• Title/Summary/Keyword: architectural drawing

Search Result 201, Processing Time 0.031 seconds

The Implementation of an Roof Structure Generating Tool based on the Structural Analysis of Roof Curvature in Traditional Buildings (전통건축 지붕곡 구조분석을 통한 지붕가구부 설계도구의 구현)

  • Lee, Hyunmin;Ahn, Eunyoung
    • Journal of Korea Multimedia Society
    • /
    • v.17 no.3
    • /
    • pp.393-404
    • /
    • 2014
  • This research proposes a method to draw a number of components for roof frame in 3D datum. It is based on the analysis of the roof curvature and their geometric relationship in the traditional wooden buildings. Correlations between the components that generate a roof surface is defined with functional formula. The design system which automatically generates 3D datum for the components is implemented by reflecting the structural mechanics for them. The suggested system provides a control function to easily draw a traditional house. In this system, the components engaged in forming a roof surface are not only automatically generated but also simply modified according to the user's request. It would improves design efficiency and ensure a various roof surface design. Furthermore it makes possible systematic drawing and standardized industrial processing. Consequently, the proposed method is expected to contribute to the popularization of traditional house constructing.

The Analysis of View and Daylights for the Design of Public Housing Complexes Using a Residential Environment Analysis System Integrated into a CAD System (주거환경분석시스템의 CAD 시스템 통합을 통한 공동주택단지설계 시 일조 및 조망분석에 관한 연구)

  • Park, Soo-Hoon;Ryu, Jeong-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.12 no.2
    • /
    • pp.137-145
    • /
    • 2007
  • This paper concerns about residential environment analysis program implementation for design and analysis on public housing complexes such that view and daylight analysis processes are automated and integrated into existing design routine to achieve better design efficiency. Considering the architectural design trends this paper chooses ArchiCAD as a platform for a CAD system, which contains the concepts such as integrated object-oriented CAD, virtual building and BIM. Residential environment analysis system consists of three components. The first component is the 3D modeling part defining 3D form information for external geographic contour models, site models and interior/exterior of apartment buildings. The second is the parametric library part handling the design parameters for view and daylight analysis. The last is the user interface for the input/output and integration of data for the environment analysis. Daylight analysis shows rendered images as well as results of daylight reports and grades per time and performs the calculations for floor shadow. It separates the site-only analysis from the analysis of site and exterior environmental parameters. View analysis considers horizontal and vertical view angles to produce view image from each unit and uses the bitmap analysis method to determine opening ratio, scenery ratio and void ratio. We could expect better performance and precision from this residential environment analysis system than the existing 2D drawing based view and daylight analysis methods and overcome the existing one-way flow of design information from 3D form to analysis reports so that site design modifications are automatically reflected on analysis results. Each part is developed in a module so that further integration and extension into other related estimation and construction management systems are made possible.

A Study on the Plan Organization Status of High Schools Facilities - Through Analyzing of Recently Designed Plan Drawings - (고등학교(高等學校)의 평면구성(平面構成) 현황(現況)에 관한 연구(硏究) - 최근 설계(設計)된 학교(學校)들의 평면도(平面圖) 분석(分析)을 통하여 -)

  • Rieu, Ho-Seoup
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.9 no.1
    • /
    • pp.15-26
    • /
    • 2002
  • According to seventh curriculum, new types of school design have been developed recently. However there are hardly any data of national status about plan and area organization, types and number of rooms of those. On this background, the purpose of this study is to provide fundamental resources for architectural designing and planning of high schools and to recognize national status of plan organizations of high schools through collecting 53 school's standard design drawings(arrangement, plan drawing) which city, province education office drafted for 4 years(from 1997 to 2000) and analyzing them into plan types, building area and type, number and area of rooms. The results of this study are as follows: 1. The range of class number of designed 53 high schools varies from 24 to 36 and 36-class-schools are 47.2% of all. Average number of class is 34.1. As a result we can find out large scale schools are mainly designed. 2. Among 53 schools, 21 schools have the department system but few of them equipped sufficient rooms and their features are very manifold. After recognizing utilization status of each schools, the standards of room type, number and plan organization should be proposed. In terms of plan type for fluent level based transferring class, most of schools are not apt. 3. In the status of type and number of rooms related to class number, range is very wide. So simplification is necessary. 4. The variations of building area, area per a class and area per a student are very large so that standard of adequate area should be established. 5. That every school which has different plan organization from conventional schools exceeds ministry of education's minimum area standards shows those standards cannot cover the diverse plan design of school. So more adequate standards should be proposed. 6. Area and number of Teacher's research room and Home Base are also very manifold from school to school. They are also considered to be simplified immediately.

A Study on the Improvement of Architectural Acoustic Performance in the Large Gymnasium (대형(大形) 실내체육관(室內體育館)의 건축음향성능(建築音響性能) 개선(改選)에 관(關)한 연구(硏究))

  • Yun, Jae-Hyun;Kim, Jae-Soo
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.421-426
    • /
    • 2008
  • In case of the large-scaled indoor gymnasium that has been constructed in the local area, there are many instances for the use as multipurpose space where the public performances are possible such as leisure activity, lecture, assembling activity, drama, concert and so on for the resident together with the purpose of sporting facility. In order for utilization to the maximum of the function of such indoor gymnasium, the acoustic capabilities concerned with Definition of both Voice and Music are simultaneously required. However, in case of the large-scaled athletic facility, since it was designed with high ceiling-height in view of its characteristics, it forms a Sound Focus and then the sound is concentrating to the specific part, and because the vibration of sound is too loud due to its broad volume, the acoustic defects such as many Echoes are arising. On such viewpoint, based on the drawing of the indoor gymnasium that is scheduled to be built at B County, Chonbuk Province, this Study has proposed such indoor gymnasium equipped with the optimized acoustic condition passing through Acoustic Simulation Phase. As the result of Acoustic Simulation, we could design the indoor gymnasium that equipped with really satisfying acoustic performance 'after' reformation compared with 'before' reformation, and it is considering that such material could be utilized as the fundamental material that brings a curtailment effect of the construction cost and also enables us to improve the acoustic performance, at the stage of planning and designing for the similar sporting facility in the future.

  • PDF

Decision Making Support Tool for Master Architect in Design Development Phase of Mega-Project (메가프로젝트 기본설계단계의 Master Architect 의사결정지원 도구)

  • Cho, Dong-Hyun;Koo, Kyo-Jin;Park, Sung-Chul;Kim, Jong-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.202-206
    • /
    • 2008
  • Recently, as high level of interest for the city regeneration, large-scale projects are planned or being performed such as reconstruction project. These mesa-projects have different characteristics from a single project in the design phase. It is a number of companies involved in design phase of mega-project and principal decision-making entity manage the project from the initial stage of an ongoing business by coordinating an opinions between design companies. The absence of a decision making support system reflected those characteristic causes a variety of problems such as a loss of cost and schedule. Therefore the final object of this paper is to propose a decision making support tool and system interface.

  • PDF

The Development of the Movable-housing Planning Concept in Housing-architectural history of 20th Century (20 세기 주거건축사에 나타난 이동식 주거개념의 발전과정에 관한 연구)

  • Kim, Mi-Kyoung
    • Korean Institute of Interior Design Journal
    • /
    • v.17 no.2
    • /
    • pp.13-21
    • /
    • 2008
  • The purpose of this study is to analyze the development and characteristics of movable-housing planning concept. A document research method was used to analyze and classified the development of the movable-housing concept of 20th century. Through this study, the following conclusions have been reached; First, the origin of the movable-housing is from the prehistoric and traditional portable buildings, also due to the emergence of nomadic lifestyle using car traveling and mobile home in the 1920's. Second, the development of the movable-housing in 20th century was classified as follows; (1) In order to obtain the productivity and efficiency drawing from the industrialized-housing in the early of 1900s, movable furniture and flexibility was proposed. (2) American mobile home in 1920's, influenced by the development of car industry, was the most successful example of a factory-built building to be found in the world. (3) Dymaxion house and dome by R.B.Fuller, an aggregation of high-tech mechanical equipment, had a great impact on the development the concept of 'mobility' and influenced Archigram & Metabolist's movable capsule ideas in 1960's. (4) The lightweight materials such as plastic, duralumin and pneumatic structure were adopted for movable-housing in 1960's. Through this research, It is discovered that the stage of social development has close links with the developing aspects of movable-housing concepts. This study shows that the combination of three planning concepts such as flexible housing, mobile-housing and capsule will be more ideal in movable-housing planning rather than relying on just one type.

Importance Analysis of Major Factors in Formwork Collapse Accident (거푸집 붕괴사고 주요 요인별 중요도 분석)

  • Park, Ji-Yeong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.249-256
    • /
    • 2021
  • Fatal accidents in the construction industry account for a higher proportion than other industries, and in particular, the collapse accident of formwork is likely to lead to a serious accident like death. This study aim to derive the importance ranking of formwork collapse factors using AHP technique for preventing fatal accident. The AHP survey was conducted on field construction engineers, construction project managers, safety managers, and formwork specialist foreman with 10 years on site experience. The results of AHP analysis is that the most importance factor of formwork collapse accident is 'non-compliance with the formwork shoring assembly drawing'. Next it is important in the order of 'poor installation of formwork shoring and accessories', 'formwork shoring is not installed vertically', 'non-compliance with the concrete curing period of the formwork shoring', 'safety supervisor not designated and negligent'. It is necessary to preferentially and intensively manage the high importance factors presented as a result of this research for reducing formwork collapse accident. In addition, it will contribute to reducing construction safety accidents if the factors of the formwork collapse accident suggested in this research are included in the formwork inspection check list and checked step by step in formwork construction.

A Proposal for Partial Automation Preparation System of BIM-based Energy Conservation Plan - Case Study on Automation Process Using BIM Software and Excel VBA - (BIM기반 에너지절약계획서 건축부문 부분자동화 작성 시스템 제안 - BIM 소프트웨어와 EXCEL VBA를 이용한 자동화과정을 중심으로 -)

  • Ryu, Jea-Ho;Hwang, Jong-Min;Kim, Sol-Yee;Seo, Hwa-Yeong;Lee, Ji-Hyun
    • Journal of KIBIM
    • /
    • v.12 no.2
    • /
    • pp.49-59
    • /
    • 2022
  • The main idea of this study is to propose a BIM-based automation system drawing up a report of energy conservation plan in the architecture division. In order to obtain a building permit, an energy conservation plan must be prepared for buildings with a total floor area of 500m2 or more under the current law. Currently, it is adopted as a general method to complete a report by obtaining data and drawings necessary for an energy conservation plan through manual work and input them directly into the verification system. This method takes a lot of effort and time in the design phase which ultimately increases the initial cost of the business, including the services of companies specialized in the environmental field. However, in preparation for mandatory BIM work process in the future, it is necessary to introduce BIM-based automatic creation system that has an advantage for shortening the whole process to enable rapid permission of energy-saving designs for buildings. There may be many methods of automation, but this study introduces how to build an application using Dynamo of Revit, in terms of utilizing BIM, and write an energy conservation plan by automatic completion of report through Dynamo and Excel's VBA algorithm, which can save time and cost in preparing the report of energy conservation plan compared with the manual process. Also we have insisted that the digital transformation of architectural process is a necessary for an efficient use of our automation system in the current energy conservation plan workflow.

Development of Quantity Take-off Building Information Modeling System for Retaining Wall (객체 기반 물량 산출을 위한 흙막이 BIM 설계 시스템 구축)

  • Kang, SeoungWoo;Kim, Eun-Seok;Lee, Si-Eun;Kim, Chee-Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.4
    • /
    • pp.197-205
    • /
    • 2022
  • In this paper, a retaining wall system, developed using building Information modeling (BIM), is presented. Based on the information from a literature review, elementary technologies for the system were defined and developed. First, for the elementary technology, BIM libraries were constructed using standards and previous study results to achieve versatility and reusability. Second, methods for determining the quantity take-off (QTO) of a retaining wall were reviewed for an earth-work calculating system. Additionally, inverse distance weighting interpolation was used to generate topography. Finally, four formulas for calculating the QTO were proposed and devised for each element. After its development, the BIM system was analyzed and verified through comparison with a two-dimensional drawing-based QTO. The proposed system is deemed to be practical for determining the QTO of retaining walls and earth works. The contributions and limitations of the research are discussed in this paper.

A Study on the Spatial Typology and Size of Health Examination Center Depending on the Operating System (건강검진센터 운영방식에 따른 공간 유형과 규모에 관한 연구)

  • Son, Jihye;Cho, Junyoung;Kim, Uihyeon;Kim, Hyeonjeong;Yang, Naewon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.28 no.3
    • /
    • pp.17-26
    • /
    • 2022
  • Purpose: The purpose of this study is to classify space types according to the operating system of health examination centers and compare and analyze their sizes. Methods: Seven examination centers under the K Medical Research Institute with the same operating system and similar examination types and functional spaces are the subject of the investigation. Research is conducted through field investigation, user surveys, and drawing analysis. Results: The operating method of the health examination center can be largely divided into the function dispersed type and the function central type. The function dispersed type was planned as a vertical type, and the function central type was planned as a horizontal type. In the case of the function dispersed type, since the examinees move vertically to use the endoscope center and special examination center, the efficiency of the vertical movement must be considered when planning the function dispersed type of facility. The function dispersed type plans to increase work and manpower efficiency by arranging the areas used at the start and end of the examination. Because the function central type horizontally arranges related functions by area, it should be planned in a structure that makes it easy for examinees to find their way. Implications: Through this study, it is judged that it is possible to suggest architectural planning considerations that vary depending on the operation system of the examination center.