Analysis of a Long Volumetric Module Lift Using Single and Multiple Cranes

  • Khodabandelu, Ali;Park, JeeWoong;Choi, Jin Ouk;Sanei, Mahsa
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.563-570
    • /
    • 2022
  • Industrialized and modular construction is a growing construction technique that can transfer a large portion of the construction process to off-site fabrication yards. This method of construction often involves the fabrication, pre-assembly, and transportation of massive and long volumetric modules. The module weight keeps increasing as the modules become more complete (with infill) to minimize the work at the site and, as higher productivity can be achieved at the fabrication shop. Thus, a volumetric module delivery gets more challenging and risky. Despite its importance, past research paid relatively insufficient attention to the problem related to the lifting of heavy modules. This can be a complex and time-consuming problem with multiple lifting for transportation-and-installation operations both in fabrication yard and jobsite, and require complex crane operations (sometimes, more than one crane) due to crane load capacity and load balance/stability. This study investigates this problem by focusing on the structural perspective of lifting such long volumetric modules through simulation studies. Various scenarios of lifting a weighty module from the top using four lifting cables attached to crane hooks (either a single crane or double crane) are simulated in SAP software. The simulations account for various factors pertaining to structural indices, e.g., bending stress and deflection, to identify a proper method of module lifting from a structural point of view. The method can identify differences in structural indices allowing identification of structural efficiency and safety levels during lifting, which further allows the selection of the number of cranes and location of lifting points.

  • PDF

Optimization of Dispatching Strategies for Stacking Cranes Including Remarshaling Jobs (재정돈을 포함한 장치장 크레인의 작업 할당 전략 최적화)

  • Kim, Taekwang;Yang, Youngjee;Bae, Aekyoung;Ryu, Kwang Ryul
    • Journal of Navigation and Port Research
    • /
    • v.38 no.2
    • /
    • pp.155-162
    • /
    • 2014
  • In container terminals, stacking yard is the place where import and export containers are temporarily stored before being loaded onto or after being discharged from a ship. Since all the containers go through the stacking yard in their logistic flow, the productivity of the terminal critically depends on efficient operation of stacking yard, which again depends on how well the stacking locations of the incoming containers are determined. However, a good location for stacking an incoming container later can turn out to be a bad one when that container is to be fetched out of the stacking yard, especially if some rehandling is required. This means that good locations for the containers are changing over time. Therefore, in most container terminals, the so-called remarshaling is done to move the containers from bad location to good locations. Although there are many previous works on remarshaling, they all assume that the remarshaling can be done separately from the main jobs when the cranes are idle for rather a long period of time. However, in reality, cranes are hardly available for a period long enough for remarshaling. This paper proposes a crane dispatching strategy that allows remarshaling jobs to be mixed together with the main jobs whenever an opportunity is detected. Experimental results by simulation reveals that the proposed method effectively contributes to the improvement of terminal productivity.

Quay Crane Scheduling Considering the Workload of Yard Blocks in an Automated Container Terminal (장치장 블록의 작업부하를 고려한 안벽크레인 작업계획)

  • Lee, Seung-Hwan;Choe, Ri;Park, Tae-Jin;Kim, Kap-Hwan;Ryu, Kwang-Ryel
    • Journal of Intelligence and Information Systems
    • /
    • v.14 no.4
    • /
    • pp.103-116
    • /
    • 2008
  • This paper proposes quay crane (QC) scheduling algorithms that determine the working sequence of QCs over ship bays in a container vessel in automated container terminals. We propose two scheduling algorithms that examine the distribution of export containers in the stacking yard and determine the sequence of ship bays to balance the workload distribution among the yard blocks. One of the algorithms is a simple heuristic algorithm which dynamically selects the next ship bay based on the entropy of workloads among yard blocks whenever a QC finishes loading containers at a ship bay and the other uses genetic algorithm to search the optimal sequence of ship bays. To evaluate the fitness of each chromosome in the genetic algorithm, we have devised a method that is able to calculate an approximation of loading time of container vessels considering the workloads among yard blocks. Simulation experiments have been carried out to compare the efficiency of the proposed algorithms. The results show that our QC scheduling algorithms are efficient in reducing the turn-around time of container vessels.

  • PDF

A Comparative Study on Productivity of High Performance Quay Crane in Container Terminal (고성능 안벽크레인의 터미널 하역 생산성 비교분석)

  • Ha Tae-Young;Choi Yong-Seok
    • Journal of Navigation and Port Research
    • /
    • v.29 no.6 s.102
    • /
    • pp.547-553
    • /
    • 2005
  • The purpose of this paper is to evaluate the quay crane productivity in automated container terminal with perpendicular yard layout. In particular, four quay crane (single trolley/dual trolley/double trolley/supertainer) are considered to evaluate the productivity on the terminal performance. Each quay crane load or unload containers by a different process. For each quay crane, two productivities are considered and compared: mechanical productivity, net productivity. As the net productivity of quay crane is significant, in this paper, an application of simulation model to simulate automated container terminal is developed and a wide variety of computational experiments were conducted.

Steel Plate Girder Railway Bridge Ballast System using Rail Transfer Method(III) (선로이송 가설공법을 적용한 철도판형교 유도상화(III))

  • Min, Ji-Hong;Jang, Jun-Hyun;Kim, Jin-Yong;Woo, Yong-Keun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1569-1576
    • /
    • 2011
  • To install heavy structures in the railway bridges, crane methods or launching methods using temporary structure have been applied. These methods are uneconomical because working yard is required, temporary cut of rail system, etc. In this study, various construction methods has been developed which are suitable to the filed conditions. In the case of simple span structure like plate girder bridges, the girder is loaded to troy system at the working yard and then transferred to the working place. To lift and lower the girder system, a new transfer system was developed. Different methods each for simple span bridge girder and long span girder were developed and detailed work procedures were proposed. Using these methods, the heavy structures can be installed with simple and safe work procedures and the construction cost and duration can be reduced.

  • PDF

Recent Trend of Block Division in Shipbuilding (최근의 Block Division 경향)

  • Ahn Hyo Sang
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2005.06a
    • /
    • pp.165-170
    • /
    • 2005
  • The weight of a ship depends on the size of the ship. Normal lightweight of a ship is over 10,000 tons. So it is inevitable to divide a ship into about more than hundreds of lumps. Each of lumps is called as a block in shipbuilding. The sizes of blocks are decided by a yard's facilities. Among them lifting cranes are most decisive facilities. By block's size the productivity of a yard is decided very much. So it is very important to have a proper block division during shipbuilding. This paper refers to the recent trend of block division among yards. This paper would give an idea how to decide boundaries of blocks. Block division also decides both quality of a ship and work volume of it. These days the block erection method is changed dramatically due to use sea barge mounted crane for erection of a grand ring block. This paper explains the new trend of block division in shipbuilding.

  • PDF

A Simulation Study for Equipment Scale and Hanoling Capacity of Container Terminal (컨테이너 터미널의 장비규모 및 처리능력에 대한 시뮬레이션 연구)

  • 윤원영;최용석
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.177-185
    • /
    • 1999
  • This paper deals with the case study that determine the best equipment scale to be satisfied a handing capacity of the container terminal using computer simulation techniques. The objective of this study is to suggest an operation alternative of equipment scale including container canes, transfer cranes, and yard tractors which reflects a container throughput. For the simulation, the object-oriented simulator with the special purpose of container terminal analysis is used. And the used simulator was developed to simulate the transfer crane based container terminal for yard equipment. Using the simulator, we test an existing port container terminal, PECT(Pusan East Container Terminal).

An Approach for Scheduling Problem in Port Container Terminals: Moving and Stacking

  • HA, Phuoc Lan;LE, Ba Toan;HUYNH, Tuong Nguyen;NGUYEN, An Khuong;NGUYEN, Van Minh Man
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.7 no.1
    • /
    • pp.1-5
    • /
    • 2015
  • In this study, we consider the transportation problem in port container terminals. It aims to determine positions in yards to place the containers at the adequate times. The containers on ship must be unloaded one by one from top to bottom, and placed in the main yard in order to reduce additional cost required for unnecessary unloading when getting out by customer with given timetable. The cost for transportation at container terminals could be reduced by a new approach in scheduling: move the containers from ship and stack them onto main yard that minimizes cost of yard crane operation when unloading for customer.

Cranes(Grus japonensis) Adopted as a Traditional Factor in Landscaping and Gardening Culture (전통조경요소로써 도입된 학(鶴)과 원림문화)

  • Kim, Hai-Gyoung;So, Hyun-Su
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.30 no.3
    • /
    • pp.57-67
    • /
    • 2012
  • This study draws the following conclusions about the nature garden culture with crane that is a dynamic landscaping factor introduced into nature garden by analyzing the literatures on cranes written and landscapes painted in Chosun Dynasty. First, crane symbolizes such Buddhist, Taoist and Confucius media as appearance of Buddha, desire for Taoist hermit world and long life, and a solitary's life of proud loneliness. It has been recorded that crane was raised from the Three Nations Era till the Japanese occupation and Confucius scholars in Chosun Dynasty opened shows concerning crane or formed literature groups enjoying poems of it, and often using crane as their denial of going into government service. Second, in order to introduce crane to nature garden, people caught wild crane and made a fence and some kind of pond for their growth. In addition, crane was strictly managed by appointed slaves and they trained crane for dancing and then tended to allow a crane to play on the yard in terms of abstract meaning or got two cranes free in consideration of their ecology. Third, for more appreciation of crane and the expression of some symbolism matching for it, both plum and pine, which mean a solitary's life and long life respectively, were planted in nature garden. And, Confucius scholars in Chosun Dynasty also enjoyed their refined tastes with appreciation, napping, reading and playing the harp, accompanied by crane. As aforementioned, Confucius scholars in Chosun Dynasty did not only draw the meaning symbolized by cranes and write poems about such symbolic meaning, but also positively introduce crane into nature garden as a dynamic landscaping factor, so that they enjoyed synesthetic senses including looks, motions and sounds of cranes for their refined tastes.

An Automatic Travel Control of a Container Crane using Neural Network Predictive PID Control Technique

  • Suh Jin-Ho;Lee Jin-Woo;Lee Young-Jin;Lee Kwon-Soon
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.7 no.1
    • /
    • pp.35-41
    • /
    • 2006
  • In this paper, we develop anti-sway control in proposed techniques for an ATC system. The developed algorithm is to build the optimal path of container motion and to calculate an anti-collision path for collision avoidance in its movement to the finial coordinate. Moreover, in order to show the effectiveness in this research, we compared NNP PID controller to be tuning parameters of controller using NN with 2-DOF PID controller. The experimental results jar an ATC simulator show that the proposed control scheme guarantees performances, trolley position, sway angle, and settling time in NNP PID controller than other controller. As a result, the application of NNP PID controller is analyzed to have robustness about disturbance which is wind of fixed pattern in the yard.