• Title/Summary/Keyword: an Analysis of Actual Cost in Maintenance

Search Result 27, Processing Time 0.025 seconds

A Study on Sensitivity Analysis of Life-Cycle Cost of Concrete Bridges (콘크리트 교량의 생애주기비용 민감도 분석)

  • Koo, Bon-Min;Byun, Kuen-Joo;Song, Ha-Won
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.773-776
    • /
    • 2004
  • The so-called Life Cycle Cost (LCC) analysis on reinforced concrete bridge can provide useful information for initial design and maintenance plan of the RC bridge. This paper proposes an LCC prediction equation and a sensitivity analysis method for RC bridges. An LCC equation for the RC bridge which includes initial investment cost, maintenance cost, and demolition cost was derived and verified from the data for design and construction of an RC slab bridge. In order to solve uncertainty problem on actual discount rate and material characteristics in the analysis of LCC of concrete bridges, a sensitivity analysis method on the LCC using the Monte Carlo simulation technique was suggested.

  • PDF

A Method for Determining Appropriate Maintenance Intervals of Equipments in Thermal Power Stations

  • Nakamura, Masatoshi;Katafuchi, Tatsuro;Hatazaki, Hironori
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1998.10a
    • /
    • pp.312-317
    • /
    • 1998
  • Reliable maintenance scheduling of main equipments is a crucial problem in thermal power stations in order to skirt overall losses of power generation resulted from severe failures of the equipments. A reasonable method was proposed to determine the maintenance scheduling of whole pump system in thermal power stations in order to reduce the maintenance cost by keeping the present avail-ability of the pump system throughout the operation. The dimensional reduction method was used to solve problems encountered due to few data which involved many operational factors in failure rate of pumps. The problem of bandlimited nature of data with time was solved by extrapolating future failures from presently available actual data with an aid of Weibull distribution. The results of the analysis identified the most suitable maintenance intervals of each pump type accordingly and hence reduce the cost of unnecessary maintenance with an acceptable range in the overall system availability.

  • PDF

A Study on an Estimation of Adjusted Coefficient for the Maintenance of Information Security Software in Korea Industry (정보보안 소프트웨어 유지보수 대가기준을 위한 보정계수 산정에 관한 연구)

  • Park, You-Jin;Park, Eun-Ju
    • The Journal of Society for e-Business Studies
    • /
    • v.16 no.4
    • /
    • pp.109-123
    • /
    • 2011
  • The maintenance prices in information security industry between Korean companies and foreign companies have been a big difference. Korea Information Security SW maintenance standards were not adequate for the rate, and there was disagreement between domestic companies and governments. This research, therefore, surveyed a standard of information SW and the status of maintenance payment rates. The study suggests an estimation method and verifies the method and an appropriate maintenance cost rate. According to the results of the study, the current maintenance cost should be increased or decreased independent with a kind of information security systems. Based on the study, Korea government is able to change the maintenance policy in information security. And the domestic companies get a theoretical ground for improving the rates of maintenance costs in information security systems and are able to allot the resources effectively.

A Study on Maintenance Actual Condition and Revitalization of Rural Development Project (일반농산어촌개발사업 완료지구 시설물 실태분석 및 활성화 방안 연구)

  • Choi, Young-Wan;Kim, Keun-Ho;Eun, Hee-Chang;Lee, Young-Kyu;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.1-8
    • /
    • 2016
  • This study is intended to prepare an revitalization plan of region where rural development project is completed through an analysis of the actual condition of facility operation and maintenance in the region where the project is completed. The results of survey of actual condition of facility operation in the region where rural development project was completed showed that the facilities were not self-sufficient in terms of operation and maintenance cost. Therefore, a prerequisite to the revitalization of region where the project is completed is to prepare an alternative plan for increasing the efficiency and applicability of currently already prepared facilities. Second, a project operation organization system should be streamlined and the competency of operation personnel should continue to be strengthened. Third, it is necessary to prepare a support system and establish cooperation networks for increasing the extensibility of project and continuing to induce community revitalization in the region where the project is completed in the future.

A Study on Determining the Optimal Replacement Interval of the Rolling Stock Signal System Component based on the Field Data (필드데이터에 의한 철도차량 신호장치 구성품의 최적 교체주기 결정에 관한 연구)

  • Byoung Noh Park;Kyeong Hwa Kim;Jaehoon Kim
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.2
    • /
    • pp.104-111
    • /
    • 2023
  • Rolling stock maintenance, which focuses on preventive maintenance, is typically implemented considering the potential harm that may be inflicted to passengers in the event of failure. The cost of preventive maintenance throughout the life cycle of a rolling stock is 60%-75% of the initial purchase cost. Therefore, ensuring stability and reducing maintenance costs are essential in terms of economy. In particular, private railroad operators must reduce government support budget by effectively utilizing railroad resources and reducing maintenance costs. Accordingly, this study analyzes the reliability characteristics of components using field data. Moreover, it resolves the problem of determining an economical replacement interval considering the timing of scrapping railroad vehicles. The procedure for determining the optimal replacement interval involves five steps. According to the decision model, the optimal replacement interval for the onboard signal device components of the "A" line train is calculated using field data, such as failure data, preventive maintenance cost, and failure maintenance cost. The field data analysis indicates that the mileage meter is 9 years, which is less than the designed durability of 15 years. Furthermore, a life cycle in which the phase signal has few failures is found to be the same as the actual durability of 15 years.

Proposal of Maintenance Scenario and Feasibility Analysis of Bridge Inspection using Bayesian Approach (베이지안 기법을 이용한 교량 점검 타당성 분석 및 유지관리 시나리오 제안)

  • Lee, Jin Hyuk;Lee, Kyung Yong;Ahn, Sang Mi;Kong, Jung Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.505-516
    • /
    • 2018
  • In order to establish an efficient bridge maintenance strategy, the future performance of a bridge must be estimated by considering the current performance, which allows more rational way of decision-making in the prediction model with higher accuracy. However, personnel-based existing maintenance may result in enormous maintenance costs since it is difficult for a bridge administrator to estimate the bridge performance exactly at a targeting management level, thereby disrupting a rational decision making for bridge maintenance. Therefore, in this work, we developed a representative performance prediction model for each bridge element considering uncertainty using domestic bridge inspection data, and proposed a bayesian updating method that can apply the developed model to actual maintenance bridge with higher accuracy. Also, the feasibility analysis based on calculation of maintenance cost for monitoring maintenance scenario case is performed to propose advantages of the Bayesian-updating-driven preventive maintenance in terms of the cost efficiency in contrast to the conventional periodic maintenance.

An Empirical analysis of the Effect of Variables on Maintenance Expenses of Public Rental Housing (공공임대주택 시설물 유지관리비 영향요인 실증분석)

  • Kang, Hyun-Kyu;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.185-192
    • /
    • 2006
  • The maintenance expenses of public rental housing have drastically been increased as facilities become obsolete. As an effective means of managing such a situation, accurate estimating of maintenance expenses and securing financial resources are crucially important. It, therefore, is necessary to analyze major factors affecting on maintenance expenses of public rental housing's facilities, and develop an effective instrument to estimate them. On the other hand, the U.S.A, where approximately 60 percent of public rental housing's operating costs are supported by the state, has already developed an effective tool to forecast operating costs based on several years' actual data. As a result, public rental housing has been operating with a reasonable level. However, there have been no remarkable researches and studies in this field in Korea. In this context, this study attempts to examine principal determinants of maintenance expenses of public rental housing's facilities, and their influence based on the latest five years' actual operating costs. This study may contribute to develop an objective and precise tool to forecast maintenance expenses of public rental housing.

A Basic Study on the Development of O&M Cost Assessment Model to Improve Operational Efficiency of Large Public Research Infrastructures (CAM) (대형 공공연구인프라의 운영 효율성 제고를 위한 운영 및 유지관리비 평가모델 개발 기초연구)

  • Choi, Sun-Ah;Son, Seung-Hyun;Lee, Sung-Ho;Oh, Oum-Joong;Han, Bum-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.93-94
    • /
    • 2021
  • The Korean government has invested a tremendous amount of money in the last 10 years to build large public research infrastructures (LPRI). For efficient operation and maintenance of LPRI built with expensive equipment and professional engineers, reasonable budget needs to be allocated. However, it is difficult to fulfill sustainable operation and maintenance (O&M) because there is no standard on budgeting for efficient LPRI operation, including expensive equipment and manpower allocation. There have been a lot of cost assessment studies regarding O&M of high-demand facilities such as hospitals, hotels and residential buildings, but a very few on sustainable O&M of LPRI. Therefore, mid/long-term budget establishment plans for efficient LPRI O&M are required from the initial planning stage and a cost assessment model to support the plans should be developed. The objective of this paper is to propose a cost assessment model for sustainable operation and maintenance of large public research infrastructures. To do so, actual O&M data of 6 LPRI types in operation are collected, and regression analysis model (RAM) is used for development and evaluation a cost assessment model. The study result will support sustainable operation of LPRI from a business perspective and be used as basic data for continuous development of cost assessment models to establish budgets for LPRI operation from an academic perspective.

  • PDF

An Empirical Study on Pricing Model for Software Operation (소프트웨어 운영 대가산정 방식에 대한 실증적 연구)

  • Kim, Heungshik;Kim, Choong Nyoung;Seo, Yongwon
    • Journal of Information Technology Services
    • /
    • v.18 no.4
    • /
    • pp.67-82
    • /
    • 2019
  • The purpose of this study is to improve the calculation method of the software operation pricing proposed by the software business price calculation guide from 'input manpower method' to 'rate calculation method'. The software operation pricing of the input manpower method is not objectively calculated in the domestic IT outsourcing situation where the statistical data based on the activity based estimating is insufficient and it is decided by agreement between the owner and the client. In addition, there was no standard for adjusting the productivity according to the characteristics of the operation service. In order to improve this, an operational correction factor item that can affect the software operation productivity was selected based on foreign and domestic standards, and it was confirmed through the first questionnaire to IT operation managers. In order to determine the level of difficulty of the fixed operational correction factors, the operational correction factor using AHP technique was confirmed through a second questionnaire for pairwise comparison. The operational difficulty calculation table was developed with reference to COCOMO and ITIL standards. Finally, we propose a new pricing scheme that reflects the operating rate. Regression analysis was carried out by collecting the data of the domestic public institutions on the estimated cost and the actual cost calculated from the new rate method software operation pricing. The results of the regression analysis show that the estimated cost and the actual cost are related to each other. Mean magnitude of relative error(MMRE) and PRED[25] analysis were added for accuracy analysis. MMRE and PRED also showed satisfactory results, confirming the possibility of replacing the rate method software operation pricing.

Effectiveness analysis about Readjustment of Fishery Permit (어업허가 일제정비제도 도입에 따른 효과분석)

  • Lee, Kwang-Nam;Jung, Jin-Ho
    • The Journal of Fisheries Business Administration
    • /
    • v.42 no.2
    • /
    • pp.97-112
    • /
    • 2011
  • The coastal and offshore fishery to manage from a fishery permit system in our country at present seems to be a sign of lots problem, which are illegal fishing, a permit rent, non fishing vessel the purpose of vessel reduction, fishery compensation, tax exemption oil, the excessive occurrence of administrative cost due to differences during a period of a fishery permit. All the readjustment system for the permit has suggested an effective solution for a fishery permit management, the maintenance of a fishery order(the prevention of illegal fishery), the prevention of unused fishery, the entrance of new vessel in coastal fishery and it's system has prevent this problems in ahead. This paper has estimated an prevention convenience for an illegal spill of the tax exemption oil, actual effects of vessel reduction, the conservation of fishery resource for the future value and carried out an economic analysis to estimate compliance cost for the system introduction. Also, this study have analyzed throughly the coastal fishery situation and catched lots of issues on the management for the permit system. Especially, the problems improving the readjustment introduction for the permit have estimated the social and economic effects quantitatively and qualitatively with a calculated technique to classify various scenarios. This paper has judged correctly the term of validity for the permit to shorten as a result of the estimation and it will be to take the net convenience cost 1,655thousand million won. The results of this study have expect to provide a basic data to introduce the readjustment system for the permit.