A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.

Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad (매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델)

  • Lee, Young Joo;Jang, Seong Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.595-601
    • /
    • 2011
  • There is currently applied to the unit cost per a distance (KRW/km) for estimating the conceptual cost of civil work on basic planning stage of high speed railroad. This unit cost is an arithmetic average value based on historical data, which could be in big error. It also is difficult to explain the deficiency comparing the estimated cost derived from next basic design stage. This study provides the conceptual estimation model using by the parametric method and regression analysis. Independent variables are the distance and the geological materials (earth, weathered rock, soft-rock, hard-rock), extracting from the actual data to 36 contracts. The deviation between the unit costs estimated using the developed model and the actual cost data is presented in the range from -0.4% to +31%. This range is acceptable compared the typical range "-30% to + 50%". This model will improve the accuracy of existing method and be expected to contribute to effective total cost management and the economic aspects, reduce the financial expenditure.

Construction Cost-Down of Building Substructure by VE Techniques (VE 기법에 의한 건물 지하구조의 공사원가 절감방안)

  • Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.125-132
    • /
    • 2005
  • Domestic construction firms make every effort to save cost and, contrarily, enhance quality for competitive advantage in the market. Structural work of building construction takes chaise of the total cost and schedule, thus elaborate planning and management of the work help to lead the project into a successful way. Therefore, the idea to save time and cost and enhance constructability securing quality and safety of the work should be developed after analyzing the designed documents and site conditions comprehensively in the initial construction planning phase. Value Engineering (VE) technique is introduced in the substructural work in this paper to save cost creatively and systematically in the design and construction phase. A practical VE model that is applied to the underground building work systematically is proposed to save cost and it applies to the actual project to confirm the effectiveness of the model.

Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work (대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.791-800
    • /
    • 2013
  • Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities (2000~2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.

A Cost Evaluation Model for Workflow Instances based on Standard Cost Accounting (표준원가회계방식을 적용한 워크플로우 인스턴스의 비용 평가 모형)

  • Lee, Jae-Hun;Jang, Jung-Sun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2008.10a
    • /
    • pp.460-463
    • /
    • 2008
  • This study tries to apply standard cost accounting model to evaluate the cost of workflow instances. Previous studies mainly focus on matching workflow activities into the elements of Activity based costing in order to assign cost drivers, but rarely examine how to evaluate their instance cost. In this study, we estimate unrealized standard cost from workflow model, and realized cost from accomplished instances. On running, workflow engine cumulates cost of finished activities and it enables to monitor the difference between the target cost and the actual cost dynamically at each step of workflow processes. We implemented a prototype which shows that the proposed work can evaluate effectively the cost of various workflow patterns.

  • PDF

Evaluation for Operational Efficiency of Road Management Equipment using Analytical Hierarchy Process (계층분석법을 이용한 도로관리장비 운영의 효율성 평가)

  • Yang, Choong-Heon;Kim, In-Su
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.157-164
    • /
    • 2012
  • PURPOSES: Regional offices of the Ministry of Land, Transport and Maritime Affairs use a computerized system called KAMIS so as to manage road equipment systematically. Road agencies can record number of operating days by equipment, actual working hours, accumulated operating hours (or distance) by equipment, and operating cost. However, KAMIS does not provide critical information, although it is strongly related to efficient road management equipment operation. In other words, road agencies do not know whether they have sufficient equipment to handle their actual work. METHODS: Therefore, this study suggests a methodology to evaluate for operational efficiency of road management equipment using analytical hierarchy process(AHP). First of all, estimated weights related criteria can be produced by AHP, and then use operational history by pieces of equipment. RESULTS: Results show that importance of management work can differ from weather conditions through five areas. CONCLUSIONS: Commonly, this results can imply to help save money for the purchase and maintenance of road management equipment, and they would improve the functional performance of KAMIS.

Fundamental Study on Visualization of Bar Placing Records Using Augmented Reality (증강현실을 활용한 배근 이력 가시화 방안에 관한 기초적 연구)

  • Park, U-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.126-127
    • /
    • 2018
  • Rebar work is important in terms of cost and process of reinforced concrete construction along with formwork and concrete construction, and the quality of reinforced concrete construction has a great influence on the safety and durability of the structure. Therefore it is important to thoroughly inspect the steel reinforcement after casting the concrete because it is difficult to confirm the actual condition of the reinforcement. The purpose of this study is to develop an augmented reality system to visualize the records of bar placing work, which is increasingly utilized in the construction field. In order to improve maintenance of reinforced concrete, this study suggests a plan to effectively manage the drawing information including the structural drawing, the placing drawing, and the photographed image at the construction and inspection stage, and develop a system that utilizes augmented reality technology that can display the state of the inside of a concrete structure by superimposing it on actual environment.

  • PDF

Development of Prediction Model of Subcontract's Bidding-Ratio for Private Apartment Projects (민간 공동주택 하도급 낙찰률 예측모델 개발)

  • Jang, Ki-Suk;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.250-251
    • /
    • 2021
  • A subcontract work order is the basis of the construction process and consists of the root and trunk of the construction industry. The construction process through a subcontract work order is an important element of project success, and it is the basic unit of creating profit in the construction industry. Therefore, correct analysis and forecasting of subcontract work orders allow correct estimation of construction cost and profit which is the foundation of corporate decision making. This study has started to provide predictions of subcontractor's bidding-ratio for decision-making. Since the actual project data has been used in this study, the contribution level of the model is highly expected in actual field. The statistical confidential level of adjusted decision coefficient is concluded low because of limited sample numbers. However, its accuracy and confidence level can be increased through increasing sample numbers, considering more variables, and studying of reducing error.

  • PDF

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations (금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구)

  • Kim, Hyung-Man;Seo, Guan-Hee;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.5 s.143
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

The Compensation Cost Analysis of Parcels for Land Alternation according to Occupation Ratio to Road (도로 편입률에 따른 토지이동 대상필지 보상비 분석)

  • Lee, Geun Sang;Park, Jong Ahn;Cho, Mi Su;Cho, Gi Sung
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.1
    • /
    • pp.13-22
    • /
    • 2014
  • Recently, many civil appeals have been occurred in land management work because of discord between cadastral records and actual land use pattern. it is important to select parcels for land alternation exactly using land information and to evaluate compensation cost according to scenarios for advancing this problem. This study operated GIS spatial overlay based on serial cadastral maps and actual-width of the road and analyzed the number and area of the parcels for land alternation by the land classification and ownership applying fuzzy membership function according to occupation ratio to road. Also compensation cost was calculated according to scenarios using individual public land price information of the parcels for land alternation and was arranged by district as Eup and Myeon according to land classification and ownership. This study can efficiently support the work of the parcels for land alternation complying with the financial condition of local government, by supplying compensation cost according to scenarios to the parcels of land alternation by district as Eup and Myeon.