 point scale. According to the result of IPA analysis, domestic construction companies need to ensure internal competencies; Project risk review, Bid team organization, and external competencies; Client needs grasp, Localization strategy, Cooperation establishment. Hearafter domestic construction companies will be able to utilize the result of the study for setting bidding strategy for winning in bid and improving earning rate.

Object Classification List for BIM-based Maintenance Information Modeling in Electrical and Telecommunications Field of Architecture (BIM 기반 유지관리정보 모델링을 위한 객체분류목록 개발 -건축 전기/정보통신 분야를 중심으로-)

  • Song, Jong-Kwan;Cho, Gen-Ha;Won, Ji-Sun;Ju, Ki-Beom;Bea, Si-Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.3183-3191
    • /
    • 2014
  • It is essential to effectively manage facilities because operating and maintenance cost for them accounts for more than 83% of lifecycle cost. This study developed BIM Object-based classification list to manage information required to operating and maintenance phase of them from design and construction phase. In order to develop this classification list, Construction Information Classification System, Design Criteria for Architectural Electrical Installations, commodity list classification of PPS(Public Procurement Service) were analyzed. and problems for consisting of object classification list were drawn. And each materials is classified that drawings discipline code (KSF 1540:2010 (Principle and criteria for CAD Drawing) was classified as level 1 to cover main areas and construction information classification system was classified as level 2 to cover elements also UNSPSC was classified as level 3 to cover objects for devices and equipments. this classification criteria was given code. This study is expected to be useful to exchange and share information in operating and maintenance phase by offering object point of view classification in design and construction phase. besides, it is looking forward to effective operating and maintenance of facilities by enabling management of devices and equipments by function, space, use.

Studies on the Characteristics of Spatial Components and Conversion of Sandan Area in the Rear Garden of Changdeokgung Palace (창덕궁 후원 산단(山壇) 권역 구성요소의 특질과 변용)

  • Jung, Woo-jin;Liu, Gi-suk;Sim, Woo-kyung
    • Korean Journal of Heritage: History & Science
    • /
    • v.46 no.4
    • /
    • pp.24-47
    • /
    • 2013
  • This study focused on the constructional concepts, landscape design techniques and changes made of the Sandan(山壇) area in the rear garden of Changdeokgung Palace based on the spatial organization of the zone. The results of this study are as below. Constructional layers that have been maintained throughout the centuries from King Injo(仁祖), King Sukjong(肅宗), King Sunjo(純祖), the Japanese colonial period to the present, were found in the Sandan area. The Sandan area, which was developed with the establishment of Chuiseungjeong(取勝亭) during the ruling of King Injo(仁祖), was created as a resting place for the King, and its usage continued until King Sukjong(肅宗) built Nakminjeong(樂民亭). However, the whole area was reorganized to host ritual ceremonies, where ancestral rites were performed for the mountain gods, after Sandan and Baekunsa(白雲社) were built during King Gojong's reign, before the drawing of 'Painting of Eastern Palaces(東闕圖).' The architectural component used then appears to have been designed to serve ancestral ritual formalities for the god of land, or to satisfy the religious desires of the royal family not fulfilled by Confucian courtesy. These are characteristics that define the Sandan area. Meanwhile, the analysis of the ground plan of the Changdeokgung Palace revealed that the Sandan had been maintained until the Japanese colonial era, but was removed sometime after liberation. The area underwent extensive reform in the early 1970s, when the whole area was developed into a tourist destination called Bingcheon(氷泉). Then, a new road that runs through Bingcheon was laid, and the present condition reflects the construction result of the time. An interview with a person who had taken part in the repair work in the 1970s confirmed that the construction work at the time had the goal of establishing two drainage systems for drinking water and copied the Okryuchon(玉流川) well.

Establishment of Integrated Design Bases Management System of APR1400 Using BIM based Algorithm (BIM기반 Algorithm을 활용한 APR1400 설계기준 통합관리 체계 구축)

  • Shin, Jaeseop;Choi, Jaepil
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.52-60
    • /
    • 2019
  • The APR1400 is a 1400MWe nuclear power plant developed through national technology development project over a period about 10years. Approximately 65,000 design drawings are produced for APR1400 construction. In order to maintain consistency among numerous drawings, the highest level of design bases drawings (DBDs) are created according to design bases and this is used in the subsequent design. However, DBDs are produced and managed on a document basis and they are managed various field, it was difficult to accurately reflect the design bases information in the subsequent design. Therefore, this study recognizes limitations of the document based DBDs and develops a system that can accurately reflect the design bases information to subsequent design by adopting BIM based design bases integrated information system. Especially, by introducing DBIL(Design Bases Information Layer) concept, DBIL was created and analyzed based on five design bases(Physical protection, Fire protection, Internal missile protection, Internal flood protection, Radiation protection) applied to APR1400. In the final result DBIL set and Datasheet are integrated of room, design bases information, building data(wall, slab, door, window, penetrations). So it can be used for subsequent design automation and design verification. Furthermore, it is expected that APR1400 DBILs data can be used extensively in constructability and design economics analysis through comparison with next generation nuclear power plant.

A Measure of Landscape Planning and Design Application through 3D Scan Analysis (3D 스캔 분석을 통한 전통조경 계획 및 설계 활용방안)

  • Shin, Hyun-Sil
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.36 no.4
    • /
    • pp.105-112
    • /
    • 2018
  • This study aims to apply 3D scanning technology to the field of landscape planning design. Through this, 3D scans were conducted on Soswaewon Garden and Seongrakwon Gardens to find directions for traditional landscape planning and designs. The results as follows. First, the actual measurement of the traditional garden through a 3D scan confirmed that a precise three-dimensional modeling of ${\pm}3-5mm$ error was constructed through the merging of coordinate values based on point data acquired at each observation point and postprocessing. Second, as a result of the 3D survey, the Soswaewon Garden obtained survey data on Jewoldang House, Gwangpunggak Pavilion, the surrounding wall, stone axis, and Aeyangdan wall, while the Seongnakwon Garden obtained survey data on the topography, rocks and waterways around the Yeongbyeokji pond area. The above data have the advantage of being able to monitor the changing appearance of the garden. Third, spatial information developed through 3D scans could be developed with a three-dimensional drawing preparation and inspection tool that included precise real-world data, and this process ensured the economic feasibility of time and manpower in the actual survey and investigation of landscaping space. In addition, modelling with a three-dimensional 1:1 scale is expected to be highly efficient in that reliable spatial data can be maintained and reprocessed to a specific size depending on the size of the design. In addition, from a long-term perspective, the deployment of 3D scan data is easy to predict and simulate changes in traditional landscaping space over time.

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

Estimation Method of the Amount of Demolition Waste through Automated Calculation of Volumetric Spaces using Drones (드론 활용 체적산출 자동화를 통한 해체 폐기물량 예측기법에 관한 연구)

  • Ryu, Jung-Rim;Kim, Hye-Ri;Park, Won-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.681-688
    • /
    • 2022
  • In this study, the process of drone photography, automatic volume calculation, total floor area conversion, and waste calculation was constructed as a QGIS plug-in to predict the demolition waste (DW) generated in an aged area where drawing information or building information is uncertain. Through a case study, the high consistency between the automatically calculated volume using the drone and the BIM volume based on the field measurement was confirmed. Field application was carried out for the planned demolition work site, and the consistency between the drone-based volume and the actual measurement-BIM-based volume was reconfirmed. The waste generation unit was applied and the amount of DW was calculated by setting the floor height and building type, and the entire process was completed within 6 hours. Although the difference between building information and building objects through drones occurred according to the setting of temporary structures, loads, and floor heights, it was found that the actual amount of DW was generated more than the initial estimate. It is expected that measures to improve the accuracy of volume and floor area conversion will be required through case studies in the future.

A Study on Landscaping Repair Work Classifications in Cultural Heritage Industry (문화재 수리의 조경분야 공종 분류에 관한 연구)

  • Kim, Min-Seon;Lee, Jae-Yong;Kim, Choong-Sik
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.59-66
    • /
    • 2022
  • The purpose of this study was to suggest the landscaping repair work classification, the standard for securing the independence of and establishing the scope of landscaping repair works. Standard construction specifications currently specify the landscaping repair work classification around the planting construction, while standard work estimate does not include the field of landscaping. The landscaping construction specifications and the standard work estimate in the construction industry should be, however, applied, so it is difficult to specifically understand what is the landscaping repair work classification in the cultural heritage industry. From 1961 to 1980, not only the tree planting but also a variety of landscaping facilities had been specified as the landscaping repair works, and it was found that all of these work classifications are established as the landscaping repair work classifications in the construction industry. A total of 20 work classifications were verified by comprehensively arranging those specified in notices of tender for working drawing services for cultural heritages during three years, from 2018 to 2020, except for those for the maintenance and Dancheong of architectures, plant protection and conservation. All 20 work classifications corresponded to the landscaping work classifications in the construction industry. On the basis of the landscaping work classifications in the construction industry, this study divided the landscaping repair work classifications into site-building and shaping, planting work, facility construction, paving work, ecological landscape architectural construction and vegetation maintenance, by considering the specialty of cultural heritage space.

Difference Factors Analysis of between Quantity Take-off Using BIM Model and Using 2D Drawings in Reinforced Concrete Building Frame (건물 골조수량 산출 시 BIM모델 기반 수량과 2D도면 기반 수량 차이 요인 분석)

  • Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.651-662
    • /
    • 2023
  • Recently, research on the use of Building Information Modeling(BIM) for various construction management activities is being actively conducted, and interest in 3D model-based estimation is increasing because it has the advantage of being able to be automatically performed using the attribute information of the 3D model. Therefore, this study aimed that the difference in the quantities is calculated the quantity based on the 2D drawing of a building and is extracted from the 3D model created by the Revit software was compared and tried to find out the cause. The difference in the quantity calculated by the two methods was the largest in the formwork, followed by the smallest in the order of the quantity of rebar and concrete. The reason for this difference is that there is a part where the quantity extraction in the 3D model is not suitable for the quantity calculation standard, and in particular, in the case of formwork, it was difficult to separate only the quantity of the necessary part. In addition, since the quantity of rebar was not separated by member, it was impossible to accurately compare the quantity and identify the cause of the difference. Therefore, it is considered to be the most reasonable to use application software that imports only the numerical information necessary for quantity calculation from the 3D model and applies a separate calculation formula.

A Study on Glass Mirror Trade and its Characteristics of Craft after Joseon Dynasty (조선 후기 유리거울의 수입과 공예품의 특징)

  • Park, Jinkyung
    • Korean Journal of Heritage: History & Science
    • /
    • v.52 no.4
    • /
    • pp.206-225
    • /
    • 2019
  • This paper examines the trade and development aspects of glass mirrors through the literature records of the Joseon Dynasty, and studies the characteristics of existing glass mirror crafts by referring to the terms and types shown in the literature. The glass mirror in the records had called western mirrors(西洋鏡, 洋鏡), glass mirrors(玻璃鏡, 玻瓈鏡), stone mirrors(石鏡), etc. Glass mirrors were imported mainly through trade with Russia and the Qing Dynasty since the 17th century and were banned from importation in the late Joseon Dynasty. These mirrors were something new that caused a great stirring in Joseon society in the 18th century, and in the 19th century, it grew larger as a commodity needed for everyday life, especially with trade with Japan. At that time, glass mirrors were used for various purposes, such as installing large glass at a store, which were not the standard mirror usage of confirming one's appearance. These mirrors surprised Koreans in Joseon who experienced them at Yanjing Liulichang(燕京 琉璃廠) in the 18th and 19th centuries. As a result, the demand for glass mirrors rapidly increased and quickly surpassed that of bronze mirrors. Consequentially, new crafts using glass mirrors instead of bronze mirrors in Joseon began to be produced and used after the 18th century. In particular, integrated flat boards of glass mirrors were developed as crafts used indoors. It was convenient to use the hair comb box, a long-time presence in Joseon society, with the bronze mirror. This kind of mirror remained apparent in various genre paintings, including the Taepyeong Seongsido(太平城市圖, 'A Thriving City in a Peaceful Era') collected the National Museum of Korea which reflect its populism of the times. Also, the Mirror Stand(鏡臺) used in the Qing Period was produced in Joseon, but there was a difference in the way of making the drawers and box shapes between two nations. On the other hand, the Face Mirror(面鏡) was made to look at the face. Various crafts made with the aesthetic sense of Joseon, such as the ox horn inlaying craft technique, were produced with auspicious designs. In the 19th century, glass mirrors were imported from European countries, such as France, Denmark, the Netherlands, and the United Kingdom, however after the end of the 19th century Japanese crafts were popular. Glass mirrors, which were popular in the Meiji and Taisho eras of Japan, were imported and also the Mirror Screen(鏡屛) using large glass mirrors were used. In particular, the mirror screen had developed wood furniture since the previous time, which were used for banquets and large spaces, such as the drawing room, and were imported from China and Japan. In addition, the western architectural effect of attaching a mirror to the wall was also attempted to adjust the brightness of the space and introduce another image and scenery in the mirror. This was done at Deoksugung Palace's Seokjojeon.