• Title/Summary/Keyword: X chart

Search Result 208, Processing Time 0.028 seconds

A Study on the Methods for make sure of the Product Reliability (제품의 제조신뢰성 확보 방법론 연구)

  • Lee Jong-Beom;Cho Jai-Rip
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.147-155
    • /
    • 2005
  • When a failure or fault is detected, the product is adjusted or design change and is returned to its original condition before the failure or fault. Continuous improvement of the FMEA system is to determine an optimum product reliability that minimizes the total cost per unit time associated with inspection, repair, and the nondetection cost.

  • PDF

3차원 웹 가시화 서비스를 활용한 S-10X 데이터 서비스 구현 및 활용에 관한 연구

  • Kim, Lee-Seul;Kim, Jae-Myeong;Kim, Ji-Yun;Choe, Yun-Su
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.05a
    • /
    • pp.106-107
    • /
    • 2018
  • WEBGL 등 실시간 3차원 웹 서비스를 S-10X 데이터 서비스 구현에 활용함으로써 보다 폭넓은 항해정보의 공유방안을 생각하고 실제 플랫폼에 데이터를 시각화함으로써 S-10X 데이터에 활용서비스 모델을 구축하고자 한다. 이를 위하여 CESUIM 같은 오픈소스 프로젝트를 이용함으로써 데이터 시각화 및 구축 이용에 도움을 주고자 한다.

  • PDF

An Economic Design of the Chart with Variable Sample Size Scheme

  • Park, Chang-Soon;Ji, Seon-Su
    • Journal of the Korean Statistical Society
    • /
    • v.23 no.2
    • /
    • pp.403-420
    • /
    • 1994
  • An economic design of the $\bar{X}-R$ chart using variable sample size (VSS) scheme is proposed in this paper. In this design the sample size at each sampling time changes according to the values of the previous two sample statistics, sample mean and range. The VSS scheme uses large sample if the sample statistics appear near inside the control limits and smaller sample otherwise. The set of process parameters, such as the sampling interval, control limits and the sample sizes, are chosen to minimize the expected cost per hour. The efficiency of the VSS scheme is compared to the fixed sample size one for cases where there is multiple of assignable causes. Percent reductions of the expected cost in the VSS design are calculated for some given sets of cost parameters. It is shown that the VSS scheme improves the confidence of the procedure and performs statistically better in terms of the number of false alarms and the average time to signal, respectively.

  • PDF

New Attributes and Variables Control Charts under Repetitive Sampling

  • Aslam, Muhammad;Azam, Muhammad;Jun, Chi-Hyuck
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.1
    • /
    • pp.101-106
    • /
    • 2014
  • New control charts under repetitive sampling are proposed, which can be used for variables and attributes quality characteristics. The proposed control charts have inner and outer control limits so that repetitive sampling may be needed if the plotted statistic falls between the two limits. Particularly, the new np and variable X-bar control charts under repetitive sampling are considered in detail. The in-control and out-of-control average run lengths are analyzed according to various process shifts. The performance of the proposed control charts is compared with the existing np and the X-bar control charts in terms of the average run lengths.

SUPPLEMENTARY ANALYSES OF ECONOMIC X CHART MODEL

  • Jeon,Tae Bo
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.12 no.1
    • /
    • pp.111-111
    • /
    • 1987
  • With the increasing interest of reducing process variation, statistical process control has served the pivotal tool in most industrial quality programs. In this study, system analyses have been performed associated with a cost incorporated version of a process control, a quadratic loss-based X over bar control chart model. Specifically, two issues, the capital/research investments for improvement of a system and the precision of a parameter estimation, have been addressed and discussed. Through the analysis of experimental results, we show that process variability is seen to be one of the most important sources of loss and quality improvement efforts should be directed to reduce this variability. We further derive the results that, even if the optimal designs may be sensitive, the model appears to be robust with regard to misspecification of parameters. The approach and discussion taken in this study provide a meaningful guide for proper process control. We conclude this study with providing general comments.

Supplementary analyses of economic X over bar chart model

  • Jeon, Tae-Bo
    • Korean Management Science Review
    • /
    • v.12 no.1
    • /
    • pp.111-124
    • /
    • 1995
  • With the increasing interest of reducing process variation, statistical process control has served the pivotal tool in most industrial quality programs. In this study, system analyses have been performed associated with a cost incorporated version of a process control, a quadratic loss-based X over bar control chart model. Specifically, two issues, the capital/research investments for improvement of a system and the precision of a parameter estimation, have been addressed and discussed. Through the analysis of experimental results, we show that process variability is seen to be one of the most important sources of loss and quality improvement efforts should be directed to reduce this variability. We further derive the results that, even if the optimal designs may be sensitive, the model appears to be robust with regard to misspecification of parameters. The approach and discussion taken in this study provide a meaningful guide for proper process control. We conclude this study with providing general comments.

  • PDF

The Effect of Estimated Control Limits

  • JaiWook Baik;TaiYon Won
    • Communications for Statistical Applications and Methods
    • /
    • v.5 no.3
    • /
    • pp.645-657
    • /
    • 1998
  • During the start-up of a process or in a job-shop environment conventional use of control charts may lead to erroneous results due to the limited number of subgroups used for the construction of control limits. This article considers the effect of using estimated control limits based on a limited number of subgroups. Especially we investigate the performance of $\overline{X}$ and R control charts when the data are independent, and X control chart when the data are serially correlated in terms of average run length(ARL) and standard deviation run length(SDRL) using simulation. It is found that the ARL and SDRL get larger as the number of subgroups used for the construction of the chart becomes smaller.

  • PDF

Review and Suggestions of Models for Measurement System Analysis (측정 시스템 분석 모형의 고찰 및 새로운 모형의 제안)

  • Choi, Sung-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.1
    • /
    • pp.191-195
    • /
    • 2008
  • The present study contributes reviewing and suggesting various models for measurement system analysis (MSA). Measurement errors consist of accuracy, linearity, stability, part precision, repeatability and reproducibility (R&R). First, the major content presents split-plot design, and the combination method of crossed and nested design for obtaining gage R&R. Second, we propose $\bar{x}-s$ variable control chart for calculating the gage R&R and number of distinct category. Lastly, investigating the determination of gage performance curve which establishes the control specification propagating calibration uncertainties and measurement errors is described.

A Study Short Run Production Cusum Individual X Chart & Moving Range Chart (단납기 생산체계의 누계치 관리도와 유동성 관리도에 관한 연구)

  • Kim Je-Hong
    • Journal of the Korea Society of Computer and Information
    • /
    • v.9 no.4 s.32
    • /
    • pp.215-220
    • /
    • 2004
  • Production management confronted the environment of infinite competition should be prepared to abrupt variations of management environment and have the ability to be changed in short term. It has to be studied, the control method of products that correspond to multi-functionalization and reduced product life which is caused by high-quality and varied customers demands. As a process control method, we most be able not only to control varies characteristic in a control at once but also to detected special values quickly for high-quality. In this paper a control method referred above is presented.

  • PDF

Analysis characteristics of officers' watch-keeping for efficient navigation bridge layout of a fisheries training vessel (효율적인 어업실습선의 선교 layout을 위한 당직항해사의 업무특성 분석)

  • KIM, Min-Son;HWANG, Bo-Kyu
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.52 no.1
    • /
    • pp.56-64
    • /
    • 2016
  • This study analyzed characteristics of officers' watch-keeping during fishing operation at the fisheries training ship KAYA (GT: 1,737 tons, Pukyong National University). It observed fishing works of three officers in wheel house of KAYA. The observations were carried out at the fishing ground 45 miles away from east of Jeju from 7 to 8 January 2010. The works and movements of the officers were recorded with three common video cameras and a 4-channel MPEG-4 Triplex DVR. Recorded data of the working circulation was analyzed by using the post-processing method. As a result of the traffic lines, the average (${\pm}S.D$) of working hour (min) and moving frequency (times), distance (m) and speed (m/min) during setting the net was 11.8 (0.9), 43.7 (8.1), 133.9 (35.8) and 10.5 (0.6), respectively. During trawling the net, it was 100, 241 (39.8), 615.7 (194.6) and 5.2 (1.6), respectively. During hauling the net, it was 17.6 (1.4), 41.0 (7.2), 196.9 (37.6) and 10.7 (0.8), respectively. In addition, it has a different tendency of the instrument usage frequency by the fishing works. During setting, the usage priority was CCTV, ECDIS, RPM and pitch controller, net monitor, GPS plotter, chart room, X-band radar, fish finder and public addressor. During trawling, it was CCTV, ECDIS, fish finder, X-band radar, net monitor, chart room, GPS plotter, RPM and pitch controller, auto pilot and steering, interphone, wind speed and direction indicator, No.1. VHF, navigation light control panel and public addressor. During hauling, it was CCTV, RPM and pitch controller, GPS plotter, public addressor, chart room, net monitor, X-band radar, auto pilot and steering and fish finder.