• 제목/요약/키워드: Yard

검색결과 736건 처리시간 0.031초

강재 통합 관리 시스템 개발 (A Development of an Integrated Inventory Managing System for Steel-Plates)

  • 이석현;유지헌;김현철;장석민;임래수;김호경;허주호
    • 대한조선학회논문집
    • /
    • 제51권2호
    • /
    • pp.130-137
    • /
    • 2014
  • As one of the largest shipbuilding company in the world, STX Offshore & Shipbuilding currently developed an inventory managing system for steel-plates, which is applied to their steel stock yard. In a traditional way to manage steel yard, almost every work has been done by manually. The manual steel-plate piling process caused some problems such as process delay due to piling errors and the uncertainty of work plan due to lack of information. To solve these problems, we developed an integrated inventory managing system based on real-time crane tracking system which automatically updates steel-plates' piling status. We built the integrated steel-plate database, developed several programs including steel-plate input program, real-time steel-plate monitoring program and steel-yard management program, and constructed hardware system for tracking magnetic cranes. As a result, a supervisor of steel-yard can manage the inventory of steel-plates efficiently and furthermore plan an efficient piling schedule and crane working schedule.

부유체식 Container Yard에 관한 연구 (A Study on the Container Yard of Mega-Float Offshore Structure Type.)

  • 박성현;박석주;고재용
    • 한국항해항만학회지
    • /
    • 제27권1호
    • /
    • pp.49-54
    • /
    • 2003
  • 우리나라가 세계 물류기지의 중심 국으로 발전하기 위해서는 날로 급증하고 있는 물류량을 처리하기 위한 항만의 건성이 시급한 과제이다. 국토가 좁고 대도기에 인구가 급증하고 있으나 삼면이 바라도 둘러 쌓여 잇는 우리나라의 경우에는 해양공간개발이 필요하다. 증가하는 물류량은 처리할 수 있는 항만의 건설을 위하여 본 연구에서는 초대형 부유채식 컨테이너 야드를 제안하고 해상에 설치되는 초대형 부유채식 컨테이너 야드가 파의 길이 , 해역의 수심, 입사하는 파의 방향등에 따라서 어떠한 응답특성을 나타내는지 파악한다.

컨테이너 터미날에서의 유전자 해법을 이용한 적하계획법 (Load Scheduling Using a Genetic Algorithm in Port Container Terminals)

  • 김갑환;김기영;고창성
    • 대한산업공학회지
    • /
    • 제23권4호
    • /
    • pp.645-660
    • /
    • 1997
  • An application of the genetic algorithm(GA) to the loading sequencing problem in port container terminals is presented in this paper. The efficiency of loading operations in port container terminals is highly dependent on the loading sequence of export containers. In order to sequence the loading operation, we hove to determine the route of each container handling equipment (transfer crane or straddle carried in the yard during the loading operation. The route of a container handling equipment is determined in a way of minimizing the total container handling time. An encoding method is developed which keeps intermediate solutions feasible and speeds up the evolution process. We determine the sequence of each individual container which the container handling equipment picks up at each yard-bay as well as the visiting sequence of yard-bays of the equipment during the loading operation. A numerical experiment is carried out to evaluate the performance of the algorithm developed.

  • PDF

자동화 컨테이너 터미널용 Anti-Sway 시스템 (Anti-sway System for Automatic Container Terminal)

  • 박경택;박찬훈;김두형
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2002년도 춘계학술대회 논문집
    • /
    • pp.428-431
    • /
    • 2002
  • Yard cranes are very useful equipments for handling of heavy containers. But rope-driven yard cranes must have a little of sway and skew motion because ropes are passive mechanical device. So many researches have been concentrated on anti-sway algorithm controlling trolley speed. But control algorithm of trolley speed is not practical in windy weather. In this paper, we are going to propose a new structure for anti-sway. This structure uses aux. ropes. The control strategy with auxiliary rope is very useful to sway control of yard crane because rope length is shorter than quay-side container cranes. In this paper, we derive equations of motion of trolley system which have anti-sway controller to use auxiliary rope. And main schemes are introduced and explained briefly.

  • PDF

반자동화 컨테이너터미널의 RMGC 운영방식 비교 분석 (A Study of Comparison with the Operating Priority Rules of RMGC on Semi-Automated Container Terminal)

  • 김찬호;하태영;양홍석
    • 한국경영과학회지
    • /
    • 제35권2호
    • /
    • pp.1-17
    • /
    • 2010
  • This paper aims to compare four operating priority rules of RMGC (Rail Mounted Gantry Crane) used in semi-automated container terminal. The four priority rules employed in this paper are FCFS (First-come-first-served), LCFS (Last-come-first-served), TOS (Turn-over-served) and NFS (Nearest-first-served). And to compare the four operating priority rules, this paper analyzed productivity of RMGC and CC (Container Crane), waiting time of YT (Yard Truck) and RT (Road Truck) in container yard, and turnaround time of RT in container terminal of each priority rule by using stevedoring simulation. As a result, NFS was evaluated as the best rule to improve the overall productivity of container terminal in terms of all criteria.

시뮬레이션을 이용한 자동화 컨테이너터미널의 결합 생산성 분석 (Analysis of Combined Productivity at Automated Container Terminal Using Simulation)

  • 하태영;최용석
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2004년도 춘계공동학술대회 논문집
    • /
    • pp.656-659
    • /
    • 2004
  • The objective of this paper is to analyze the combined productivity at automated container terminal. We present a simulation model for transport vehicle that perform the container transportation between apron and yard with a perpendicular yard layout. Usually, the efficiency of container terminal is evaluated by productivity of container cranes at apron, and though there are enough support of transport vehicles and yard cranes, can improve the productivity of container cranes. Especially, transport vehicle is very important factor in productivity of container cranes and has variable work productivity according to loading and unloading situation. Therefore, a method that can estimate combined productivity of equipment is required. We performed various simulation experiment and analyzed combined productivity to estimate the required number of equipment.

  • PDF

표면반응법을 이용한 자동화 컨테이너 터미널의 버퍼 장치장에서의 장비 규모 결정 (Determination of Fleet Size of Equipment in Buffer Yard of an Automated Container Terminal by using a Response Surface Methodology)

  • 배종욱;양창호;김갑환
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2000년도 추계학술대회논문집
    • /
    • pp.121-129
    • /
    • 2000
  • In this paper, we discuss how to operate a buffer yard in an automated container terminal, which will be used for resolving the difficulties to which the interaction between external manned trucks and internal unmanned equipment led. The determination of fleet size of material handling equipment is an important issue in designing of buffer yard in automated container terminals. This research also addresses the issue of determining buffer capacities through simulation. By using response surface methodology (RSM) for efficient experimentation, the optimal combination of design parameters under applicable operational strategies is obtained.

  • PDF

회전 Laser 슬릿 빔을 이용한 AGV의 위치 및 자세의 검출 (Detection of AGV's position and orientation using laser slit beam)

  • 박건국;김선호;박경택;안중환
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2000년도 추계학술대회논문집
    • /
    • pp.219-225
    • /
    • 2000
  • The major movement block of the containers have range between apron and designation points on yard in container terminal. The yard tractor operated by human takes charge of its movement in conventional container terminal. In automated container terminal, AGV(Automated Guided Vehicle) has charge of the yard tractor's role and the navigation path is ordered from upper level control system. The automated container terminal facilities must have the docking system to guide landing line to have high speed travelling and precision positioning. The general method for docking system uses the vision system with CCD camera, infra red, and laser. This paper describes the detection of AGV's position and orientation using laser slit beam to develop docking system.

  • PDF

시간가치를 고려한 자동화 컨테이너 터미널의 수출 컨테이너 이적계획 (Export Container Remarshaling Planning in Automated Container Terminals Considering Time Value)

  • 배종욱;박영만;김갑환
    • 한국경영과학회지
    • /
    • 제33권2호
    • /
    • pp.75-86
    • /
    • 2008
  • A remarshalling is one of the operational strategies considered importantly at a port container terminal for the fast ship operations and heighten efficiency of slacking yard. The remarshalling rearranges the containers scattered at a yard block in order to reduce the transfer time and the rehandling time of container handling equipments. This Paper deals with the rearrangement problem, which decides to where containers are transported considering time value of each operations. We propose the mixed integer programming model minimizing the weighted total operation cost. This model is a NP-hard problem. Therefore we develope the heuristic algorithm for rearrangement problem to real world adaption. We compare the heuristic algorithm with the optimum model in terms of the computation times and total cost. For the sensitivity analysis of configuration of storage and cost weight, a variety of scenarios are experimented.

합천수력 154kV 옥외변전소 낙뢰대책 및 접지보강 연구 (A Study on the Lightning Protection and Earthing Supplement for 154kV Switch yard of Hapchon Hydro-Power Station)

  • 남궁혁;전규남;옥광석;최형철;이남형;장정호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.83_84
    • /
    • 2009
  • The Gas Circuit Breaker for the Main Transformer in switch yard at the 1st Hapcheon hydraulic power station, has broken down by direct lightning stroke and induced stroke. so, this paper present the stable operation of equipment in switch yard through the improvement of earthing system and the protection to the lightning

  • PDF