• Title/Summary/Keyword: application onsite

Search Result 20, Processing Time 0.024 seconds

Advanced and Application of Onsite EEW Technology in Korea (국내에서의 지진현장경보 기술 고도화 및 적용)

  • Lee, Ho Jun;Jeon, Inchan;Seo, Jeong Beom;Lee, Jin Koo
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.4
    • /
    • pp.670-681
    • /
    • 2020
  • Purpose: This study aims to derive a PGV prediction equation and to enhance the application of the Onsite EEW technology which has developed through previous studies. Method: The prediction equation for the Onsite EEW derived from earthquake data M≥3.0 and MMI≥II over the past four years. Local seismic risk is estimated using M and PGV deduced from P wave properties. Result: The improved PGV prediction equation estimated the MMI with an average accuracy of 94.8% and the 𝜏c : Pd method also showed valid performance for alerting local seismic risks. Conclusion: Onsite EEW technology is successfully applied to Korea, and becomes to reduce the blind zone to about 14km.

Application of the Onsite EEW Technology Using the P-Wave of Seismic Records in Korea (국내 지진관측기록의 P파를 이용한 지진현장경보기술 적용)

  • Lee, HoJun;Jeon, Inchan;Seo, JeongBeom;Lee, JinKoo
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.133-143
    • /
    • 2020
  • Purpose: This study aims to derive a predictive empirical equation for PGV prediction from P-wave using earthquake records in Korea and to verify the reliability of Onsite EEW. Method: The noise of P wave is removed from the observations of 627 seismic events in Korea to derive an empirical equation with PGV on the base rock, and reliability of Onsite alarms is verified from comparing PGV's predictions and observations through simulation using the empirical equation. Result: P-waves were extracted using the Filter Picker from earthquake observation records that eliminated noises, a linear regression with PGV was used to derive a predictive empirical equation for Onsite EEW. Through the on-site warning simulation we could get a success rate of 80% within the MMI±1 error range above MMI IV or higher. Conclusion: Through this study, the design feasibility and performance of Onsite EEWS using domestic earthquake records were verified. In order to increase validity, additional medium-sized seismic observations from abroad are required, the mis-detection of P waves is controlled, and the effect of seismic amplification on the surface is required.

Application Instance Satisfaction Analysis of Web Environmental ERP System (웹환경 ERP시스템의 적용사례 만족도 분석)

  • Yang, Hae-Sool;Kang, Sang-Won;Kim, Jong-Ryeol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.11
    • /
    • pp.3144-3154
    • /
    • 2009
  • Recently, people seek to recognize organizationally and cross sectionally the period work of a company such as manufacturing, retail, distribution, accounting, and personnel management in order to maximize company profit. Also, the ERP system, which is used as a management concept for plan management designed to optimize the utilization of management resources in an enterprise like manner, has been introduced for the same purpose. This study has examined the ERP system, which has been currently set up, for the parent company, S. The study has evidentially analyzed the system efficiency and satisfaction level of customers by examining implementation effects after onsite application and by seeking ways of improvement after recognizing the difficulty linked with use discovered after onsite application of the system and rejection by customers by conducting a questionnaire survey.

A Study on the Development of Precast Concrete Modular and its Application Onsite (프리캐스트 콘크리트 모듈러 개발 및 현장적용에 관한 연구)

  • Bae, Kyu-Woong;Boo, Yoon-Seob;Shin, Sang-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.27-28
    • /
    • 2023
  • Currently, the Off-Site Construction (OSC) construction method, which emphasizes the minimization of field work, is being emphasized at construction sites due to the lack of construction skilled manpower, extreme weather, and the Severe Disaster Punishment Act. In this study, we developed a stacked PC modular, which is a method of stacking PC modules, and solved the lifting problem by reducing the weight of the unit module, which is emerging as the biggest disadvantage of PC modules, to around 20 tons. For the connection between modules, structural safety was secured through repeated history tests of the wall and slab connection. Walls and slabs satisfied all statutory fire resistance times through fire resistance tests, and residential performance was evaluated to be satisfactory through mock-up demonstration. The developed PC modular has been applied to the construction of commercial houses, detached houses, shopping malls, churches, etc., and has design results for many buildings such as dormitories, detached houses with 4 floors or more, and resorts, so it is expected that an atmosphere of revitalization of construction methods will be created.

  • PDF

Application of the Onsite Earthquake Early Warning Technology Using the Seismic P-Wave in Korea (P파를 이용한 지진 현장 경보체계기술의 국내 적용)

  • Lee, Ho-Jun;Lee, Jin-Koo;Jeon, Inchan
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.4
    • /
    • pp.440-449
    • /
    • 2018
  • Purpose: This study aims to design and verify an onsite EEWS that extracts the P-wave from a single seismic station and deduce the PGV. Method: The P-wave properties of Pd, Pv, and Pa were calculated by using 12 seismic waveform data extracted from historic seismic records in Korea, and the PGVs were computed using empirical equation on the P properties - PGV relationship and compared with the observed values. Results: Comparison of the observed and estimated PGVs within the alarm level shows the error rate of 86.7% as minimum. By reducing the PTW to 2 seconds, the alarm time can be shortened by 1 second and the seismic blind zone near the epicenter can be shortened by 6 Km. Conclusion: Through this study, we confirmed the availability of the on-site EEWS in Korea. For practical use, it is necessary to develop regression formula and algorithm reflect local effect in Korea by increasing the number of seismic waveform data through continuous observation, and to eliminate the noise from the site.

A Case Study on the Application of Modular System to the Superstructure of Floating Architecture in Europe (플로팅 건축 상부시설에서 모듈러 시스템 적용 유럽 사례 연구)

  • Song, Seog-Ki
    • Journal of Navigation and Port Research
    • /
    • v.36 no.10
    • /
    • pp.873-881
    • /
    • 2012
  • This study is about the case study on the application of modular system to the superstructure of floating architecture in Europe. There are many restraints in the onsite construction of floating architecture. Then, various industrialized construction methods are needed to reduce the portion of the onsite construction in floating architecture. Among the various industrialized construction methods, the modular system can be more suitable for floating architecture. At this background, this study analysed the European cases of the application of modular system and classified the types of applied modular system. As a result, this study could classify the three types of modular system, such as, building unit modular, space unit modular and planning concept modular, and define the characteristics of three types by comparing with each other.

Application of Hybrid Seismic Isolation System to Realize High Seismic Performance for Low-rise Lightweight Buildings (저층 경량건물의 고성능 내진을 위한 복합면진시스템의 적용)

  • Chun, Young-Soo
    • Land and Housing Review
    • /
    • v.4 no.2
    • /
    • pp.185-192
    • /
    • 2013
  • This study presents application effects of hybrid seismic isolation system to realize high seismic performance for low-rise lightweight buildings through a non-linear analysis and onsite experiments. The complex seismic isolation system applied in this study is a method of mixing sliding bearing and laminated rubber bearing in order to overcome limitation of laminated rubber bearing in increasing natural period of the whole seismic isolation system. As a result of the non-linear analysis, seismic isolation buildings designed with complex seismic isolation system are safe because its maximum response displacement is within allowable design displacement even for a strong earthquake which rarely occurs and its maximum response shear is less than design seismic force. As a result of the onsite experiment, the rigidity of seismic isolation stories corresponds to approximately 95.8% of the design equivalent stiffness value. This indicates that actual properties of the whole seismic isolation system correspond to design values.

Application Study of Condition Monitoring Technology for Emergency Diesel Generator at Nuclear Power Plant (원자력발전소 비상디젤발전기 상태감시 기술 적용 연구)

  • Choi, K.H.;Park, J.H.;Park, J.E.;Lee, S.G.
    • Journal of Power System Engineering
    • /
    • v.13 no.1
    • /
    • pp.53-58
    • /
    • 2009
  • The emergency diesel generator(EDG) of the nuclear power plant is designed to supply the power to the nuclear reactor on Station Black Out(SBO) condition. The operation reliability of onsite emergency diesel generator should be ensured by a conditioning monitoring system designed to monitor and analysis the condition of diesel generator. For this purpose, we have developing the technologies of condition monitoring for the wolsong unit 3&4 standby diesel generator including diesel engine performance. In this paper, technologies of condition monitoring for the wolsong standby diesel generator are described about three step. First is for selection of operating parameter for monitoring. Second is for technologies of online condition monitoring, Third is for monitoring of engine performance.

  • PDF

A Study on the Application of CRUDTRAN Code in Primary Systems of Domestic Pressurized Heavy-Water Reactors for Prediction of Radiation Source Term

  • Song, Jong Soon;Cho, Hoon Jo;Jung, Min Young;Lee, Sang Heon
    • Nuclear Engineering and Technology
    • /
    • v.49 no.3
    • /
    • pp.638-644
    • /
    • 2017
  • The importance of developing a source-term assessment technology has been emphasized owing to the decommissioning of Kori nuclear power plant (NPP) Unit 1 and the increase of deteriorated NPPs. We analyzed the behavioral mechanism of corrosion products in the primary system of a pressurized heavy-water reactor-type NPP. In addition, to check the possibility of applying the CRUDTRAN code to a Canadian Deuterium Uranium Reactor (CANDU)-type NPP, the type was assessed using collected domestic onsite data. With the assessment results, it was possible to predict trends according to operating cycles. Values estimated using the code were similar to the measured values. The results of this study are expected to be used to manage the radiation exposures of operators in high-radiation areas and to predict decommissioning processes in the primary system.

A BIM and UWB integrated Mobile Robot Navigation System for Indoor Position Tracking Applications

  • Park, JeeWoong;Cho, Yong K.;Martinez, Diego
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.30-39
    • /
    • 2016
  • This research presents the development of a self-governing mobile robot navigation system for indoor construction applications. This self-governing robot navigation system integrated robot control units, various positioning techniques including a dead-reckoning system, a UWB platform and motion sensors, with a BIM path planner solution. Various algorithms and error correction methods have been tested for all the employed sensors and other components to improve the positioning and navigation capability of the system. The research demonstrated that the path planner utilizing a BIM model as a navigation site map could effectively extract an efficient path for the robot, and could be executed in a real-time application for construction environments. Several navigation strategies with a mobile robot were tested with various combinations of localization sensors including wheel encoders, sonar/infrared/thermal proximity sensors, motion sensors, a digital compass, and UWB. The system successfully demonstrated the ability to plan an efficient path for robot's movement and properly navigate through the planned path to reach the specified destination in a complex indoor construction site. The findings can be adopted to several potential construction or manufacturing applications such as robotic material delivery, inspection, and onsite security.