• 제목/요약/키워드: architectural construction cost

검색결과 590건 처리시간 0.021초

Relationship of Ceramic Insulation Panel System Development and Verification of LCC

  • Han, Min-Cheol;Jeon, Kyu-Nam;Lee, Gun-Cheol;Kim, Tae-Hui
    • 한국건축시공학회지
    • /
    • 제12권4호
    • /
    • pp.386-392
    • /
    • 2012
  • In this study, life cycle cost (LCC) is analyzed according to insulation panel system type using a deterministic LCC analysis method. Through this analysis, it was found that the construction cost in the deterministic LCC analysis for Ceramic panels was low compared to the construction cost for metal and stone panels. Also, the difference in cost between the Ceramic panel and the metal panel was about 2 times. In the area of maintenance cost, it was found to be similar to the previously analyzed construction cost, in which the metal panel has the highest cost due to the high cost of construction and the frequent need for maintenance. In the case of the stone panel, a small difference in cost is shown compared with that of the Ceramic panel, but the cost is higher than the Ceramic panel. Regarding the cost of waste disposal, the Ceramic panel can reduce the cost by at least 1.5 times and up to 2 times compared to other panel systems. Finally, in the analysis of sensitivity according to changes in discount rates, the Ceramic panel and metal panel systems have a similar cost, and the cost of the metal panel is a bit larger than that of other panel systems. Thus, in the subjects used in the analysis, the Ceramic panel system shows the highest economic benefits.

활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안 (Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage)

  • 이정훈;박문서;이현수;이광표;현호상
    • 한국건설관리학회논문집
    • /
    • 제16권4호
    • /
    • pp.139-145
    • /
    • 2015
  • 최근 건설 기업들은 노동력 부족, 원자재값 상승, 건설경기 위축 등으로 인해 새로운 건설시장 개척 및 자동화 기술도입을 적극적으로 추진하고 있다. 이러한 노력의 일환으로 최근 제조업의 생산프로세스와 건설생산프로세스가 결합된 모듈러 건축공법이 부각되고 있으며 이와 관련된 연구가 활발히 진행되고 있다. 모듈러 건축프로세스에서 공장제작의 가장 큰 장점 중 하나는 기존 건축프로세스에서 사용하기 어려웠던 제조업의 생산설비시스템을 활용한 생산원가(공사원감)절감이 가능하다는 것 있다. 이를 뒷받침하기 위해서는 대다수의 건축공종이 집중되어있는 공장제작단계에서의 원가산정이 정확해야 하며 특히 직접적인 계산이 어려운 간접비에 대한 구체적인 산정방인 필요하다. 그러나 국내 모듈러 건축산업이 시장도입단계로 이와 관련된 연구가 한정적으로 이루어지고 있어 모듈러 건축물의 원가왜곡현상이 나타날 수 있는 문제가 있다. 따라서 본 연구는 모듈러 건축물의 공장제작단계에서 국내계약법상에서 명시된 제조업과 건설업에서의 간접비 정의를 고찰하고 활동기준원가계산법을 통해 모듈러 건축물을 구성하는 모듈러 유닛별 간접비 산정방식을 제시하였다. 본 연구는 공장제작단계에서의 전 과정 뿐만 아니라 모듈러 건축물의 설계, 제작, 운송, 시공의 간접비 배분에 대한 기초자료로서 활용될 수 있으며 향후 모듈러 건축물의 공장제작단계에서의 원가산정 정확도 향상 및 모듈러 건축물의 전 생애주기에 따른 원가산정방안 마련에 기여할 것으로 기대된다.

Basic Train of Thoughts for the Construction of Low Cost Scenery Spots

  • Duanmu, Shan
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • 제1호
    • /
    • pp.213-218
    • /
    • 2001
  • To many developing countries like China, the practical way to constant development of city construction is low consuming. The basic methods of low-cunsuming landscape construction: 1) Low building consumption: Decreasing construction quantity. Using low-costing material. Designing low-consuming landscape. Reusing of building material. 2) Low energy consumption: Decreasing water consumption. Consuming and enrichment of earth fertilizer. Decreasing electrical consumption. 3) Low maintenance: Adapting natural material. Using local plants. Special design to decrease maintaining. Because of many reasons, China has not yet adapting Low-consuming Landscape Construction.

  • PDF

경운궁(慶運宮) 중건(重建) 목공사(木工事)의 예산(豫算)과 실입(實入)에 관한 연구 (A Study on the Estimated, Executed Cost of Woodwork in the Construction of the Kyongwoon Palace)

  • 이권영;서치상;김순일
    • 건축역사연구
    • /
    • 제7권3호
    • /
    • pp.27-51
    • /
    • 1998
  • One of the characteristics of a good construction is efficiently to use material and manpower related in the construction. From the preplanning stage to the completion one, a program planner must sufficiently consider the whole field of construction in terms of cost. The estimating account books were written and left in the Construction of the Kyongwoon Palace reconstructed in the beginning of 20th century. Trough those books and other related documents, this paper has been concentrated on the estimated, executed cost of woodwork in those days.

  • PDF

Establishment of Change Order Database for Reducing Change Order in Construction Phase

  • Shin, Hyun-Kyung;Cha, Yongwon;Han, Sangwon;Hyun, Chang-Taek
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.622-624
    • /
    • 2015
  • As uncertain factors are latent in a construction project by nature, a change order occurs frequently. The occurrence of change orders in construction projects conducted during construction phase is known to cause unexpected negative impacts such as cost overrun, schedule delay, quality problem, and claims in the post-process. Thus, an efficient management method is necessary to prevent and minimize change orders during construction phase when they occur frequently. This paper analyzed the causes of change orders and the impact factors that occur during the construction phase of a construction project and suggested a direction for change order database building.

  • PDF

초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 - (Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok)

  • 강승희;정영수
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.48-56
    • /
    • 2020
  • 기획단계에서의 공사비 예측은 타당성 분석, 예산 책정, 계획수립 등을 위한 기초정보를 제공한다는 점에서 성공적인 프로젝트 수행을 위한 중요한 요소이다. 본 연구에서는 초기 기획단계의 신한옥 공사비 예측 정확도 향상을 목적으로 전체 공사비 중 가장 많은 비중을 차지하는 목공사는 다양한 조건(구조형식, 지붕형태, 평면형태 등)에 의해 개략 물량을 자동 산출하여 공사비를 예측하고, 이외의 공종은 단위단가식을 적용해 공사비를 예측하는 모델을 제시하였다. 2개의 사례를 대상으로 개략 견적 모델로써의 활용성 및 타당성을 검증하였으며, 총공사비의 오차율은 각각 -4%(사례 1), -6%(사례2)로 나타났다. 이러한 결과값은 초기 기획단계에서 실무활용 가능한 범위에서의 오차를 보였다.

국내 중규모 업무용 건물의 녹색건축인증 등급별 추가공사 비용 영향에 관한 연구 - G-SEED 2016-2 기준으로(2018년 9월 1일 시행) - (A Study on the Cost Impact of Additional Construction as Rating G-SEED Certification of Medium-Sized Office Buildings in Korea - Based on G-SEED 2016-2(Effective September 1, 2018) -)

  • 이두환;김재문
    • 대한건축학회논문집:구조계
    • /
    • 제35권10호
    • /
    • pp.225-234
    • /
    • 2019
  • The purpose of this paper is to analyze the additional construction cost of G-SEED certification for domestic office building reflecting the latest standard(G-SEED 2016-2), and to derive cost impact by category and level. Therefore, it is intended to provide quantitave cost data according to G-SEED certification at the planning phase of the project, estimate the additional construction cost per level according to G-SEED Certification of similar project to be carried out in the future, and encourage G-SEED certification by supporting the decision of the owners. Method: The Process and method of this study are summarized in five steps, 1) Review of previous research, 2) Selection of target project, 3) Scenario setting by level, 4) Additional construction cost for each evaluation category, 5) Extraction of additional construction cost ratio by level. Result: This paper analyzed the cost impact by deriving the additional construction cost of detailed category for level improvement according to the revised G-SEED certification(G-SEED 2016-2). In conclusion, an additional construction cost(ratio) of G-SEED projects to the reference building is drawn as good level; 157,426,241 KWN(+0.43%), very good level; 321,907,802 KWN(+0.88%), excellent level; 999,371,478 KWN(+2.74%), and outstanding level; 1,467,047,718 KWN(+4.02%).

실비정산 비용지불 방식에 적용 가능한 건설 프로젝트 정보관리 시스템 (Information System for Managing Cost Reimbursable Construction Projects)

  • 강남희;송호정;김현중;최재현
    • 한국건축시공학회지
    • /
    • 제15권2호
    • /
    • pp.237-247
    • /
    • 2015
  • 최근 국내 건설 프로젝트 수행과정에서 발생하는 정보관리 기술의 고도화를 위해 IT기술을 활용한 건설 사업관리 정보시스템(Project Management Information System, PMIS)이 개발되어 활용되고 있다. 국내에서 개발된 PMIS는 국내 건설 프로젝트뿐만 아니라 국내 건설기업이 수행하는 일부 해외 프로젝트에도 제한적으로 적용되고 있다. 본 연구는 국내 기술로 개발된 PMIS를 미국건설IT 시장에 특화된 시스템으로 개발하는 것을 목적으로 수행되었다. 미국 건설 IT시장은 주로 미국 기반의 IT기업에 의해 개발된 제품들이 독과점으로 선점하고 있었으나, 최근 차별화된 기술 경쟁력 및 시장전략을 통해 시장을 확보해 나가는 기업이 증가하고 있다. 시스템 개발을 위한 선행연구로 국내와 해외에서 상용화된 시스템을 분석하였고, 미국 건설 프로젝트 수행 시 계약, 공정, 원가관리의 핵심요소를 분석하여 PMIS의 요구기능을 정립하였다. 이를 바탕으로 개발된 PMIS는 내부 전자결제 시스템을 포함한 문서관리 모듈과 실비정산 기반의 노무비 자동 산정 모듈, 진도관리 모듈을 통해 통합 사업비관리를 지원한다. 또한 개발된 시스템을 현지 건설 사업관리 전문가를 대상으로 설문조사를 실시하여 타당성을 검증하였다. 본 연구를 통해 개발된 PMIS는 미국 건설 산업에 특화된 시스템으로써 미국 건설 IT 시장 뿐 아니라, 해외 타수요처 적용 측면에서 점진적 확대를 기대한다.

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • 제14권3호
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.