• Title/Summary/Keyword: allowable level

Search Result 335, Processing Time 0.026 seconds

A Study on Rail Vibration and Its Reduction Plan in Central Daejeon Area (대전 도심지역의 철도진동의 영향과 대책)

  • Ryu, Myoung-Ik;Suh, Man-Cheol;Lee, Won-Kook
    • Journal of the Korean Geophysical Society
    • /
    • v.3 no.4
    • /
    • pp.269-280
    • /
    • 2000
  • Rail vibration in city zone is becoming a serious environmental problem. In order to make a reduction plan for rail vibration, the research was conducted in which many experiments to measure actual rail vibration along the railroad through the central Deajeon area. A digital vibration level meter was used to measure rail vibration. Vibration levels of Z-axis were measured at every second for the duration of the train passing. The measuring station was placed at every 5m for the distance of 55m. A total of 353 different sets of vibration level were obtained. The signals were processed to get $L_{10}$ value and analyzed in terms of distance, train velocity, and number of trains. As a result, it has been found that rail vibration exceed the allowable vibraton limit of 60 dB, at the point of 25 m far from the railroad center, which is regulated by the las of vibration and noise. Train velocity was found to affect a little for vibration level within the zone. It was also found that a trench installed along a railroad could reduce vibration level up to approximately 10 percent. A model test was conducted to investigate the influence of the location and size of trench, on the transfer of vibration. A heavy steel ball was used to generate vibrations. On the basis obtained from this study, it could be concluded that the application of distance-attenuation and the installment of a trench along railroad could be applied as a reduction plan for rail vibration. Because limitions might exist to depend on the effect of distance attenuation, trenchs excavated along a railroad might be suggested as the most efficient solution to reduce railroad vibration.

  • PDF

Shape Optimization of the Plane Truss Structures by Mixed Cooridination Method (혼합조정법(混合調整法)에 의한 평면(平面) 트러스 구조물(構造物)의 형상최적화(形狀最適化)에 관한 연구(硏究))

  • Lee, Gyu Won;Lim, Jeong Whan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.11 no.1
    • /
    • pp.55-68
    • /
    • 1991
  • In this study, Mixed coordination method was selected to optimize the shape of the truss structures which takes multi-loading condition, allowable stress, buckling stress, displacement constraints into consideration. The structure was devided into substructures by Goal coordination method and the substructures were optimized by model coordination method which used two-level technique. Therefore the number of design variables and constrints can be decreased considerable. Under the condition of the same disign, the weight of truss structures can be decreased more considerable by means of optimizing even the shape of truss than by means of optimizing the section of truss while fixing geometrical configuration of it, even though there might be a little difference according to the early geomatrical shape of the truss and the design condition. Thus, the shape optimization of truss structures which utilize the results of this study can be helpful to the economical design of truss structures.

  • PDF

A Study on the Cause and Improvement of Crack in the Installing Structure of the Bulkhead of Aircraft (항공기 Bulkhead 체결구조의 균열 원인 및 개선에 관한 연구)

  • Choi, Hyoung Jun;Park, Sung Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.6
    • /
    • pp.448-454
    • /
    • 2020
  • This study aims to determine the cause of structural defects occurring during aircraft operations and to verify the structural integrity of the improved features. The fracture plane was analyzed to verify the characteristics of the cracks and the fatigue failure leading to the final fracture was determined by the progress of the cracks by the repeated load. During aircraft operations, the comparative analysis of the load measurement data at the cracks with the aircraft design load determined that the measured load was not at the level of 30% of the design to be capable of being damaged. A gap analysis resulted in a significant stress of approximately 32 ksi at the crack site. Pre-Load testing also confirmed that the M.S. was reduced by more than 50% from +0.71 to +0.43, resulting in a sharp increase in aircraft load and the possibility of cracking when combined. Thus, structural reinforcement and the removal of the gap for aircraft cracking sites improved the defect. Based on the structural strength analysis of the improvement features, the bulkhead has a margin of about +0.88 and the fitting feature is about +0.48 versus allowable stress. In addition, the life analysis results revealed an improvement of approximately 84000 hours.

A Study on the Status of Nutrition Support in Bone Marrow Transplantation Patients (골수이식 환자의 영양지원 실태에 관한 연구)

  • Kim, Jeong-Nam;Im, Hyeon-Suk;Song, Seung-Eun
    • Journal of the Korean Dietetic Association
    • /
    • v.4 no.1
    • /
    • pp.65-75
    • /
    • 1998
  • Recently, the number of patients who received Bone Marrow Transplantation(BMT) has been increased dramatically and the diseases for which BMT if efficacious are increasing. Adequate nutritional card for BMT patients is crucial for the success of BMT because nutritional deficiency could provoke deteriorative effects. However, little is known about nutritional status among BMT patients in Korea. This study was conducted to assess oral and parenteral intake of BMT patients and compare the change of nutritional status before and after BMT. Twenty-two BMT patients who were admitted to the Severance hospital from December in 1995 to September in 1997 participated in the study. Total calorie requirements were calculated for each patients individually and nutritional support for each patients consisted of oral and parenteral feeding. To assess oral intake of BMT patients, each patients recorded the amount of food they have eaten from 6 days before BMT to 28 days after BMT. The medical records of each patients were used to assess parenteral intake. To compare the nutritional status before and after BMT, the results of anthropometric and biochemical test from 14 days before BMT to 28 days after BMT were used. At the time of admission, the patients were in allowable nutritional status and their total calorie intake was 93% of total calorie requirement. When the preparative regimen for BMT was started, the patients' oral intake was dramatically decreased below 400kcal/day. Even though their oral intake was increased after BMT, their oral intake at the 4th week after BMT was only 752kcal/d, which is only 35.8% of total calorie requirement. The patients' mean oral intake during BMT period (from 6 days before BMT to 28 days after BMT) was only 439kcal/d. Although Total Parenteral Nutrition(TPN) was added when the preparative regimen was started, the patients' mean total caloric intake during BMT period was 111% of basal energy expenditure and 83% of total calorie requirement. The mean total protein intake was only 58% of total protein requirement. In the comparison of nutritional status between pretransplant phase and posttransplant phase in BMT patients, their body weight and serum albumin level were significantly decreased(p<0.001). These results show inadequacies in nutritional intake among BMT patients, and indicate the need of TPN during BMT period.

  • PDF

An analysis of problems and countermeasures in the installation of plastic greenhouse on reclaimed lands (간척지에 플라스틱 온실 설치 시의 문제점 분석 및 개선방안)

  • Yu, In-Ho;Ku, Yang-Gyu;Cho, Myeong-Whan;Ryu, Hee-Ryong;Moon, Doo-Gyung
    • Korean Journal of Agricultural Science
    • /
    • v.41 no.4
    • /
    • pp.473-480
    • /
    • 2014
  • Upon setting up a dedicated plastic greenhouse for tomato cultivation developed by the Rural Development Administration on the Gyehwa reclaimed land, this study was aimed at analyzing the problems can be occurred in the installation of plastic greenhouse on reclaimed lands as well as finding out solutions for improvement. A relatively cheaper wooden pile was used in the installation in order to supplement the soft ground conditions. Based on the results of ground investigation of the installation site, both the allowable bearing capacity and pulling resistance of the wooden pile with a diameter of 150 mm and a length of 10 m were computed and came out to be 30.645 kN. It was determined that the values were enough to withstand the maximum compressive force (17.206 kN) and the pullout force (20.435 kN) that are generally applied to the greenhouse footing. There are three problems aroused in the process of greenhouse installation, and the corresponding countermeasures are as follow. First, due to the slightly bent shape of the wooden pile, there were phenomenon such as deviation, torsion, and fracture when driving the pile. This could be prevented by the use of the backhoe (0.2) rotating tongs, which are holding the pile, to drive the pile while pushing to the direction of the driving and fixing it until 5 m below ground and applying a soft vibrating pressure until the first 2 m. Second, there exists a concrete independent footing between the column of the greenhouse and the wooden pile driven to the underground water level. Since it is difficult to accurately drive the pile on this independent footing, the problem of footing baseplate used to fix the column being off the independent footing was occurred. In order to handle with this matter, the diameter of the independent footing was changed from 200 mm to 300 mm. Last, after films were covered in the condition that the reinforcing frame and bracing are not installed, there was a phenomenon of columns being pushed away by the strong wind to the maximum of $11m{\cdot}s^{-1}$. It is encouraged to avoid constructions in winter, and the film covering jobs always to be done after the frame construction is completely over. The height of the independent footing was measured for 9 months after the completion of the greenhouse installation, and it was found to be within the margin of error meaning that there was no subsidence. The extent to the framework distortion and the value of inclinometers as well showed not much alteration. In other words, the wooden pile was designed to have a sufficient bearing capacity.

Shear Behavior of Precast Prestressed Inverted-Tee Concrete Beams with Dapped Ends (프리캐스트 프리스트레스트 콘크리트 역티형보의 댑단부 전단거동)

  • 유승룡
    • Journal of the Korea Concrete Institute
    • /
    • v.13 no.1
    • /
    • pp.46-53
    • /
    • 2001
  • Two full scale precast pretensioned dapped ended rectangular beams designed by PCI design handbook for a major domestic live load of market and parking building - 500kgf/㎡ and 1,200kgf/㎡ were investigated experimentally. The bottom length of beams was 60cm which was same to the length of rectangular column in the base of five-story market or parking buildings. The height of dap was web hight plus half of the flange height within the allowable limit of PCI method. Shear tests were performed on four beam ends. Followings were obtained from the experimental study. All of the specimens were fully complied with the PCI design handbook. Two of four specimens which were designed for live load of 1,200kgf/㎡ showed crackings at the re-entrant corner of dap before the full service loadings, and failed by direct shear at the load level much less than their calculated nominal strength. The specimens designed for live load of 1,200kgf/㎡ failed at 772 tonf and 78.36tonf by direct shear crackings. This strength was less than PCI limit of 81.9 tonf and higher than ACI limit of 65.62tonf. Thus, the limit suggested by ACI seems more reasonable in regard of safety in view of this test results. According to load-strain curves, the strain of hanger reinforcement reached almost yield strain. It is recommended to use more inclined hanger reinforcement of improve the strength and serviceability.

Effect of Restriction of Dry Matter and Nutrient Intakes on Productivity of Holstein Lactating Cows Offered High Levels of Concentrate (건물 및 영양소 섭취량 제한이 농후사료 급여 비율이 높은 착유우의 생산성에 미치는 영향)

  • Cho, Young-Seok;Rim, Jong-Su;Jang, Won-Seok;Kim, Myeong-Hwa;Lee, Sang-Rak
    • Journal of Animal Science and Technology
    • /
    • v.51 no.1
    • /
    • pp.33-38
    • /
    • 2009
  • Effects of dry matter intake restriction to the level of recommend by NRC (2001) on intake balance of dry matter and nutrients in Holstein lactating cow were evaluated. 24 lactating cows were divided into two groups and individually fed one of the TMR offered as ad libitum (control) and restricted amount (treatment) as recommended by NRC (2001). Milk yield including 4% FCM and FPCM were showed higher tendency in treatment group then those of control group. Also, intakes of dry matter, net energy and metabolizable protein were tended to be higher in treatment group then control group. Actual dry matter and net energy intakes in control group were higher (p<0.001) then those of recommended amount by NRC (2001), whereas no significant differences in treatment group. The estimated $NE_L$ allowable milk yield were lower (p<0.001) in both control and treatment group than those of recommended by NRC (2001). It was concluded that to allow ad libitum feeding of diet containing high levels of concentrate to the lactating cows might decrease the efficiency of feed nutrients and hence result in no positive effect on productivity of milk.

Structural Performance of High Strength Grout-Pilled Splice Sleeve System (고강도 모르타르 충전식 철근이음의 구조성능에 관한 실험연구)

  • 김형기;안병익;남재현;박복만
    • Journal of the Korea Concrete Institute
    • /
    • v.13 no.5
    • /
    • pp.516-524
    • /
    • 2001
  • Among many connection methods of reinforcing bar, the grout-filled splice sleeve system is very effective method of precast concrete construction due to its superior construction efficiency, such as large allowable limit to arrangement of reinforcing bars, good application of large sized reinforcing bars. In this study, totally 20 full-sited specimens were made and tested under monotonic and cyclic loading in order to extend the usage range of grout-filled splice sleeve system. The experimental variables adopted in this study are size of reinforcing bars embedded in upper and lower part of sleeve and compressive strength of filled mortar etc. After test was performed, the results were compared and analyzed with respect to previous test of author. Following main conclusions are obtained : 1) The structural performance of splice sleeve system is improved with increasing compressive strength of filled mortar. And also it was verified that the splice sleeve system with over 700 kgf/㎠ mortar compressive strength and over 6.54 development length of reinforcing bar retains the structural performance of over A class(AIJ Criteria). 2) In the case of using different size of reinforcing bars embedded in upper and lower part of sleeve, the result show that splice sleeve matching with large sized reinforcing bar must be used. And also up to 2 level smaller size of reinforcing bar compared to large reinforcing bar embedded in sleeve can be used.

Centralized Controller High-altitude Work Car Elevations Lift Structure Safety Assessment (중앙집중식 컨트롤러 고소작업차의 고소리프트의 구조안정성 평가)

  • Kim, Jun-tae;Lee, Gi-yeong;Lee, Sang-sik;Park, Won-yeop
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.10 no.4
    • /
    • pp.350-357
    • /
    • 2017
  • This study was conducted as a post - study on the development of a centralized controller and a hydraulic lift system including structural analysis and remote control for the development of a vertically elevated car. The safety review was carried out through the structural modification of the elevator lift which was developed during the previous research. 3D modeling was performed with Solidworks, and a model of finite element was created through Hypermesh S / W. In addition, the loading environment of the work vehicle for the evaluation is a condition in which the loading amount is 250 kg per position (total, upper, upper, lower, and lower) on the work table, ), The structural analysis was carried out under the condition that the load was 600 kg, and safety was examined in various aspects. As a result, when the allowable load of 250 kg and the excess load of 600 kg are excluded (except Case-11), the stress level is below the yield strength. In the case of Case-11, there is a region exceeding the yield strength at the center support portion of the safety bar at the upper end even after excluding the component which generates the maximum stress, but it does not affect the safety aspect of the whole structure Respectively. Looking at the deflection results, it can be seen that in all cases the maximum deflection occurs in the same table, and the tendency of sagging in both 250 kg and 600 kg is the same.

A Study on Establishment of Buffer Zone of Radioactive Waste Repository (방사성패기물 처분시설에서의 완충공간 설정에 대한 고찰)

  • Yoon, Jeong-Hyoun;Park, Joo-Wan;Ju, Min-Su;Kim, Chang-Lak;Park, Jin-Baek
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.6 no.1
    • /
    • pp.45-54
    • /
    • 2008
  • A new proposed repository has a final capacity of 800,000 drums radioactive waste. Most of foreign repositories have a general practice of segregating control zones which mainly contributes to classification of degree of control, whether it is called buffer zone or not. Domestic regulatory requirements of establishment of buffer zone in a repository are not much different from those of nuclear power plants for operation period, in which satisfactory design objective or performance objective is the most important factor in determination of the buffer zone. The meaning of buffer zone after closure is a minimum requested area which can prevent inadvertant intruders from leading to non-allowable exposure during institutional control period. Safety assessment with drinking well scenario giving rise to the highest probability of exposure among the intruder's actions can verify fulfillment of the buffer zone which is determined by operational safety of the repository. At present. for the repository to be constructed in a few years, the same procedure and concept as described in this paper are applied that can satisfy regulatory requirements and radiological safety as well. However, the capacity of the repository will be stepwise extended upto 800,000 drums, consequently its layout will be varied too. Timely considerations will be necessary for current boundary of the buffer zone which has been established on the basis of 100,000 drums disposal.

  • PDF