• Title/Summary/Keyword: Working Plan

Search Result 735, Processing Time 0.022 seconds

A Study on Activation Plans of Flexible Work Arrangements Based on a Qualitative Case Study of a Foreign-affiliated Firm (외국계기업사례분석을 통한 유연근무제활성화방안 연구)

  • Lee, Hyun-Ah;Kim, Sun-Mi;Lee, Seung-Mi
    • Journal of Families and Better Life
    • /
    • v.30 no.2
    • /
    • pp.173-187
    • /
    • 2012
  • This qualitative case study focused on the activation plan of flexible work arrangements. We selected eight workers from a foreign affiliated firm that has various flexible work arrangements for in-depth interview and focus group interview. The workers were categorized into two groups; those who have experiences with flexible working and those who have needs for flexible working. We analyzed their condition of work-family life and experiences with flexible working. Through the focus group interview, we can find out the needs and suggestions about activation plans of flexible work arrangements.

A Study on Terms and Functions of Lifespace in Korean Vernacular Houses (한국민가의 생활공간 용어 및 기능에 관한 문헌상의 고찰(I) -중부지방을 중심으로-)

  • 박선희
    • Journal of the Korean Home Economics Association
    • /
    • v.25 no.3
    • /
    • pp.83-94
    • /
    • 1987
  • The floor plan of the folk houses in Korean-Middle area was "-" type, "ㄱ" type and "double " type. The common terms of lifespaces were Anbang(안방), Wootbang(웃방), Cunnunbang(건넌방), Taechung(대청), Maru(마루), Buoak(부엌), Chungji(정지), Sarangbang(사랑방), Bongdang(봉당). 1) Anbang was basically a master room and was a family room. The function of another presented in Anbang was a space of the dying hour, the mourning decorums, and the memorial services. 2) Wootbang, Cunnunbang was terms that coming from the space position. Such spaces were the private rooms of children. 3) Sarangbang was basically the space of a reception of guests. 4) Buoak, Chungji were cooking and working space. Primarily, Buoak was the terms meaned Bootumk(부뚜막) in Chosun dynasty. 5) Maru, Tachung were terms of presented from side of construction. Specially, it was the chief space in family in Summer. 6) Bongdang was a terms of space that mean working areas, entry hall etc.working areas, entry hall etc.

  • PDF

A Study on Office Workers' Preference for Spatial Characteristics of Home Office (재택근무 희망 근로자의 재택 근무 공간 특성에 대한 선호 연구)

  • 신화경
    • Journal of the Korean housing association
    • /
    • v.12 no.2
    • /
    • pp.87-95
    • /
    • 2001
  • The number of people working in their own home has been increasing, and this will change the form of house. Therefore, it is necessary to plan the new house for the people working at home, and to offer business related working area. This study was designed to know the office workers preference for spatial characteristics of home office. Data were collected through a questionnaire survey. The subject were 257 office workers living in Seoul area. Frequency, percentage, and MM2 : $\textrm{X}^2$-test were used. The results showed that the place for home-office should be located independently inside house. The desirable size for the home-office might be 3-4 pyung. If the place for home-office share with other places, livingroom of bedroom, it is necessary to develop furniture and partition matching with residential furniture and atmosphere. Office workers prefer U-shaped workstation and coner-shaped workstation.

  • PDF

Process Optimization Method Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공정관리 최적화 방안)

  • Lee, Si-Hyun;Lee, Seung-hak;Woo, Mi-Sun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.117-118
    • /
    • 2015
  • These days buildings have more possibilities to occur construction delay as many variables and risks are inherent in them due to the enlargement and complexity. When a project is delayed, it generates extra working expenses and this causes a dispute between the employer and the constructor. Most construction sites conduct emergency construction work to recover the delay of the project duration. When an emergency construction is carried out in the actual construction site, it's necessary to utilize and distribute the proper working groups based on the procedure of successor and predecessor. Many constructions, however, have been going only with more number of work forces and working time. This study suggests a process management optimization plan with an application of emergency construction scenario by using linear programing.

  • PDF

A Study on the Influence of Employee Job Environment on the Job Satisfaction (근무 환경이 직무만족에 미치는 영향 연구 - 도시철도 승무원을 중심으로 -)

  • Chang, Yong-Ho;Kook, Kwang-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1943-1954
    • /
    • 2008
  • The Seoul Metro has been playing a vital role in public transportation for last 35 years as the feet of 10 millions of Seoul citizens. It currently takes charge of over 45% of the national subway transit and transports 4 millions of citizens a day. The purpose of this study is to suggest a plan for crew members' working condition improvement and job satisfaction improvement which will lead to the finest quality of service to the citizens. We examined the working conditions of the crew members and surveyed crew members about the working conditions and the extent of job satisfaction. The results of our study can also be used as basic materials for building the road map to the management improvement.

  • PDF

Path optimization method for shifting path planning of marking robot (먹매김 로봇 작업경로 설정을 위한 최적경로 탐색방법)

  • Lim, Hyunsu;Kim, Taehoon;Kim, Taehoon;Kim, Chang-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.144-145
    • /
    • 2022
  • Since the marking robot draws lines by point-to-point operation, the robot's shifting path greatly affects the working time and productivity. Therefore, it is required to analyze the movement method based on the robot's motion and plan to minimize the movement time. Therefore, this study proposes a method that can optimize the robot's shifting path to minimize the working time of the marking robot. Through the results of this study, it is expected that the non-working time of the marking robot will be reduced and the efficient operation will be possible.

  • PDF

The implementation of the integrated design process in the hole-plan system

  • Ruy, Won-Sun;Ko, Dae-Eun;Yang, Young-Soon
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.4 no.4
    • /
    • pp.353-361
    • /
    • 2012
  • All current shipyards are using the customized CAD/CAM programs in order to improve the design quality and increase the design efficiency. Even though the data structures for ship design and construction are almost completed, the implementation related to the ship design processes are still in progress so that it has been the main causes of the bottleneck and delay during the middle of design process. In this study, we thought that the hole-plan system would be a good example which is remained to be improved. The people of outfitting division who don't have direct authority to edit the structural panels, should request the hull design division to install the holes for the outfitting equipment. For acceptance, they should calculate the hole position, determine the hole type, and find the intersected contour of panel. After consideration of the hull people, the requested holes are manually installed on the hull structure. As the above, many processes are needed such as communication and discussion between the divisions, drawings for hole-plan, and the consideration for the structural or production compatibility. However this iterative process takes a lot of working time and requires mental pressure to the related people and cross-division conflict. This paper will handle the hole-plan system in detail to automate the series of process and minimize the human efforts and time-consumption.

A study on the Planning of a general ward in infectious diseases hospital considering the efficiency of hospital operation (운영 효율성을 고려한 감염병 전문병원의 일반병동 건축계획에 관한 연구)

  • Han, Eunbee;Kwon, Soonjung
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.4
    • /
    • pp.29-39
    • /
    • 2021
  • Purpose: As the need for a hospital specializing in infectious diseases has increased, construction is being promoted. Hospitals specializing in infectious diseases receive some state subsidies, but in the case of private hospitals, hospital operation efficiency should be considered to prevent cost loss. Therefore, we aim to derive a building plan for a general ward in a hospital specializing in infectious diseases that can be used not only in normal times but also in times of crisis. Methods: In this study, relevant literature review and field interviews were conducted with medical staff working in facilities designated as infectious disease hospitals. Results: The general ward building plan of the hospital specializing in infectious diseases was classified into three categories and presented. 'Spatial composition' for nursing unit and ward zoning, 'Spatial plan' for ward space conversion in normal times and crises, 'Bedroom plan' for effective dimensions and area of the ward. Implications: It can be used as a guideline when designing an infection-facility ward. And it can be a basis for inducing improvements to prevent infection in the ward of existing medical facilities.

Study on the Development of Management System of National Forest in Japan - Emphasis on the Management Plan and Regulation - (일본(日本)의 국유림시업(國有林施業) 전개(展開)에 관한 고찰(考察) - 시업계획(施業計劃) 방침(方針)을 중심(中心)으로-)

  • Choi, In-Hwa
    • Journal of Forest and Environmental Science
    • /
    • v.9 no.1
    • /
    • pp.81-95
    • /
    • 1993
  • The purpose of this study is to analyze the historical development process on management plan and regulation in Japan in order to contribute to the systmatic management plan of national forest in Korea. Before the World War II, remarkable national forest management plan in Japan was introduction of the normal forest ideas by the management plan of the combination system of maximum forest rent and maximum soil rent, employing the clear-cutting of small area, simplified area-period method, and about 70-80 years rotation. After World War II, enterprise management was developed from the previous combination system. During the rapid economic development period, the original working system and normal forest ideas were not recognized, so that the destructions of forest and environment were resulted from the yield of future increment and clear-cutting of large area. During the slow economic development period, on the other hand, the reproduction of forest resources was difficult, as the result of the negligent management system and the depression of management. Future management system of national forest, therefore, should establish the working system and the management plan for the purpose of both forest resources reproduction and environment maintenance, simultaneously.

  • PDF

A Investigation Study on the Recommendation for the Evacuation Plan using Evacuation Elevator of AIJ (II) (일본건축학회의 화재 시 피난 엘리베이터를 이용한 피난계획 지침안(案)에 대한 조사(II))

  • Lee, Jae-Won;Kim, Dong-Eun;Seo, Dong-Goo;Kwon, Young-Jin
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2008.11a
    • /
    • pp.316-321
    • /
    • 2008
  • Most elevators worldwide do not have smoke protection, fire protection, and other features necessary for them to be considered as a means of fire evacuation. It is the aim of this study to investigate and analyze the recommendation for the evacuation plan using evacuation elevator of AIJ the aim of this study is to introduce AIJ method for the safety plan using evacuation elevator of high rise building written by working group fire resistant.

  • PDF