• Title/Summary/Keyword: actual-Based cost

Search Result 675, Processing Time 0.032 seconds

The Efficiency Analysis of the Safety Investment Cost in Construction Work (건설공사의 안전투자비에 대한 효과 분석)

  • Park Jong-Keun;Ro Min-Lae;Yi Kwan-Hyung
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.4 s.68
    • /
    • pp.94-100
    • /
    • 2004
  • This study delivers the actual condition of investment for industrial accident prevention based on survey of 500 construction sites from 'reports for industry safety and health' published by Korea Occupational Safety & Health Agency (KOSHA). The various research techniques were used such as technical statistic analysis for construction industry, cost comparison of industrial accident prevention and accident loss. A formula was deduced to calculate accident loss and accident frequency by accident prevention cost through regression analysis.

DERIVING ACCURATE COST CONTINGENCY ESTIMATE FOR MULTIPLE PROJECT MANAGEMENT

  • Jin-Lee Kim ;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.935-940
    • /
    • 2005
  • This paper presents the results of a statistical analysis using historical data of cost contingency. As a result, a model that predicts and estimates an accurate cost contingency value using the least squares estimation method was developed. Data such as original contract amounts, estimated contingency amounts set by maximum funding limits, and actual contingency amounts, were collected and used for model development. The more effective prediction model was selected from the two developed models based on its prediction capability. The model would help guide project managers making financial decisions when the determination of the cost contingency amounts for multiple projects is necessary.

  • PDF

Network Costing Model Alternatives for Reasonable Interconnection Charging Between Networks (합리적 접속료산정을 위한 통신망비용모형 수립방안)

  • 권수천
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.4 no.5
    • /
    • pp.907-917
    • /
    • 2000
  • In this paper the network costing model alternatives for reasonable interconnection charging are suggested. The current interconnection charge regimes is based on fully distributed costing method. Basically this method doesn't consider the common carrier's efficient network cost because it reflects the actual cost of network In this paper, 1 suggest the basic structure of the network costing model fur applications of incremental costing method that considers the efficient cost based on economics-prospective. And I classify network cost with capital cost and operating cost and analysis their reasonable costing methods.

  • PDF

A Hybrid Approach to Information System Sizing and Selection using Simulation and Genetic Algorithm (시뮬레이션과 유전 알고리즘의 하이브리드 기법을 이용한 정보시스템 용량 산정 및 선택 방안)

  • Min, Jae-H.;Chang, Sung-Woo;Shin, Kyung-Shik
    • Korean Management Science Review
    • /
    • v.24 no.2
    • /
    • pp.143-155
    • /
    • 2007
  • The purpose of this paper is to develop a new method for information system sizing and selection based on a hybrid mixture of simulation and genetic algorithm, and to show its cost-effectiveness by applying it to a real world problem. To serve this purpose, we propose an operational model which identifies a set of system alternatives using simulation, and determines the optimal one using genetic algorithm. Specifically, with simulation, we generate probability distributions describing real data gathered from actual system, which can overcome the major weakness of the existing methodology that normally employs point estimates of the actual data and constant correction factors without theoretical rationale. We next search for the optimal combination of H/W, the number of CPUs, and S/W, which meets both of our business goals of incurring low TCO(total cost of ownership) and maintaining a good level of transaction processing performance. Experimental result shows the proposed method in this paper saves the cost while it preserves the system's capacity within allowable performance range.

Development of safety-Based Guidelines for Cost-Effective Utility Pole Treatment along Highway Rights-of-Way

  • 김정현
    • Proceedings of the KOR-KST Conference
    • /
    • 1997.12a
    • /
    • pp.33-69
    • /
    • 1997
  • This study was conducted to develop a methodology to predict utility pole accident rates and to evaluate cost-effectiveness for safety improvement for utility pole accidents. The utility pole accident rate prediction model was based on the encroachment rate approach introduced in the Transportation Research Board Special Report 214. The utility pole accident rate on a section of highway depends on the roadside encroachment rate and the lateral extent of encroachment. The encroachment rate is influenced by the horizontal and vertical alignment of the highway as well as traffic volume and mean speed. The lateral extent of encroachment is affected by the horizontal and vertical alignment, the mean speed and the roadside slope. An analytical method to generate the probability distribution function for the lateral extent of encroachment was developed for six kinds of encroachment types by the horizontal alignment and encroachment direction. The encroachment rate was calibrated with the information on highway and roadside conditions and the utility pole accident records collected on the sections of 55mph speed limit of the State Trunk Highway 12 in Wisconsin. The encroachment rate on a tangent segment was calibrated as a function of traffic volume with the actual average utility pole accident rates by traffic volume strategies. The adjustment factors for horizontal and vertical alignment were then derived by comparing the actual average utility pole accident rates to the estimations from the model calibrated for tangent and level sections. A computerized benefit-cost analysis procedure was then developed as a means of evaluating alternative countermeasures. The program calculates the benefit-cost ratio and the percent of reduction of utility pole accidents resulting from the implementation of a safety improvement. This program can be used to develop safety improvement: alternatives for utility pole accidents when a predetermined performance level is specified.

  • PDF

Development of safety-Based Guidelines for Cost-Effective Utility Pole Treatment along Highway Rights-of-way

  • 김정현
    • Proceedings of the KOR-KST Conference
    • /
    • 1997.12b
    • /
    • pp.35-72
    • /
    • 1997
  • This study was conducted to develop a methodology to predict utility pole accident rates and to evaluate cost-effectiveness for safety improvement for utility pole accidents. The utility pole accident rate prediction model was based on the encroachment rate approach introduced in the Transportation Research Board special Report 214. The utility pole accident rate on a section of highway depends on the roadside encroachment rate and the lateral extent of encroachment. The encroachment rate is influenced by the horizontal and vertical alignment of the highway as well as traffic volume and mean speed. The lateral extent of encroachment is affected by the horizontal and vertical alignment, the mean speed and the roadside slope. An analytical method to generate the probability distribution function for the lateral extent of encroachment was developed for six kinds of encroachment types by the horizontal alignment and encroachment direction. The encroachment rate was calibrated with the information on highway and roadside conditions and the utility pole accident records collected on the sections of 55mph speed limit of the State Trunk Highway 12 in Wisconsin. The encroachment rate on tangent segment was calibrated as a function of traffic volume with the actual average utility pole accident rates by traffic volume strategies. The adjustment factors for horizontal and vertical alignment were when derived by comparing the actual average utility pole accident rates to the estimations from the model calibrated for tangent and level sections. A computerized benefit-cost analysis procedure was then developed as a means of evaluating alternative countermeasures. The program calculates the benefit-cost ratio and the percent of reduction of utility pole accidents resulting from the implementation of a safety improvement. This program can be used to develop safety improvement alternatives for utility pole accidents when a predetermined performance level is specified.

  • PDF

Life Cycle Cost Analysis at Design Stage of Cable Stayed Bridges based on the Performance Degradation Models (성능저하모델에 기초한 사장교의 설계단계 생애주기비용 분석)

  • Koo, Bon Sung;Han, Sang Hoon;Cho, Choong Yuen
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2081-2091
    • /
    • 2013
  • Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of civil infrastructure is rapidly growing unprecedently in civil engineering practice. Accordingly, in the 21st century, it is almost obvious that life-cycle cost together with value engineering will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, the most researches have only focused on the Deterministic or Probabilistic LCC analysis approach and general bridge at design stage. Thus, the goal of this study is to develop a practical and realistic methodology for the Life-Cycle Cost LCC-effective optimum decision-making based on reliability analysis of bridges at design stage. The proposed updated methodology is based on the concept of Life Cycle Performance(LCP) which is expressed as the sum of present value of expected direct/indirect maintenance costs with expected optimal maintenance scenario. The updated LCC methodology proposed in this study is applied to the optimum design problem of an actual highway bridge with Cable Stayed Bridges. In conclusion, based on the application of the proposed methods to an actual example bridge, it is demonstrated that a updated methodology for performance-based LCC analysis proposed in this thesis, shown applicably in practice as a efficient, practical, process LCC analysis method at design stage.

Using Standard Deviation with Analogy-Based Estimation for Improved Software Effort Prediction

  • Mohammad Ayub Latif;Muhammad Khalid Khan;Umema Hani
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.17 no.5
    • /
    • pp.1356-1376
    • /
    • 2023
  • Software effort estimation is one of the most difficult tasks in software development whereas predictability is also of equal importance for strategic management. Accurate prediction of the actual cost that will be incurred in software development can be very beneficial for the strategic management. This study discusses the latest trends in software estimation focusing on analogy-based techniques to show how they have improved the accuracy for software effort estimation. It applies the standard deviation technique to the expected value of analogy-based estimates to improve accuracy. In more than 60 percent cases the applied technique of this study helped in improving the accuracy of software estimation by reducing the Magnitude of Relative Error (MRE). The technique is simple and it calculates the expected value of cost or time and then uses different confidence levels which help in making more accurate commitments to the customers.

Magnitude of Patient's Cost-sharing for Hospital Services in the National Health Insurance in Korea (의료보험 환자가 병원진료시 부담하는 본인부담 크기)

  • 김창엽;이진석;강길원;김용익
    • Health Policy and Management
    • /
    • v.9 no.4
    • /
    • pp.1-14
    • /
    • 1999
  • The purpose of this study was to estimate the magnitude of patient's actual cost-sharing for hospital services in the National Health Insurance which has been estimated with only a few hospitals or limited number of patients. Also we aimed at analysis of factors influencing the magnitude. Sources of analyzed data were two databases. 1997 medical benefits record of the National Federation of Medical Insurance and 1997 Statistics for Hospital Management from the Korea Institute of Health Services Management(KIHM). We merged two databases and related records for 224 hospitals. based on the identification details of each hospital. The average percent of patients' cost-sharing was 51.7% of total hospital revenues from the insurance. with 40.3% of revenue in inpatient and 67.4% in outpatient. respectively. The contributing hospital factors to the magnitude of cost-sharing were size of hospitals. teaching status. location. number of employed physicians. etc. Larger and university hospital. urban location. and with more physicians were positively correlated with higher level of cost-sharing. Additionally, the higher the expenses of inpatient's treatment was, the higher the size of patient's cost-sharing was. These findings suggest that present level of patients' cost-sharing is quitely high and it is urgent to reduce the patient's cost-sharing to the reasonable level. It would be necessary to extend the coverage of insurance benefits and to develop policies focusing on larger hospitals and inpatient services.

  • PDF

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF