• Title/Summary/Keyword: apartment construction

Search Result 1,405, Processing Time 0.03 seconds

Analysis of Structural Work Scheduling of Green Frame - Focusing on Apartment buildings - (Green Frame의 골조공사 공기 분석 연구 - 공동주택을 중심으로 -)

  • Lee, Sung-Ho;Kim, Shin-Eun;Kim, Gwang-Hee;Joo, Jin-Kyu;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.301-309
    • /
    • 2011
  • Apartment housings that adopt a bearing wall structure design, which account for a majority of the housing units available in Korea, are not free from structural constraints that limit the extension of their service life. The resulting need for reconstruction from the ground up requires a massive consumption of resources and energy, and triggers environmental pollution resulting from construction wastes. As a solution to such issues, the government enforces incentive schemes to promote a remodeling-friendly rahmen structure design. Green Frame, which is a novel concept of composite precast concrete structure to support rahmen structure apartment housing buildings, can address the constraints of bearing wall structure and conventional rahmen structure designs that limit the potential for remodeling projects, while reducing the term of construction. Therefore, this study aims to analyze the characteristics of Green Frame and its absolute term of construction, and compare the terms of frame work construction in apartment housing projects adopting different structural design approaches to illuminate their differences. In the end, Green Frame is found to be capable of reducing the term of construction in apartment housing projects. As the term of construction is a very critical element of a construction project, Green Frame will ultimately prove to be one of the key enablers to ensure the success of apartment housing construction projects.

The Status of Apartment Informationalization and Inhabitants Awareness The development of Apartment Informationalization system(I) (아파트 정보화의 실태와 주민의식 -아파트 정보화 시스템 개발(I)-)

  • 김한수;임준홍;송흥수
    • Journal of the Korean housing association
    • /
    • v.12 no.1
    • /
    • pp.21-31
    • /
    • 2001
  • This study was conducted to analyze the status of apartment informationalization through the research of distribution of super express network, apartment home pages and Inhabitants awareness. 1st. The construction business launched the full-scale apartment informationalization in 1999. Since then, the infomationalization has been developed multilaterally while the apartment home pages are playing a major role in cooperation with construction business and Internet business. The academic interest and research on the informationalization, however, are not enough. 2nd. The distribution of super express network, which is based on the informationalization is accelerated by the government policy. Especially in our country where the apartment is the major type of housing, we have favorite environment for the informationalization and can create our own housing culture. 3rd. The number of the apartment home pages now is increased to over 6,000, but its contents, know-how, and technique to build the system have not been advanced enough. 4th. So far the home pages have not been able to function well enough to strengthen the community awareness and are likely to result in the unbalanced informationalization. 5th. The study shows that residents interest in the computer and the Internet is fairly high. The utilization of the Internet is varied according to the age, sex, occupation, academic background, income and so forth. Especially they are not as interested in the housing informationalization as in the general information, but the preference of the apartment home pages and the super express network is so tremendous that its distribution will keep the momentum.

  • PDF

A Study on the Emotional Factors in an Apartment External Space Impact on the Residential Consumption Behavior (아파트 외부공간의 감성적 요소가 주거소비행태에 미치는 영향에 관한 연구)

  • Jung, Eun-Hye;Jeong, Jun-Hyun
    • Journal of the Korean housing association
    • /
    • v.22 no.3
    • /
    • pp.15-24
    • /
    • 2011
  • The purpose of the research is analyzing how the emotional factors of the external apartment design can be influenced by the consumers' emotional reaction, and analyzing how the emotional reaction of the consumers will affect the expenditure of the apartment in the upcoming future. For this purpose, first, external surrounding factors of the apartment are extracted and then classified into three major design categories (instinctive, behavioral, and reflective design), and each factor is evaluated by the emotional evaluation. The scope of the research is restricted to the apartments in Daegu city which are built by Top 3 construction companies from the analysis of construction-working rank (May, 2010). The residential-expenditure data are extracted from D-univ. students, in accordance with the satisfaction of the external surroundings and emotional-reaction against the emotional-design factors of the apartment. This research is done by the statistic analysis program SPSS17.0. This shows that difference of emotional design by the apartment external space requisites will be significance as fundamental data for development of application and planning and apartment external space of emotional design by the apartment external space in the future.

A Study on the Living Room Cabinet Furniture Design for the Apartment (아파트 거실장 가구디자인 연구)

  • Kang, Shin-Woo;Cha, Sung-Hee
    • Journal of the Korea Furniture Society
    • /
    • v.18 no.3
    • /
    • pp.166-176
    • /
    • 2007
  • Thanks to the recent apartment housing sales in new cities and metropolitan area, the public-use furniture market is greatly animated with the development of customized furniture. Nevertheless, the situation becomes difficult because of the fierce competition among the furniture suppliers with quoting at the lower price to get the order. In order to produce unique and stylish living cabinets, it is required for the furniture designer to create the design under the systematic design process collaborated with the construction company and make the design proposal thereby to the construction company. The present paper is focused on the re-usability of TV set currently possessed by the tenant, variability, uniqueness, pricing level suitable for the cost of real estate sales, modern design and so on. in the development of apartment living room cabinet. Thus, it is important for the furniture supplier to realize the importance of the design field in order to enhance the competitiveness of the customized furniture in the apartment housing. Accordingly the present researcher has developed the modem variable living room cabinet in accordance with the systemic design process by realizing the leads of tenant of the apartment housing and then establishing the concept focused on the design required by both the tenant and construction company.

  • PDF

Causes of Construction Delays of Apartment Construction Projects: Comparative Analysis between Vietnam and Korea

  • Kim, Young-Mok;Kim, Soo-Yong;Luu, Truong-Van
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.214-226
    • /
    • 2008
  • Construction delay caused considerable losses to project parties. Avoiding construction delays is important to save costs for project stakeholders. The main objective of this paper is to identify major causes of construction delays of apartment construction projects in Vietnam. Sixteen causes of delay were identified through a questionnaire survey of 166 professionals. Factor analysis was employed to categorize these causes. The results of the survey revealed the main causes of delay of apartment projects in Vietnam are: (1) owner's and contractor'S financial difficulties; (2) lack of experienced contractors; (3) late delivery of materials; (4) late construction site handover; (5) owner's late payments for completed works; (6) low bid prices; (7) inappropriate construction method; and (8) defective works and unnecessary reworks. Factor analysis uncovered that causes of delay can be grouped under five categories labeled the five INs: incompetence, ineffectiveness, inadequateness, inapplicableness and inconceivableness. Comparative analysis between the Vietnam construction industry (VCI) and the Korea construction industry (KCI) has been performed to infer valuable lessons for researchers and practitioners in the VCI and the KCI. Comparative analysis indicated that main causes of delay in the VCI somewhat differ from main causes of delay in the KCI. However, "contractor'S financial difficulties", "late construction site handover", "unnecessary rework", "incapable designers", "site clearance difficulties" are common causes of delay in the VCI as well as the KCI. The findings of this research can be used as a guideline to overcome problems in the VCI as well as in other construction industries. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in Korea.

A Study on the Presumption of Construction Cost of Public Apartment by Analyzing Actual Construction Cost (실적공사비 분석을 통한 공공주택 공사비 추정에 관한 연구)

  • Yoon, Woo-Sung;Lee, Hyun-Chul;Lee, Han-Min;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.132-144
    • /
    • 2009
  • In this study, the basic data for calculating the proper construction cost as minimizing the uncertainty at the stage of forecasting construction cost with the basis of the analysis on the actual construction cost within completed domestic public apartment house. In this regard, 23 public apartment houses by each region which were ordered by the Korea National Housing Corporation and completed from 2004 to 2007 were selected as the objects of study. Four works such as common temporary installation, construction work, civil work and machine/equipment work which are the important direct cost items based on the actually inputted and settled construction costs were classified by completion year, region, architectural area, and the distribution type considering inflation rate. The sequent actual construction costs per 3.3m2 were compared and analyzed by each work, the proper construction costs were analogized and the calculating formula were presumed with the basis of average actual construction costs to be analyzed and presented.

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

Estimation Method of Waste Amount from Materials to Develop Generation Rates of Construction Waste in New Apartment Construction Sites: Focused on Bill of Quantities for Architectural Works (신축아파트 현장의 건설폐기물 발생원단위 개발을 위한 자재별 폐기물 수량 예측 방법: 건축공사 내역서의 투입 물량을 중심으로)

  • Jung, Jong-Suk;Song, Sang-Hoon;Park, Seong-Sik;Lee, Seok-Je
    • Land and Housing Review
    • /
    • v.5 no.1
    • /
    • pp.41-51
    • /
    • 2014
  • The amount of new apartment construction has been trending upward in 3~4% each year since 11% increase in 2002. Currently, in public apartment construction sites under separate delivery system for construction waste processing, the significant difference between estimated quantity for contract and actual amount frequently causes severe controversy among project participants. Many factors such as poor environmental management, inadequate contractual amount are assumed to influence the above problem, and the requirement to revise existing generation rates, the key criteria applied in estimating the quantities of waste, is increasing. Most of generation rates were established in early 2000's, and have difficulty in reflecting the changes from new materials and technologies accordingly. Therefore, this study aims to clarify the types of construction waste for each trade and the forecast method as preliminary work in order to develop more accurate generation rates for construction waste in new construction. To achieve this purpose, the architectural bills of quantities in ten apartment projects executed during 2010~2013 were collected, and the possible waste types and reasonable material loss ratio for each item from temporary works to owner-supplying material area were defined and compared through the workshops and interviews with the experts and on-site environmental managers. The results of this study will contribute to establishing the categories of construction waste for construction trades and proper generation rates by the indirect estimation method in new apartment construction in the follow-up study.

An Examination of a Risk Assessment Method and Analysis of Defect Types of Apartment Finishing Works (공동주택 마감공사의 하자유형별 분석 및 위험성 평가 방법에 관한 연구)

  • Son, Seunghyun;Lee, Jae-hyeon;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.2
    • /
    • pp.249-260
    • /
    • 2024
  • In recent years, the proportion of medium and small-sized apartments within the housing market has seen a noticeable increase, alongside a corresponding rise in disputes related to construction defects. Such disputes are most prevalent in the finishing works phase of construction, which not only are frequent in occurrence but also impose significant repair costs. Furthermore, there is a noticeable scarcity of research focused on the quality management of finishing work defects prior to the completion of construction. Addressing this issue necessitates a methodology capable of preemptively identifying defects by analyzing their frequency and associated costs across various defect types. Consequently, the aim of this study is to propose a risk assessment methodology by conducting an analysis of defect cases across 3,299 apartment units, considering aspects such as frequency and severity. The outcomes of this research endeavor are expected to offer practical management strategies to enhance the quality of apartment finishing works and serve as an academic foundation for the enhancement of construction management systems pertaining to apartment finishing works.

Approach of establishing As-Is BIM Model Process in Apartment Remodeling project using 3D Laser Scanning. (공동주택 리모델링 사업에서 3D 레이저스캐닝 기술을 활용한 기존 구조체 As-Is BIM모델 구축 프로세스 제안)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.183-184
    • /
    • 2015
  • More than 50% of the existing buildings in Korea are over 15 years old. Therefore it is necessary to be held reconstruction or remodeling deteriorated buildings more efficiently. Especially, since remodeling project reserves existing structures, it requires less period of project and construction period compare to reconstruction. It is possible to minimize uncertainty in communication between participants and able to manage information and construct efficiently in remodeling projects. This paper is first step of integrated BIM-based whole lifecyle management of apartment remodeling process. It suggests 3D laser scanner specification factors and site constraint factors for mapping between two groups. Therefore it will contribute to develop mapping algorithm of two groups and find optimal combination for apartment remodeling.

  • PDF