• Title/Summary/Keyword: arc fault

Search Result 229, Processing Time 0.027 seconds

A Study on the Detection of LIF and HIF Using Neural Network (신경회로망을 이용한 LIF 및 HIF검출에 판한 연구)

  • Choi, H.S.;Park, S.W.;Chae, J.B.;Kim, C.H.
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.924-926
    • /
    • 1997
  • A high impedance fault(HIF) in a power system could be due to a downed conductor, and is a dangerous situation because the current may be too small to be detected by conventional means. In this paper, HIF(High impedance fault) and LIF(Low impedance fault) detection methods were reviewed. No single defection method can detect all electrical conditions resulting from downed conductor faults, because high impedance fault have arc phenomena, asymmetry and randomness. Neural network are well-suited for solving difficult signal processing and pattern recognition problem. This paper presents the application of artificial neural network(ANN) to detect the HIF and LIF. Test results show that the neural network was able to identify the high impedance fault by real-time operation. Furthermore, neural network was able to discriminate the HIF from the LIF.

  • PDF

A Study on Energy Characteristics in Transient States of OF Cable Systems (OF 케이블 계통에서 과도상태시 에너지 특성 검토)

  • Jung, Chae-Kyun;Lee, Jong-Beom;Kang, Ji-Won;Lee, Dong-Il;Seo, Je-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.11
    • /
    • pp.468-475
    • /
    • 2006
  • This paper reviews the energy characteristics of oil filled cables in transient state such as grounding fault and lightning surge. Artificial grounding fault test was firstly performed in 2003 for the analysis of arc voltage and breakdown energy according to the fault current. In this paper, energy of OF cable is variously analysed at joint box based on the actual test. Then more various conditions such as installation types, section lengths and CCPU(Cable Covering Protection Unit) connection types are applied for the simulation using EMTP when the single line to ground fault and direct lightning stroke are occurred on actual underground power cable systems and combined power cable systems, respectively. Finally, the energy by the length of crossbonded lead and grounding lead as well as fault lasting time is also calculated using EMTP simulation.

The Arcing Faults Simulation and Adaptive Autoreclosure Strategy for 765 kV Transmission Line Protection (765 kV 송전선로 보호를 위한 아크사고 시뮬레이션 및 적응적 자동재폐로 대책)

  • Ahn, Sang-Pil;Kim, Chull-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.11
    • /
    • pp.1365-1373
    • /
    • 1999
  • In many countries including Korea, in order to transmit the more electric power, the higher transmission line voltage is inevitable. So, a rapid reclosing scheme is important for EHV/UHV transmission lines to ensure requirements for high reliability of main lines. A critical aspect of reclosing operation is the extinction of the secondary arc since it must extinguish before successful reclosure can occur. Therefore the accurate simulation techniques of arcing faults are of importance. And successful reclosing switching can be accomplished by adopting a proper method such as HSGS and hybrid scheme to reduce the secondary arc extinction time. First of all, this paper discusses a suggested arc model, which have time dependent resistance for primary arc and piecewise linear approximated arc model for secondary arc. And this simulation technique is applied to Korean 765 kV transmission lines. Also hybrid scheme is simulated and evaluated for the purpose of shortening dead time. For adaptive reclosing scheme, variable dead time control algorithm is suggested. Two kinds of algorithm are tested. One is max tracking algorithm and the other is rms tracking algorithm. According to simulation results, rms tracking has less errors than max tracking. Therefore rms tracking is applied to Korean 765 kV transmission lines with hybrid scheme.

  • PDF

The Characteristics of Arc Scattering and Fusing Current of Copper Wire in the Fault Process DB System of Cables in a PL Environment

  • Kim, Young-Seok;Shong, Kil-Mok;Kim, Sun-Gu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.3
    • /
    • pp.52-58
    • /
    • 2008
  • The importance of. identifying the causes of electrical faults cannot be overstated because of the accidents caused by over-current that take place at the home, the office and electrical facilities due to misuse, poor products and system faults. It is necessary to gather objective, scientific data pertaining to electrical fault investigation in a product liability(PL) environment. To date, no database(DB) has been built concerning the accurate cause analysis of faultyfacilities. In this paper, accident hazard and arc scattering when over-current flows in copper wire was investigated. It was found that when over-current flows in a copper wire, the copper wire became heated and bent and beads were scattered around the wire with a flash. It was determinedthat the fusing current and time was related to the current rise per second. For example, when the current rise per second was largethe fusing current was higher than when the current rise per second was small, and the beads dispersed along a wide area. Fusing time, however, was shorter. The possibility of electrical fault became highest when the fusing current was higher. As the current rise per second is short, the dendrite structure is distributed in the surface of the copper wire. These experimental results can be utilized for a fault process DB system in the investigation and the prevention of electrical faults.

Developing a fault diagnosis algorithm on a high current cable of arc furnace (전기로 High Current Cable 고장진단 알고리즘 개발)

  • Choi, Seong-Jin;Jang, Yu-Jin;Kim, Sang Woo
    • Proceedings of the KIEE Conference
    • /
    • 2005.10b
    • /
    • pp.573-575
    • /
    • 2005
  • In the steel industry, a steel melting electric arc furnace is used to produce both carbon and alloy steels. Steel scrap which is charged into the furnace is heated by means of electric arc between graphite electrodes and the scrap. In this melting process, current is supplied to the furnace through HCC(high current cable) which connect the furnace and transformer. Four HCCs are assigned to each phase in our system to divide the current. Since a sudden cable breaking result in the shutdown of melting process, an aging detection of HCC is very important for both an improvement of productivity and cost reduction. In this paper, the aging of the HCC is estimated by using the current ratio between four HCCs.

  • PDF

A Study on the Reduction Effects for Surge Voltage of Lightning protective Equipments and the Arc Fusion Mechanisms in the Distribution lines (가공배전선로의 뇌단선 현상과 내뢰설비의 뇌써어지 전압 저감효과에 관한 연구)

  • Kung, D.Nam;Kim, S.J.;Lee, B.S.;Jung, D.H.;Lee, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 1997.11a
    • /
    • pp.167-170
    • /
    • 1997
  • The arc fusion faults in the distribution lines are occurred by lightning surge, stress corrosion and substance touching. Arc fusion fault by lightning surge is one of the most frequent occurrence. In this report, we studied the mechanisms of the Arc fusion faults. Also, we analyzed the reduction effects for surge voltage of lightning protective equipments.

  • PDF

The Flow Analysis of Arc in LG Hybrid Interrupter Using PHOENICS Code (PHOENICS Code를 이용한 자력팽창 소호부 내 아크유동해석)

  • Lee, J.C.;Lee, B.W.;Oh, I.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.04a
    • /
    • pp.44-46
    • /
    • 2001
  • This paper describes the use of the PHOENICS CFD package for the simulation of the high-current period of the arcing process in a hybrid rotating arc/auto expansion by interrupter. The operating principle of this device depends on rapid arc rotation due to the magnetic field created by the fault current through a coil which is mounted on contacts and also relies on the principle of thermal expansion created by arc energy in extinguishing chamber and finally causes pressure rise in expansion volume. This paper is divided into three main sections. The first gives a brief overview of the interrupter. The second section gives a full description of the methods used in the calculation. The final section presents some sample results for the hybrid interrupter.

  • PDF

Development of a Fault Diagnosis Algorithm on a High Current Cable of Arc Furnace (전기로 대전류 케이블 고장진단 알고리즘 개발)

  • Kim, Sang-Woo;Jang, Yu-Jin
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.55 no.3
    • /
    • pp.115-118
    • /
    • 2006
  • In the steel industry, a steel melting electric arc furnace is used to produce both carbon and alloy steels. Steel scrap which is charged into the furnace is heated by means of electric arc between graphite electrodes and the scrap. In this melting process, current is supplied to the furnace through HCC(high current cable) which connect the furnace and transformer. Four HCCs are assigned to each phase in our system to divide the current. Since a sudden cable breaking result in the shutdown of melting process, an aging detection of HCC is very important for both an improvement of productivity and cost reduction. In this paper, the aging of the HCC is estimated by using the current ratio between four HCCs.

K-Ar Age of the Keumseongsan Volcanic Rocks and Mineralization in the Southeastern Part of Euiseong, Gyeongsangbuk-Do, Republic of Korea (경북·의성 동남부에 분포하는 금성산 화산암류의 K-Ar연대와 그주변의 광화시기)

  • Lee, Hyun Koo;Kim, Sang Jung;Yun, Hyesu;Choi, Wyi Chan;Song, Young Su;Itaya, Tetsumaru
    • Economic and Environmental Geology
    • /
    • v.26 no.4
    • /
    • pp.445-454
    • /
    • 1993
  • The Keumseongsan caldera is composed of the Cretaceous sedimentary rocks of the Gyeonesang Supergroup, volcanic rocks of the Yucheon Group and basic dykes. The Keumseongsan caldera is formed by subsidence of volcanic rocks, and arc fault developed late. Also, synistral strike-slip fault ($N60^{\circ}W$) developed. Volcanic rocks belong to subalkaline rocks and calcalkaline magma series. First tuffaceous breccia erupted before 71.4 Ma and cavity of magma chamber caused subsidence, which formed arc fault. Basaltic lava erupted at 71.4 Ma and residual fluids containing Fe, As, Pb, Zn and Cu metal elements built the Ohto deposits, which are dated to be 70.5 Ma based on K-Ar age for sericite. Tuffaceous breccia and tuff erupted between 70.5 and 67 Ma. When volcanic eruption became weakened, cavity in site of magma chamber brought subsidence. Rhyolite intruded and erupted at 67 Ma, and intrusive rhyolite intruded according to arc faults, also. Hydrothermal fluids containing Fe, As, Pb, Zn, Cu, Sb, Bi, Au and Ag formed the Tohyeon deposits. K-Ar age for sericite from the Tohyeon mine gives 66.0 Ma. Results of field exploration, geochemical analyses of volcanic rocks support mineralization possibility by volcanism. Especially, age of volcanism and mineralization are well in coincidence with results of K-Ar age dating. By these results, Ohto Cu mineralization is regarded to be associcated with basaltic rocks, while Tohyeon Cu mineralization with rhyolitic rocks.

  • PDF