• Title/Summary/Keyword: a power plant

Search Result 5,714, Processing Time 0.036 seconds

Development of RCM Framework for Implementation on Safety Systems of Nuclear Power Plant

  • Kim, Tae-Woon;Brijendra Singh;Park, Chang K.;Chang, Tae-Whee;Song, Jin-Bae
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05b
    • /
    • pp.631-636
    • /
    • 1996
  • This paper presents a Reliability Centered Maintenance (RCM) framework for implementation on safety system of nuclear power plant (NPP). RCM is a systematic methodology to optimize the surveillance and maintenance tasks for critical components which provides efficiently and effectively reliability of system and safety of plant. Maintenance of the safety systems is essential for its safe and reliable operation. Reliability Centered Maintenance at NPP is the program which assure that plant system remains within original design criteria and that is not adversely affected during the plant life time. Aim of this paper is to provide the RCM framework to implement it on safety systems. RCM framework is described in four major steps.

  • PDF

A Study on Loss of Coolant Accident in Nuclear Power Plant Using DOE (실험계획법을 이용한 원자력 발전소에서의 냉각제 상실사고에 대한 연구)

  • Leem Young-Moon;Lee Sung-Mo
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.4
    • /
    • pp.85-99
    • /
    • 2005
  • The main objective of this paper is to search whether containment vessel's best pressure may increase until how long when loss of coolant accident (LOCA) happened in containment vessel of Ulchin nuclear power plant 1 and 2. Another goal of this research is to find the influential factors that increase containment vessel pressure. Model for this research is Ulchin nuclear power plant 1 with 10 cycles. Data were collected by simulator of Ulchin nuclear power plant 1 and design of experiment was used for data analysis. For the experiment, seven factors that are going to influence in containment vessel pressure were chosen. It was found that fatter which influences in early rise of containment vessel pressure after LOCA is only explosion size. Also, containment vessel's best pressure (3.74 bar.a) was much lower than limit (4.86 bar.a) of FSAR (Final Safety Analysis Report).

Reinforced-Concrete Works Productivity Analysis on Nuclear-Power-Plant Project

  • Lim, Jin-Ho;Huh, Young-Ki;Oh, Jae-Hun;Seo, Hyeon-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.600-601
    • /
    • 2015
  • Both the importance and process of estimating Nuclear-power plant construction time and cost have increased in significance as energy user costs themselves have become more significant. In estimating construction time, few parameters are more significant than work item production rates and factors significantly affecting the rates. A standardized data collection tool was used to acquire a total of 401 data points from a S Nuclear-power plant project, for selected critical works: form-work, rebar-work, and concrete-pouring. With the data, several hypothesized drivers of the man-hour production rates and crew-day production rates were also analyzed. Findings from this study will enable industry professionals to enhance accuracy of time and cost estimation for nuclear power plant construction.

  • PDF

Spatial Variation in Macrobenthic Communities Affected by the Thermal Discharge Volumes of a Nuclear Power Plant on the East Coast of Korea (원자력 발전소의 온배수 배출량 변화에 따른 대형저서동물 군집의 공간 변화)

  • Yu, Ok Hwan;Lee, Hyung-Gon;Lee, Jae-Hac;Kim, Kyung-Tae;Myung, Cheol-Soo;Moon, Hyung Tae;Byun, Ju Young
    • Ocean and Polar Research
    • /
    • v.35 no.4
    • /
    • pp.299-312
    • /
    • 2013
  • This study analyzed the species composition and density of a macrobenthic community according to variations in the thermal discharge volumes of a nuclear power plant before, during, and after the shutdown of the nuclear power plant during two periods. In this study, 369 macrobenthic fauna species were collected, and their mean density was 1,712 ind. $m^{-2}$. The number of species and diversity of macrobenthic fauna decreased with distance from the thermal discharge area, regardless of whether the nuclear plant shutdown or not. Many macrobenthic taxa appeared near the thermal discharge area, but polychaetes species were more prominent in outer areas than at the discharge area. The density of macrobenthic fauna decreased with distance from the thermal discharge area during a plant shutdown in the fall of 2011, but increased, except at two sites, near the discharge area in the winter of 2012. Cluster analysis indicated that the spatial distribution of the macrobenthic community changed in areas near the nuclear power plant after a shutdown period; that is, the station group I, in areas near the nuclear power plant, became narrower after the shutdown, but it recovered to previously occupied areas after the nuclear power plant began operating again. Opportunistic species, such as the polychaetes Lumbrineris longifolia (= Scoletoma longifolia) and Mediomastus californiensis, which were present in high densities near thermal discharge areas, decreased after the shutdown but recovered after the plant re-opened. The number of species and diversity of the macrofauna and the density of dominant species showed a significant correlation with temperature, except in winter periods. The results of this study revealed that changes in the amount of thermal discharge before and after the shutdown of a nuclear power plant could exert an influence on the structure of macrobenthic community within the thermal discharge areas depending on the season.

Development of Start·Stop Control System at Water Turbine Generator for Tidal Power Plant (조력발전소를 위한 수차발전기의 기동·정지 제어시스템 개발)

  • Cho, Byong-Og;Park, Chul-Won
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.106-112
    • /
    • 2014
  • Recently, tidal power generation has gained much attention. South Korea's tidal power generation systems were imported from abroad by turnkey type and have being operated. Therefore, for efficient operation and technological independence of a tidal power system, development of core technology is required. This paper deals with the start stop control system of water turbine generator in the tidal power plant, as one of our development project results. Using the SCADA system, the status and operations of water turbine generator in the tidal power plant, as well as simulation for calculation of maximum power were carried out. A small model type of start stop control device was also developed. In addition, the control system in Sihwa tidal power plant was modeled, and the results obtained by the dynamic simulation were given in graphics by 2D simulator.

Design of Structure of Heliostat Reflective Surface for 200kW Tower Type Solar Thermal Power Plant (200kW 탑형 태양열발전시스템을 위한 Heliostat 반사면 구조 설계)

  • Park, Young-Chil
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.2
    • /
    • pp.53-62
    • /
    • 2011
  • Heliostat in the tower type solar thermal power plant is a sun tracking mirror system to reflect the solar energy to the receiver and the optical performance of it affects to the efficiency of whole power plant most significantly. Thus a proper design of structure of the heliostat reflective surface could be the most important step in the construction of such power plant. The work presented here is a design of structure of optical surface of heliostat, which will be used in 200kW solar thermal power plant. The receiver located at 43(m) high from ground in tower has $2{\times}2$(m) rectangular shape. We first developed the software tool to simulate the energy concentration characteristics of heliostat using the ray tracing technique. Then, the shape of heliostat reflective surface is designed with the consideration of heliostat's energy concentration characteristics, production cost and productivity. The designed heliostat's reflective surface has a structure formed by canting four of $1{\times}1$(m) rectangular flat plate mirror facet and the center of each mirror facet is located on the spherical surface, where the spherical surface is formulated by the mirror facet mounting frame.

Leak Evaluation for Power Plant Valve Using Multi-Measuring Method

  • Lee, Sang-Guk;Park, Jong-Hyuck;Kim, Young-Bum
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.28 no.6
    • /
    • pp.469-476
    • /
    • 2008
  • Condition based maintenance(CBM) for the preventive diagnosis of important equipments related to safety or accident in power plant is essential by using the suitable methods based on actual power plant conditions. To improve the reliability and accuracy of the measured value at the minute leak situation, and also to monitor continuously internal leak condition of power plant valve, the development of a diagnosis and monitoring technique using multi-measuring method should be performed urgently. This study was conducted to estimate the feasibility of multi-measuring method using three different methods such as acoustic emission(AE) method, thermal image measurement and temperature difference$({\Delta}T)$ measurement that are applicable to internal leak diagnosis for the power plant valve. From the experimental results, it was suggested that the multi-measuring method could be an effective way to precisely diagnose and evaluate internal leak situation of valve.

Total management and support system for telecommunication power plant (통신용 전원 종합관리시스템)

  • Park, K.G.;Cho, I.K.;Min, B.R.;Park, B.J.;Ahn, C.H.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07g
    • /
    • pp.3169-3171
    • /
    • 1999
  • One of the important purposes o Telecommunications power plant operation is to supply safe power for maintaining the reliable communication services. Therefore, the power plant operation support system is generally used for efficient and maintenance of power plant without the increment of the operation and maintenance staffs. To operate and maintain a number of power plants efficiently, Korea Telecom developed centralized power plant monitoring and control system. In this paper, the system feature and main functions are described.

  • PDF

Penetration of Korean EPC Companies into International Market for Nuclear Power Plant (플랜트 EPC 기업의 해외 원자력 발전 프로젝트 진출방안)

  • Cho, Chan-Hyoung;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.66-73
    • /
    • 2009
  • This study aims to develop a strategy for South Korean companies to penetrate into the global NPP(nuclear power plant) market with their strength as the sixth biggest nuclear power generator in the world. With 20 nuclear plants in commercial operation and 6 more in construction, South Korea has the best technology in construction and operation of NPP. Despite these capabilities as demonstrated on its domestic market, Korean companies' constraint to enter and play a key role in global NPP market would be the lack of experience in overseas NPP projects, original technologies, and diplomatic effectiveness. This study analyzes the competitiveness of Korean standardized nuclear power plant, construction management skills, construction technologies, manufacturing equipment and materials and operation skills. In this research the current status of existing NPP and the forecast of building NPP according to countries was analyzed in order to work out strategies with technology, cost-effectiveness, and diplomatic consideration.

  • PDF

Analysis of a network for control systems in nuclear power plants and a case study (원자력 발전소 제어계통을 위한 네트워크의 해석과 사례 연구)

  • Lee, Sung-Woo;Yim, Han-Suck
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.5 no.6
    • /
    • pp.734-743
    • /
    • 1999
  • In this paper, a real-time communication method using a PICNET-NP(Plant instrumentation and Control Network for Nuclear Power plant) is proposed with an analysis of the control network requirements of DCS(Distributed Control System) in nuclear power plants. The method satisfies deadline in case of worst data traffics by considering aperiodic and periodic real-time data and others. In addition, the method was used to analyze the data characteristics of the DCS in existing nuclear power plant. The result shows that use of this method meets the response time requirement(100ms).

  • PDF