• Title/Summary/Keyword: air vehicle

Search Result 1,556, Processing Time 0.022 seconds

토양 및 지하수 Investigation 과 Remediation에 대한 현장적용

  • Wallner, Heinz
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2000.11a
    • /
    • pp.44-63
    • /
    • 2000
  • Situated close to Heathrow Airport, and adjacent to the M4 and M25 Motorways, the site at Axis Park is considered a prime location for business in the UK. In consequnce two of the UK's major property development companies, MEPC and Redrew Homes sought the expertise of Intergeo to remediate the contaminated former industrial site prior to its development. Industrial use of the twenty-six hectare site, started in 1936, when Hawker Aircraft commence aircraft manufacture. In 1963 the Firestone Tyre and Rubber Company purchased part of the site. Ford commenced vehicle production at the site in the mid-1970's and production was continued by Iveco Ford from 1986 to the plant's decommissioning in 1997. Geologically the site is underlain by sand and gravel, deposited in prehistory by the River Thames, with London Clay at around 6m depth. The level of groundwater fluctuates seasonally at around 2.5m depth, moving slowly southwest towards local streams and watercourses. A phased investigation of the site was undertaken, which culminated in the extensive site investigation undertaken by Intergeo in 1998. In total 50 boreholes, 90 probeholes and 60 trial pits were used to investigate the site and around 4000 solid and 1300 liquid samples were tested in the laboratory for chemical substances. The investigations identified total petroleum hydrocarbons in the soil up to 25, 000mg/kg. Diesel oil, with some lubricating oil were the main components. Volatile organic compounds were identified in the groundwater in excess of 10mg/l. Specific substances included trichloromethane, trichloromethane and tetrachloroethene. Both the oil and volatile compounds were widely spread across the site, The specific substances identified could be traced back to industrial processes used at one or other dates in the sites history Slightly elevated levels of toxic metals and polycyclic aromatic hydrocarbons were also identified locally. Prior to remediation of the site and throughout its progress, extensive liaison with the regulatory authorities and the client's professional representatives was required. In addition to meetings, numerous technical documents detailing methods and health and safety issues were required in order to comply with UK environmental and safety legislation. After initially considering a range of options to undertake remediation, the following three main techniques were selected: ex-situ bioremediation of hydrocarbon contaminated soils, skimming of free floating hydrocarbon product from the water surface at wells and excavations and air stripping of volatile organic compounds from groundwater recovered from wells. The achievements were as follows: 1) 350, 000m3 of soil was excavated and 112, 000m3 of sand and gravel was processed to remove gravel and cobble sized particles; 2) 53, 000m3 of hydrocarbon contaminated soil was bioremediated in windrows ; 3) 7000m3 of groundwater was processed by skimming to remove free floating Product; 4) 196, 000m3 of groundwater was Processed by air stripping to remove volatile organic compounds. Only 1000m3 of soil left the site for disposal in licensed waste facilities Given the costs of disposal in the UK, the selected methods represented a considerable cost saving to the Clients. All other soil was engineered back into the ground to a precise geotechnical specification. The following objective levels were achieved across the site 1) By a Risk Based Corrective Action (RBCA) methodology it was demonstrated that soil with less that 1000mg/kg total petroleum hydrocarbons did not pose a hazard to health or water resources and therefore, could remain insitu; 2) Soils destined for the residential areas of the site were remediated to 250mg/kg total petroleum hydrocarbons; in the industrial areas 500mg/kg was proven acceptable. 3) Hydrocarbons in groundwater were remediated to below the Dutch Intervegtion Level of 0.6mg/1; 4) Volatile organic compounds/BTEX group substances were reduced to below the Dutch Intervention Levels; 5) Polycyclic aromatic hydrocarbons and metals were below Inter-departmental Committee for the Redevelopment of Contaminated Land guideline levels for intended enduse. In order to verify the qualify of the work 1500 chemical test results were submitted for the purpose of validation. Quality assurance checks were undertaken by independent consultants and at an independent laboratory selected by Intergeo. Long term monitoring of water quality was undertaken for a period of one year after remediation work had been completed. Both the regulatory authorities and Clients representatives endorsed the quality of remediation now completed at the site. Subsequent to completion of the remediation work Redrew Homes constructed a prestige housing development. The properties at "Belvedere Place" retailed at premium prices. On the MEPC site the Post Office, amongst others, has located a major sorting office for the London area. Exceptionally high standards of remediation, control and documentation were a requirement for the work undertaken here.aken here.

  • PDF

A Legal Study on the Certificate System for Light Sports Aircraft Repairman (경량항공기 정비사 자격증명제도에 관한 법적 고찰)

  • Kim, Woong-Yi;Shin, Dai-Won;Lee, Gi-Myung
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.33 no.1
    • /
    • pp.175-204
    • /
    • 2018
  • Recently, the aviation leisure business has been legislated, and related industries have become active base with increasing the light sports aircraft within the legislation system. However, in the light sports aircraft safety problem, it is often mentioned that the flight is in violation of the regulations, the lack of safety consciousness of the operator and lack of ability, and the personal operators have a risk of accident of light aircraft such as insufficient safety management and poor maintenance. At present, the maintenance of light sports aircraft is carried out by the A & P mechanic in accordance with the relevant laws and regulations, but it is difficult to say that it is equipped with qualification and expertise. It is not a legal issue to undertake light sports aircraft maintenance work on the regulation system. However, the problem of reliability and appropriateness is constantly being raised because airplanes, light sports aircraft, and ultra-light vehicle are classified and serviced in a legal method. Although legal and institutional frameworks for light sports aircraft are separated, much of it is stipulated in the aviation law provisions. Light sports aircraft maintenance work also follows the current aircraft maintenance system. In the United States, Europe, and Australia where General Aviation developed, legal and institutional devices related to maintenance of light aircraft were introduced, and specialized maintenance tasks are covered in the light aircraft mechanics system. As a result of analysis of domestic and foreign laws and regulations, it is necessary to introduce the qualification system for maintenance of light aircraft. In advanced aviation countries such as the United States, Europe, and Australia, a light sports aircraft repairman system is installed to perform safety management. This is to cope with changes in the operating environment of the new light sports aircraft. This study does not suggest the need for a light aircraft repairman system. From the viewpoint of the legal system, the examination of the relevant laws and regulations revealed that the supplementary part of the system is necessary. It is also require that the necessity of introduction is raised in comparison with overseas cases. Based on these results, it is necessary to introduce the system into the light aircraft repairman system, and suggestions for how to improve it are suggested.

A Study on the Liability for Damage caused by Space Activity - With reference to Relevant Cases - (우주활동에 의하여 발생한 손해배상책임에 관한 연구 - 관련 사례를 중심으로 -)

  • Lee, Kang-Bin
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.26 no.1
    • /
    • pp.177-213
    • /
    • 2011
  • The purpose of this paper is to research on the liability and cases for space damage with reference to the space activity under the international space treaty and national space law of major countries. The United Nations has adopted two treaties relating to the liability for space damage as follows: the Outer Space Treaty of 1967 and the Liability Convention of 1972. Korea has enacted the Outer Space Damage Compensation Act of 2008 relating to the liability for space damages. The Outer Space Treaty of 1967 regulates the international responsibility for national activities in outer space, and the national tort liability for damage by space launching object. The Liability Convention of 1972 regulates the absolute liability by a launching state, the faulty liability by a launching state, the joint and several liability by a launching state, the person claiming for compensation, the claim method for compensation, the claim period of compensation, the claim for compensation and local remedy, the compensation amount for damage by a launching state, and the establishment of the Claims Commission. The Outer Space Damage Compensation Act of 2008 in Korea regulates the definition of space damage, the relation of the Outer Space Damage Compensation Act and the international treaty, the non-faulty liability for damage by a launching person, the concentration of liability and recourse by a launching person, the exclusion of application of the Product Liability Act, the limit amount of the liability for damage by a launching person, the cover of the liability insurance by a launching person, the measures and assistance by the government in case of occurring the space damage, and the exercise period of the claim right of compensation for damage. There are several cases with reference to the liability for damage caused by space accidents as follows: the Collision between Iridium 33 and Cosmos 2251, the Disintegration of Cosmos 954 over Canadian Territory, the Failure of Satellite Launching by Martin Marietta, and the Malfunctioning of Westar VI Satellite. In the disputes and lawsuits due to such space accidents, the problems relating to the liability for space damage have been settled by the application of absolute(strict) liability principle or faulty liability principle. The Liability Convention of 1972 should be improved as follows: the clear definition in respect of the claimer of compensation for damage, the measure in respect of the enforcement of decision by the Claims Commission. The Outer Space Damage Compensation Act of 2008 in Korea should be improved as follows: the inclusion of indirect damage into the definition of space damage, the change of the currency unit of the limit amount of liability for damage, the establishment of joint and several liability and recourse right for damage by space joint launching person, and the establishment of the Space Damage Compensation Review Commission. Korea has built the space center at Oinarodo, Goheung Province in June 2009. Korea has launched the first small launch vehicle KSLV-1 at the Naro Space Center in August 2009 and June 2010. In Korea, it will be the possibility to be occurred the problems relating to the international responsibility and the liability for space damage in the course of space activity. Accordingly the Korean government and launching organization should make the legal and systematic policy to cope with such problems.

  • PDF

The Definition and Regulations of Drone in Korea (韓国におけるドロ?ンの定義と法規制)

  • Kim, Young-Ju
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.34 no.1
    • /
    • pp.235-268
    • /
    • 2019
  • Under the Aviation Safety Act of Korea, any person who intends to operate a drone is required to follow the operational conditions listed below, unless approved by the Minister of Land, Infrastructure, Transport and Tourism; (i) Operation of drones in the daytime, (ii) Operation of drones within Visual Line of Sight, (iii) Maintenance of a certain operating distance between drones and persons or properties on the ground/ water surface, (iv) Do not operate drones over event sites where many people gather, (v) Do not transport hazardous materials such as explosives by drone, (vi) Do not drop any objects from drones. Requirements stated in "Airspace in which Flights are Prohibited" and "Operational Limitations" are not applied to flights for search and rescue operations by public organizations in case of accidents and disasters. This paper analyzes legal issues as to definition and regulations of drones in Korean Aviation Safety Act. This paper, also, offers some implications and suggestions for regulations of drones under Korean Aviation Safety Act by comparing the regulations of drones in Japanese Civil Aeronautics Act.

Building up User-Oriented Road Planning and Design Schemes (국민참여형 도로계획의 수립방향)

  • Kim, Eung-Cheol;Kwon, Young-In;Yun, Seong-Soon;Kang, Jin-Goo
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.5 s.83
    • /
    • pp.47-55
    • /
    • 2005
  • Roads deeply affect the life of people and keep doing an important role to support economic growth of a country. According to the budget plan of the ministry of construction and transportation of Korea, 8.1 trillion won have been allotted for road investment in the year of 2002 which occupy 61% of the transportation infrastructure special account (13.3 trillion won) and 4.7% of the total national budget (1,740 trillion won). It is true that services generated from road investment such as mobility enhancement and increased accessibility have shown positive effects through shortened travel time and decreased vehicle operating cost. However, it is also notable that many negative effects are gradually being discussed and those are nowadays getting severer due to enhanced people interests about road construction, increased concerns on environment and active public involvement that were evoked by traffic accidents, air pollution & noise and destruction of environment. Road construction processes in Korea are normally governed by administrative sectors (suppliers) not by users. These processes ate very weak to accomodate user s needs and community concerns thus easy to fail finalizing a road project without hassles. A public hearing process is supposed to be held in the processes of detailed design step and the environmental impact analysis. However, it is not enough to grab user's needs and community concerns. Increased public involvement frequencies, optimized public involvement timing and enhanced depth of public involvement magnitude are suggested to improve the current poor public involvement schemes in road planning and design processes. The application of these recommended methods to the road planning and design processes may guarantee the change from the current supplier-oriented schemes to the new user-oriented one. Also, this study suggests to reset objectivity and clarity of road construction process, to make conciliation guidelines based on many practical cases that produced good results, to introduce public involvement techniques in a stepwise basis, and to foster the professionals via education and training programs.

Neuroprotection of Recombinant Human Erythropoietin Via Modulation of N-methyl-D-aspartate Receptors in Neonatal Rats with Hypoxic-ischemic Brain Injury (신생 백서의 저산소성 허혈성 뇌손상에서 NMDA receptor 조절을 통한 유전자 재조합 인 에리스로포이에틴의 신경보호)

  • Jang, Yoon-Jung;Seo, Eok-Su;Kim, Woo-Taek
    • Neonatal Medicine
    • /
    • v.16 no.2
    • /
    • pp.221-233
    • /
    • 2009
  • Purpose: Erythropoietin (EPO) has neuroprotective effects in many animal models of brain injury, including hypoxic-ischemic (HI) encephalopathy, trauma, and excitotoxicity. Current studies have demonstrated the neuroprotective effects of EPO, but limited data are available for the neonatal periods. Here in we investigated whether recombinant human EPO (rHuEPO) can protect the developing rat brain from HI injury via modulation of NMDA receptors. Methods: In an in vitro model, embryonic cortical neuronal cell cultures from Sprague-Dawley (SD) rats at 19-days gestation were established. The cultured cells were divided into five groups: normoxia (N), hypoxia (H), and 1, 10, and 100 IU/mL rHuEPO-treated (H+E1, H+ E10, and H+E100) groups. To estimate cell viability and growth, a 3-(4,5-dimethylthiazol-2-yl)-2,5-diphenyl-tetrazolium bromide (MTT) assay was done. In an in vivo model, left carotid artery ligation was performed on 7-day-old SD rat pups. The animals were divided into six groups; normoxia control (NC), normoxia Sham-operated (NS), hypoxia-ischemia only (H), hypoxia-ischemia+vehicle (HV), hypoxia-ischemia+rHuEPO before a HI injury (HE-B), and hypoxia-ischemia+rHuEPO after a HI injury (HE-A). The morphologic changes following brain injuries were noted using hematoxylin and eosin (H/E) staining. Real-time PCR using primers of subunits of NMDA receptors (NR1, NR2A, NR2B, NR2C and NR2D) mRNA were performed. Results: Cell viability in the H group was decreased to less than 60% of that in the N group. In the H+E1 and H+E10 groups, cell viability was increased to >80% of the N group, but cell viability in the H+E100 group did not recover. The percentage of the left hemisphere area compared the to the right hemisphere area were 98.9% in the NC group, 99.1% in the NS group, 57.1% in the H group, 57.0% in the HV group, 87.6% in the HE-B group, and 91.6% in the HE-A group. Real-time PCR analysis of the expressions of subunits of NMDA receptors mRNAs in the in vitro and in vivo neonatal HI brain injuries generally revealed that the expression in the H group was decreased compared to the N group and the expressions in the rHuEPO-treated groups was increased compared to the H group. Conclusion: rHuEPO has neuroprotective property in perinatal HI brain injury via modulation of N-methyl-D-aspartate receptors.