• 제목/요약/키워드: achieved construction quality

검색결과 95건 처리시간 0.023초

Durability design and quality assurance of major concrete infrastructure

  • Gjorv, Odd E.
    • Advances in concrete construction
    • /
    • 제1권1호
    • /
    • pp.45-63
    • /
    • 2013
  • Upon completion of new concrete structures, the achieved construction quality always shows a high scatter and variability, and in severe environments, any weaknesses and deficiencies will soon be revealed whatever durability specifications and materials have been applied. To a certain extent, a probability approach to the durability design can take the high scatter and variability into account. However, numerical solutions alone are not sufficient to ensure the durability and service life of concrete structures in severe environments. In the present paper, the basis for a probability-based durability design is briefly outlined and discussed. As a result, some performance-based durability requirements are specified which are used for quality control and quality assurance during concrete construction. The final documentation of achieved construction quality and compliance with the specified durability are key to any rational approach to more controlled and increased durability. As part of the durability design, a service manual for future condition assessment and preventive maintenance of the structure is also produced. It is such a service manual which helps provide the ultimate basis for achieving a more controlled durability and service life of the given concrete structure in the given environment.

CRITICAL SUCCESS FACTORS OF A BUILDING DESIGN TEAM

  • T.H. Nguyen;M. Diab
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.9-18
    • /
    • 2007
  • The success of a building design team is achieved as a result of a combination of multiple events/factors and interactions, and has a great impact on the quality of the building construction process. While most of previous studies have focused on quality of the construction process, the success of a design team has not been completely investigated. This paper presents the critical factors that impact the success of a building design team and describes an assessment tool to measure the successful performance of the design team with respect to the critical factors. The development of the assessment tool employs the concept of quality function deployment (QFD), a technique to measure the service quality of an organization.

  • PDF

건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案) (The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work)

  • 최병주;최현;최석우;김옥규
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

건설공사 실태분석을 통한 품질 및 조직관리 개선방안 (The Improvement Plan of Quality and Organization Management through the Survey of Actual Condition in Construction Work)

  • 최병주;최석우;김옥규
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.213-218
    • /
    • 2007
  • 최근 FTA체결 등 세계건설 시장의 개방으로 인한 국내외적인 주변 건설환경의 급속한 변화속에서 국제경쟁력을 갖추기 위해서는 건설업체의 품질향상을 위한 품질 및 조직관리가 중요하게 대두되고 있다. 그러므로 이에 대한 실태분석을 통하여 개선방안을 마련, 양질의 건축물을 소비자에게 제공함으로써 고객만족을 이룩할 수 있는 품질 및 조직관리 측면에서 연구가 필요하여 실시한 것이다. 품질관리를 위한 전담부서의 조직은 중소건설업체가 크게 미비함으로 인하여 전담부서가 절실히 필요한것으로 나타나 이를 개선하기 위하여 AHP분석을 통한 CEO 직속의 품질전담부서의 조직구조형태가 유지관리측면에서 비용절감효과 등 품질과 조직의 운영이 뛰어난 효과를 가져올 수 있는 것으로 분석되어, 중소건설업체에 품질전담부서를 조직하여 품질개선과 함께 경쟁력 우위를 점해야 할 것으로 사료되어 실시하였다.

  • PDF

장시간 운반에 따라 저하된 콘크리트의 품질회복에 관한 연구 (A Study on the Performance Restoration of Deteriorated Concrete by Long Distance Delivery)

  • 배장춘;김호림;황인성;이형원;양성환;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술대회지
    • /
    • pp.7-10
    • /
    • 2004
  • This paper investigated the possibility of quality restoration of deteriorated concrete caused by long distance delivery using chemical admixtures such as superplasticizer. AE agent and retarding agent. According to test results, long distance delivery lead to reducing fluidity and air content markedly, while setting time accelerated. Quality restoration agent(QRA) was made by combining super- plasticizer. AE agent and retarding agent with the proportion of 1:0.0025:0.1. It was confirmed that deteriorated concrete achieved quality restoration with the level of target slump, air content and setting time without strength loss when using QRA with proper amount.

  • PDF

기계화시공에 의한 보수재료의 현장품질관리확립을 위한 실험적 연구 (An Experimental Study for Establishment of On-Site Quality Control of Repair Material by the mechanized construction)

  • 조봉석;장재봉;김용로;강석표;홍성윤;김무한
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2004년도 춘계 학술발표회 제16권1호
    • /
    • pp.160-163
    • /
    • 2004
  • In domestic, various repair materials and method systems to keep up with these reinforced concrete deteriorated due to salt damage, carbonation, chemical decay et. developed and applied. However, on-site quality control of various repair materials and method systems isn't achieved desirably because it is depend completely on a men of experience' opinions above all else regardless of various on-site environments. In this background, mock up test with due regard to real on-site environments was performed to secure fundamental data for establishment of desirable on-site quality control. Mock up test using repair mortar analyzed from angles of construction methods, mechanical spraying pressures, W/M. Construction methods were designed manpower method and spraying method, spraying pressures were designed 32, 42, 52 psi, W/M were designed 14.4, 15.4, $16.4\%$. And compressive strength, Chloride ion diffusion coefficient, bond strength, SEM. of mock up test specimens were evaluated. In conclusion, we confirmed excellency of mechanical spraying pressures, fined extremely excellency of condition of spraying pressure 42 ps, W/M $14.4\%$ within this study. therefore the results of this study will be useful to provide fundamental data for establishment of desirable on-site quality control.

  • PDF

Present and Future of Risk Management of Construction Practice in Asia

  • Watanabe, Tsunemi
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.4-5
    • /
    • 2015
  • Owning to rapid infrastructure development, Asia is experiencing dramatic economic growth. There are not a few cases in which, however, economic growth is achieved by increasing the external diseconomy. Pursuit of sustainable development is one of the most important issues for mankind. Under the post-industrial capitalism society, however, there seems a big risk of increase in the external diseconomy worldwide. The objectives of this manuscript are to discuss importance of risk management of construction practice in present and future. Regarding the latter, a particular attempt is made to discuss how project risk communication should be done to reduce the external diseconomy. Presently, one of the important issues in implementation of infrastructure projects is practice of risk management to properly manage time, cost, quality, and safety: mainly maximization of internal economy. Multi-party risk and uncertainty management process (MRUMP) is one of tolls to assist it. The idea on MRUMP can be used to reduce the external diseconomy through identifying, sharing, and tuning people's rhythms.

  • PDF

OFF-SITE MANUFACTURE OF APARTMENT BUILDINGS

  • Neville Boyd
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.304-310
    • /
    • 2011
  • The populations of major cities in Australia are increasing rapidly and facing an acute housing shortage. Traditional apartment procurement techniques involve lengthy lead-times and factory-based, or offsite manufactured (OSM) multi-storey apartment buildings may offer the opportunity to help fulfill the need by significantly reducing build times. Other advantages of OSM may include superior quality, low weight ratios, economies of scale achieved through repetition of prefabricated units, use on infill sites, sustainable design standards and better occupational health and safety. There are also positive labour and training implications, which may help to alleviate an industry-wide shortage of skills through use of semi-skilled labour. Previous uncertainties about the adoption of offsite due to the high capital costs and perception issues were generally based on pre-cast concrete structures, which are quite a different building type in terms of flexibility, construction, delivery and finishes. Identification of drivers and constraints assists in the determination of current industry status, allows for a benchmark to be established and future opportunities and directions for OSM to be determined.

  • PDF

아파트 브랜드 선호도 요인 비교에 관한 연구 -수도권지역과 시 단위지역 중심의 선호도 비교- (The Research on the Preference Factors of Apartment Brand)

  • 신한우;김대원;강경인;김광희
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.77-82
    • /
    • 2008
  • In the housing market, the construction company started to recognize the importance of the brand power since 1998. Many brand names of apartment construction company have newly formed and many apartments are representative of the brands of construction company by quality of apartment construction and service after hand apartment over to owner with many other elements of their brands. According to these trends in the housing market, it should be also interested in improving the value of brand name in apartment construction. The former researches have been achieved several topics in only a specific target market about the distinction of apartment's plan, the examination of preference, and the satisfaction survey of inhabitants etc. But construction company don't have developed any available marketing strategy according to construction location and regional characteristics. Nowadays, they should be interested in improving the value of apartment brand. Therefore, this research was conducted by interviewing and surveying preference factor, which factors are considered by consumer when consumers purchase apartment house, to compare the two regions such as Metropolis and Cities. The purpose of this research is to provide the preference trend of apartment house in the future to construction company by comparing consumer's preference examination.

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.

  • PDF