• Title/Summary/Keyword: allocation of pollution discharge

Search Result 5, Processing Time 0.019 seconds

A Study on the Activation of Non-government Participation in Total Maximum Daily Load System using Private Discharge Facilities Reduction Potential Analysis (개별배출시설 삭감잠재량 분석을 통한 수질오염총량제의 민간참여 활성화 방안 연구)

  • Kim, Hongtae;Shin, Dongseok;Kim, Hyeonjeong;Choi, Inuk;Lee, Miseon;Kim, Yongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.6
    • /
    • pp.715-722
    • /
    • 2015
  • Four major river basin in Korea has been managed with Total Maximum Daily Load(TMDL) System. Water quality indicators as targeted pollutants for TMDL were BOD and TP. In order to satisfy water quality criteria, government allocation using public treatment facilities and its action plan has been used. However, the role to improve water quality were recently faced to its limitation. It is time to require the role of non-government allocation in private discharge facilities to control good water quality. This study investigated three different scenarios in reduction demands of non-government allocations about industry and private sewages. The three different scenarios were discharge under 1) legal water quality standard, 2) water quality level in 2011 and 3) current water quality level with maximum value in group. The results showed that reduction potential in water discharge for TP indicator was 1,118kg/day, under second scenario with 20% of deduction. This results arrived at 42% of whole reduction potential costs and 0.012mg/L improvement in water quality. In conclusion, to intrigue voluntary participation in non-government allocation, various benefits such as tax reduction, tax exemption, and water quality trading should be provided.

Study on Allocation of Pollution Discharges by Watersheds and Administrative Regions with Pollution Sources for the TMDL (Total Maximum Daily Load) in Tamjin River (탐진강의 총량규제를 위한 오염원별 수계${cdot}$행정구역 허용부하량과 삭감부하량 할당에 관한 연구)

  • Hwang Kum-Lok;Hwang Dae-Ho;Paik Do-Hyeon;Lee Hong-Keun
    • Journal of Environmental Health Sciences
    • /
    • v.30 no.5 s.81
    • /
    • pp.449-454
    • /
    • 2004
  • This study is to calculate Allocation of Pollution Discharges by administrative region for the TMDL (Total Maximum Daily Load) on Tamjin River. TMDL has the water quality target and value ($BOD_5$, 1 ppm) and is calculated by the QUAL2E model. The expected TMDL for Tamjin River is 1,532,360 kg/day. The calculation showed that the main pollutants are due to the non-point sources in Tamjin River and the aqua-farms are another important sources near the bay. And sources from population and livestock should be reduced, especially aqua-farm source should be managed and eliminated first which is over 14,000 ton/day.

Evaluation on Actual Discharge Data for TMDL in Nakdong River Basin (낙동강수계 수질오염총량관리를 위한 유량조사 평가)

  • Kim, Gyeong-Hoon;Kim, Yong-Seok;Park, Bae-Kyung;Yoon, Jong-Su;Shin, Chan-Ki
    • Journal of environmental and Sanitary engineering
    • /
    • v.23 no.4
    • /
    • pp.65-71
    • /
    • 2008
  • To drive efficiently total water pollution load management, needs to calculate the exact load emissions, pollution load allocation and implementation evaluation in each unit area of watershed and accurate and regular flow of data. For these reasons, the Nakdong River TMDL Research Center has produced directly or indirectly in the average interval of eight days (30 times or more / year) 41 points for unit area of the total water pollution load management and 8-point of municipal requirement for a total of 49 branches as a flow data in 2004 from August. This acquired the survey flow is evidence of trends and changes each point in the Nakdong River based on time, such as 10 years based on average design flow available to the foundation of the summit as the major water policy is to be utilized. This study was performed on actual discharge measuring data and introduced performance results each drainage basin of Nakdong River from 2004 to 2008 over the total of past five years.

Research on How to Set 3rd Phase Target Water Quality on the Boundary between Metropolitan Cities/Dos Specified in Nakdong River Basin (낙동강수계 3단계 광역시·도 경계지점 목표수질 설정 방법 연구)

  • Hwang, Ha Sun;Park, Ji Hyung;Kim, Yong Seok;Rhew, Doug Hee;Choi, Yu Jin;Lee, Sung Jun
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.1
    • /
    • pp.70-77
    • /
    • 2017
  • Total Pollution Load Control (TPLC) is a system for managing the discharge load assigned by satisfying the Target Water Quality (TWQ) in Standard Flow Conditions (SFC). TWQ for a between Metropolitan Cities/Dos Specified (Cites/Dos TWQ) is very important to be the basis of each Unit Watershed TWQ. The purpose of this study was to establish a rational and scientific 'Calculation Metohd of Cites/Dos TWQ'. A methodology for the 3rd phase 'Cites/Dos TWQ' was proposed in this study based on review of the past phase (1rd and 2rd) 'Cites/Dos TWQ' in nakdong river. And utilized water quality model to estimate 3rd phase 'Cites/Dos TWQ' The allocation method of individual discharge sources are important for estimating 'Cites/Dos TWQ' In this case, the key point of the method of calculating the total allowable individual sources is the balance of the equity and the efficiency between individual sources of reduced pollutants. Thus, water quality shall be determined with regard to the current emission levels, the reduction capacity and the technical possibilities of individual sources. We estimate 3rd phase 'Cites/Dos TWQ' according to the 'Calculation Method of Cites/Dos TWQ'.

A Waste Load Allocation Study for Water Quality Management of the Incheon Coastal Environment (인천해안의 수질관리를 위한 오염부하량 할당에 관한 연구)

  • Kim, So-Yeon;Choi, Jung-Hyun;Na, Eun-Hye;Park, Seok-Soon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.1
    • /
    • pp.43-51
    • /
    • 2005
  • This paper presents a waste load allocation study for the Incheon coastal environment, where a computer model, called AQUASEA, was applied. A finite element mesh was constructed and refined to cover the complicated geometry of Incheon coastal sea. The tidal height at 13 places of Incheon coastal boundary and flow of the Han River were given as an input condition to the tidal simulation. All pollution sources that discharge into Incheon coast were given as input data to the water quality simulation. The modeled parameters include tidal flow and COD(Chemical Oxygen Demand). The model was calibrated and verified with the field measurements. The model results showed reasonable agreements with field measurements in both tidal flow and water quality. Systems analysis showed that the pollution load from the Han River caused recognizable impacts on the water quality of Incheon coast from Yeomhwa waterway to northern area of Younghungdo. The loads from Incheon City affected water quality from the area below Youngjongdo to the area above Jawalldo. The discharge from the Sihwa Lake caused discernible impacts on the coastal zone from the dike outlet to the Incheon harbor, and pollution loads from Kyungkido affected the sea near the Oido. An effective water quality management plan was developed from the waste load allocation analysis of the validated model, that the maximum waste loads can be discharged without violating the water quality standard given in the Incheon coastal environment.