• Title/Summary/Keyword: a feasibility

Search Result 10,353, Processing Time 0.038 seconds

A Case Study on the Cost-Effectiveness Analysis for the Feasibility Study of Public Project Related to Personal Information Protection (개인정보보호 관련 공공사업의 타당성 조사를 위한 비용효과분석 사례 연구)

  • Jo, Illhyung;Kim, Jin;Yoo, Jinho
    • Knowledge Management Research
    • /
    • v.20 no.3
    • /
    • pp.91-106
    • /
    • 2019
  • In the era of the 4th Industrial Revolution, the importance of information protection is increasing day by day with the advent of the 'hyper-connection society', and related government financial investment is also increasing. The source of the government's fiscal investment projects is taxpayers' money. Therefore, the government needs to evaluate the effectiveness and feasibility of the project by comparing the public benefits created by the financial investment projects with the costs required for it. At present, preliminary feasibility study system which evaluates the feasibility of government financial investment projects in Korea has been implemented since 1994, but most of them have been actively carried out only in some fields such as large SOC projects. In this study, we discuss the feasibility evaluation of public projects for the purpose of information security. we introduce the case study of the personal information protection program of Korean public institutions and propose a cost-effectiveness analysis method that can be applied to the feasibility study of the information protection field. Finally, we presented the feasibility study and criteria applicable in the field of information security.

Making Practical Use of Urban MAGLEV System : How to Perform the Feasibility Study (도시형 자기부상열차 실용화사업 타당성조사 추진방안)

  • Kim, Yeon-Gu;Kim, Hun
    • Proceedings of the KSR Conference
    • /
    • 2006.05a
    • /
    • pp.34-45
    • /
    • 2006
  • Making practical use of urban MAGLEV system which is tried by government includes technique development and railway construction. Because huge amount of money will be spent on this project, feasibility study is being carried out in order to check the feasibility and to devise the master plan in prior to making practical use of urban MAGLEV system. The key issues of feasibility study are possibility of technique development, economical feasibility, location of a model railway and the improvement of related laws and regulations. This paper shows the approach to solve these key issues.

  • PDF

A Study on Feasibility Analysis and Alternatives for Infrared Detector Development (적외선 검출기 개발가능성 및 대안 분석 연구)

  • Kim, Gyeong-Su;Min, Seong-Gi;Kim, Cheol-Hwan
    • 시스템엔지니어링워크숍
    • /
    • s.4
    • /
    • pp.123-134
    • /
    • 2004
  • This paper deals with the feasibility analysis and alternatives for infrared detector development. The purpose of this paper analyze development requirement and feasibility study in both technology and cost. We get raw input data for system engineering process from development and technical expert, and then analyze cost and technology for development feasibility, and alternative study. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 to 2008 year. Technical level is analyzed by TRL(Technical Readiness Level) and AOA(Analysis of Alternative) is done by development and production cost estimate. We use SEER-H tool for cost estimate, that is parametric cost estimate tool based on Knowledge Base. Also this paper presents risk analysis for project management because it is necessary to risk driver management during the infrared detector development. The result of IR Detector feasibility and alternative study will be used in technical and cost analysis. This study can help those who are related to the cost analysis and development feasibility of other weapons

  • PDF

A Study on Feasibility Analysis of Sewer Rehabilitation (하수관거 정비사업의 타당성 분석에 관한 연구)

  • Han, Ihnsup;Chang, Daehwan;Woo, Byungha;Lim, Chulhwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.1
    • /
    • pp.89-96
    • /
    • 2009
  • Feasibility which is complimented before Social Overhead Capital Project and National Policy Project is analyzed by economic and political benefits. The projects will be performed if the benefits are bigger than the project cost. In this study, feasibility was examined at various viewpoints on sewer rehabilitation projects implemented with private capitals. To achieve the feasibility analysis, the B/C (Benefit/Cost Ratio), IRR (Internal Rate of Return) and the returns ratio of the Build Transfer Lease project implemented in 2007 at W city were estimated. At the same time, the correlation with B/C and benefit sensitivity of concessionary rate fluctuation were analyzed to evaluate the efficiency and feasibility of the seven sewer rehabilitation projects promoted by a local autonomous entity.

A Model Feasibility Analysis of Commerce Building (상업건축물의 사업타당성 분석 모형 구축)

  • Kook, Dong-Hoon;Son, Ki-Young;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.7 no.3
    • /
    • pp.71-79
    • /
    • 2007
  • The starting point of successful building production process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The government institutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.

Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project (대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 -)

  • Choi, Mi-Hee
    • Journal of Environmental Impact Assessment
    • /
    • v.11 no.2
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.

A financial feasibility analysis of architectural development projects that use probabilistic simulation analysis method (확률론적 시뮬레이션 분석방법을 적용한 건축개발사업의 재무적 타당성 분석)

  • Lee, Seong-Soo;Choi, Hee-Bok;Kang, Kyung-In
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.76-86
    • /
    • 2007
  • Construction development work invents profit as those finalize object, and a make or break success of project depends on correct analysis and forecast business feasibility at project early. Business feasibility study would be decision-making under precarious situation because is connoting uncertainty that is future. estimate at present visual point essentially. Under uncertainty, a decision-making method is based on probability theory of statistics, but business feasibility study had applied with not feasibility study by probabilistic decision method but it by determinism derision method so far. Therefore in this study doing decision-making by a probability theory method for successful project at early business feasibility study, it present a probabilistic study method that use simulation that can supply a little more correct and reliable data to decision-maker As result, a probabilistic study method is more suitable than deterministic study method as technique for a financial feasibility study of construction development work. Making good use of this probabilistic study method at important business or careful decision-making, because efficient Judgment that is based accuracy and authoritativeness may become available.

A Feasibility Analysis of Location-Based Service Systems Applying Petri net (페트리 넷을 적용한 위치기반 서비스 시스템의 타당성 분석)

  • Yim Jae-Geol;Joo Jae-Hun;Nam Yoon-Suk
    • Journal of Information Technology Applications and Management
    • /
    • v.12 no.1
    • /
    • pp.157-172
    • /
    • 2005
  • Recently, location-based service (LBS) is a hot issue in the field of computer applications. So many papers introducing new techniques of implementing a LBS and new application fields of LBS have been published recently. However, to the best of our knowledge, none of them discusses feasibility test in the prior to the implementation. The importance of a feasibility test for a design prior to the implementation cannot be overemphasized. This paper presents a method of feasibility test for a LBS design. Our method performs three steps. At the first step, we build a Petri net model of the LBS system which is depicted in natural language. The second step is to analyse the Petri net to find errors and flaws in the design. We also improve the Petri net model by fixing the errors and flaws in this step. A feasibility test is the third and final step. In this step. we verify if the design satisfies the user's requirement in the senses of quality of service (QoS) and of minimizing the implementation cost. The third step is performed in the manner of mathematical analysis of the Petri net.

  • PDF

Improvement of Total Floor Area Planning for the Feasibility Study on the Establishment of a General Hospital - Focused on Pre-feasibility Study of KDI Case Analysis (종합병원 건립 타당성 조사의 연면적 계획 개선방안 - 공공의료기관 재정사업 예비타당성조사 사례를 중심으로)

  • Cho, Junyoung
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.30 no.1
    • /
    • pp.37-44
    • /
    • 2024
  • Purpose: The planning of medical facilities involves formulating a comprehensive medical basic plan, translating it into spatial dimensions through a space program. Feasibility assessment often relies on empirical methods like floor area per bed. However, with the shift towards specialized medical concepts, proportional scaling to bed numbers is challenging. This study proposes scale planning improvements during the feasibility assessment stage for comprehensive hospitals, analyzing cases using area determination factors and standard areas based on medical resources. Methods: The Korean Development Institute's Public Investment Management Center (KDI) identified issues in the scale determination of medical facilities in the Preliminary Feasibility Study Guidelines and investigated alternative approaches for determining the scale of a case that passed the preliminary feasibility study in 2019. The study assessed the feasibility of applying individual factors to determine not only the number of beds but also the scale at the sector and department levels. Additionally, a statistical analysis was conducted to examine the correlation between the total number of beds and various area determination factors. Results: Results suggest a strong correlation between total beds and major equipment needs, but in hospitals with <500 beds, this correlation weakens. Ward section scale is better calculated per ward type, not just total beds. Outpatient department scale depends on specialists, influencing treatment room numbers. Medical personnel play a crucial role in determining the scale of sections like rehabilitation therapy rooms, operating rooms, dialysis rooms, and overall facility scale.

An Analysis of BcN Feasibility of Area of Agricultural and Fishing Village (농어촌지역 BcN 기반구축 사업타당성 분석)

  • Jeong, Woo-Soo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.6B
    • /
    • pp.440-449
    • /
    • 2008
  • This paper is to analyze the feasibility of area of agricultural and fishing village as the link of the broadband convergence network(BcN) build-up. For the project feasibility analysis, we utilized the questionnaire of experts and drew the new index of evaluation. By using the AHP technique, we evaluated the feasibility. And by reviewing precedent papers and references, it drew proper evaluation criteria and evaluated BcN feasibility using AHP; economic feasibility, technological feasibility and policy feasibility were figured out as main criteria and resulted evaluation criteria for BcN feasibility. As a result, we found the business enforcement was exposed to be apposite and inconsistency index showing the reliability of the analysis was showed up lowly as 0.0566. Afterward, the BcN business of construction contribute to the living improvement of a nation. Moreover, there will be a value as the basic materials for reasonably propelling the BcN project.