The Transactions of the Korean Institute of Electrical Engineers A
/
v.55
no.1
/
pp.37-44
/
2006
In this paper we explore the susceptibility of common sensitive loads by voltage sags of power distribution systems. The experimental approach was used for obtaining the susceptibility of single-phase loads and the three-phase induction motor. The experimental result of single-phase loads was transformed to the ITIC(Information of Technology Industry Council) format and used for evaluating the adverse impacts of a individual and repetitive sags using the performance contour of the foreign standard data. In order to assess the impact of voltage sags on three-phase induction motor, also, the experiment was peformed. The experiment was focused on the current, torque, and speed loss of the motor during a voltage sag. For comparing the impacts of individual and repetitive voltage sags, the variations of motor torque is focused among the experimental results. The sensitive curves of instantaneous current peak are used to describe the susceptibility of three-phase induction motor and 진so it were used for the quantitative analysis of the impact of three-phase induction motor due to voltage sags. Through the results of experiment, we verified that some types loads have more severe impact at repetitive voltage sags than individual ones and proposed method can be effectively used to evaluate the actual impact of voltage sags.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.6
/
pp.1034-1040
/
2010
This paper presents a calculation method of the area of severity for the stochastic assessment of voltage sags. In general, the annual expected numbers of voltage sags at an individual load point can be estimated stochastically. However, in order to assess the system voltage sag performance considering many sensitive load points together, it is necessary to determine and analysis the area of severity for the load points. The area of severity to voltage sags is the network region where the fault occurrences will simultaneously lead to voltage sags at different load points. In this paper, the concept of the voltage sag assessment and the calculation method of the area of severity are addressed. The analysis of the area of severity is performed on the IEEE 30-bus test system by using the proposed method. The method is useful for the stochastic assesment of voltage sags and the establishment of systematic plans for voltage sag mitigation.
KIEE International Transactions on Power Engineering
/
v.5A
no.3
/
pp.293-299
/
2005
Automatic reclosing is a typical protection method in power distribution systems for the clearing of temporary faults. However, it has a fatal weakness in regards to voltage sags because it produces repetitive voltage sags. In this paper, we explored the repetitive impact of voltage sag due to the automatic reclosing of power distribution systems. The actual tests of low voltage loads were carried out for obtaining the susceptibility of voltage sags. The final results of the tests yielded power acceptability curves of voltage sag, and the curves transformed the 3-dimensional CBEMA (Computer Business Equipment Manufacturer Association) format. For the quantitative evaluation of the impact of repetitive voltage sags, an assessment formulation using the voltage sag contour was proposed. The proposed formulation was tested by using the voltage sag contour data of IEEE standard and the results of the test. Through the case studies, we verified that the proposed method can be effectively used to evaluate the actual impact of repetitive voltage sags.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.53
no.12
/
pp.678-684
/
2004
Automatic reclosing is a typical protection method in power distribution systems for clearing the temporary faults. However, it has a fatal weakness in regards to voltage sags because it produces successive voltage sags. In this paper, we explored successive impact of voltage sag due to the automatic reclosing of power distribution systems. The actual tests of low voltage loads were accomplished for obtaining the susceptibility of voltage sags. The final results of the test yielded power acceptability curves of voltage sag, and the curves were transformed the 3-dimensional CBEMA(Computer Business Equipment Manufacturer Association) format. For the quantitative evaluation of the impact of successive voltage sags, an assessment formulation using the voltage sag contour was proposed. The proposed formulation was tested by using the voltage sag contour data of IEEE standard and the results of the test. Through the case studies, we verified that the proposed method can be effectively used to evaluate the actual impact of successive voltage sans.
Park, Jomg-Il;Song, Young-Won;Park, Chang-Hyun;Jang, Gil-Soo
Proceedings of the KIEE Conference
/
2011.07a
/
pp.324-325
/
2011
This paper addresses the assessment of voltage sag costs based on the stochastic prediction of voltage sags. When voltage sags below a certain voltage threshold occur at sensitive industrial process, the industrial customer will experience financial damage. In order to mitigate voltage sag costs and devise efficient solutions to mitigate damage, a study on the financial loss assessment of voltage sags is basically needed. In order to assess the voltage sag costs, the expected sag frequency at a sensitive load point should be calculated by using the concept of the area of vulnerability and historical fault statistics. Then, financial loss due to voltage sags can be obtained by multiplying the expected sag frequency by the cost per sag event.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.16
no.1
/
pp.76-84
/
2002
Voltage sags caused by line faults in transmission and distribution lines have become one of the most important power quality problems facing industrial customers and utilities. Voltage sags are normally described by characteristics of both magnitude and duration, but phase angle shifts should be taken account in identifying sag phenomena and finding their solutions. In this paper, voltage sags due to line faults such as three phase-to-ground, single line-to-ground, and line-to-line faults are characterized by using symmetrical component analysis, for fault impedance variations. Voltage sags and their effect on the magnitude and phase angle are examined. Balanced sags of three phase-to-ground faults show that voltages and currents are changed with equivalent levels to all phases and the zero sequence components become zero. However, for unbalanced faults such as single line-to-ground and line-to-line faults, voltage sags give different magnitude variations and phase angle shifts for each phase. In order to verify the analyzed results, some simulations based on power circuit models are also discussed.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.54
no.6
/
pp.315-322
/
2005
In this article, 1 would like to explore the estimation method of time-varying voltage sags in large industrial systems considering the short circuit contributions of rotating machines. For the power distribution system of KEPCO(Korea Electric Power Corporation), the magnitude of initial symmetrical short circuit current is generally not changed. However, in industrial systems which contain a number of rotating machines, the magnitude of voltage sag is generally changed from the initial to the clearing time of a fault due to the decreasing contribution of rotating machines for a fault current. The time-varying characteristics of voltage sags can be calculated using a short circuit analysis that is considered the time-varying fault currents. For this, the prediction formulations of time-varying voltage sags are proposed using a foreign standard. The proposed method contains the consideration of generator and motor effects. For the test of proposed formulations, a simple system of industrial consumer is used for the comparison conventional and proposed estimation method of voltage sag characteristics.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.5
/
pp.13-20
/
2008
Power quality problems such as momentary interruptions and voltage sags do not great influence on loads at past. However, the interests in power quality problems increase as the use of sensitive loads with microprocessor like computers increases recently. Accordingly, power system reliability research focusing to sustained interruption and momentary interruption partially needs more accurate evaluation methods including momentary and instantaneous problems. That is, many sensitive loads being tripped by voltage sags result in interruption costs. In this paper, new reliability worth evaluation method is presented considering voltage sags. We calculated the magnitude of voltage sags using fault studies and the duration of voltage sags using the trip time of protective relays for each fault. Moreover, we includes the customer interruption cost resulted from sensitive load trip by voltage sags. Through case studies, we evaluate the effects of voltage sags for permanent faults.
Park, Chang-Hyun;Lee, Kyebyung;Lee, Hansang;Yoon, Dong-Hee
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.11
/
pp.1611-1617
/
2015
This paper presents an effective approach for establishing countermeasures against voltage sags based on the concept of area of severity. In order to apply preventive measures against faults such as lightning arrester, overhead earth wires and so on, it is important to find optimal points for installing the preventive measures. The optimal points can be determined by the calculation of the area of severity(AOS) to voltage sags and the expected sag frequency per unit length of line. In this paper, an effective method to find optimal points to apply countermeasures against voltage sags is addressed with case studies.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.2
/
pp.199-208
/
2012
This paper proposes a quasi Z-source DVR(Dynamic Voltage Restorer) system with a series connection of the output terminals, to compensate the voltage variations in the 6.6[kV]/60[Hz] power distribution system. The conventional DVR using one quasi Z-source AC-AC converter has the advantage which it can compensate the voltage variations without the need for the additional energy storage device such as a battery, but it is impossible to compensate for the 50[%] under voltage sags. To solve this problem, a DVR system using two quasi Z-source AC-AC converters with the series connection of the output terminals is proposed. By controlling the duty ratio D in the buck-boost mode, the proposed system can control the compensation voltage. For case verification of the proposed system, PSIM simulation is achieved. As a result, in case that the voltage sags-swells occur 10[%], 20[%], 60[%] in power distribution system, and, in case that the 50[%] under voltage sags-swells continuously occur, all case could compensate by the proposed system. Especially, the compensated voltage THD was examined under the condition of the 10[%]~50[%] voltage sags and the 20[${\Omega}$]~100[${\Omega}$] load changes. The compensated voltage THD was worse for the higher load resistances and more severe voltage sags. Finally, In case of the voltage swells compensation, the compensation factor has approached nearly 1 regardless of the load resistance changes, while the compensation factor of voltage sags was related to the load variations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.