Purpose: The Objective of this study is to explore the capabilities of an integrated modelling and simulation workflow when applied to an experiment-based research process, aimed at deriving daylight optimization strategies specific to tall buildings. Methods: Two methods were devised to apply this workflow with the help of DIVA and Rhino/Grasshopper. The first method is a multiple variant analysis by setting up an appropriate base case and analysing its daylight and energy performance, forming the basis of comparison for subsequent cases for design variants. The second method involved setting up the base case within a site context and conducting a solar irradiation study. An architectural variables such as overhang and shading device, were then defined as inputs in the parametric definition in Grasshopper to control the selected variable. Results: While the first method took advantage of the speed and efficiency of the integrated workflow, the second method was derived based on the ability to directly process simulation data within the integrated, single-software platform of the proposed workflow. Through these methods, different architectural strategies were explored, both to increase daylight penetration and to reduce radiant heat gain. The focus is on methods by which this workflow can be applied to facilitate the experimental derivation of daylight optimization strategies that are specific to tall building design.
KSII Transactions on Internet and Information Systems (TIIS)
/
제10권3호
/
pp.976-995
/
2016
Workflow scheduling is one of the challenging problems in cloud computing, especially when service reliability is considered. To improve cloud service reliability, fault tolerance techniques such as fault recovery can be employed. Practically, fault recovery has impact on the performance of workflow scheduling. Such impact deserves detailed research. Only few research works on workflow scheduling consider fault recovery and its impact. In this paper, we investigate the problem of workflow scheduling in clouds, considering the probability that cloud resources may fail during execution. We formulate this problem as a multi-objective optimization model. The first optimization objective is to minimize the overall completion time and the second one is to minimize the overall execution cost. Based on the proposed optimization model, we develop a heuristic-based algorithm called Min-min based time and cost tradeoff (MTCT). We perform extensive simulations with four different real world scientific workflows to verify the validity of the proposed model and evaluate the performance of our algorithm. The results show that, as expected, fault recovery has significant impact on the two performance criteria, and the proposed MTCT algorithm is useful for real life workflow scheduling when both of the two optimization objectives are considered.
다분야 통합 최적설계(MDO)는 여러 설계분야가 복잡하게 얽혀서 설계가 진행되어야 하는 항공기나 우주발사체등의 설계에 매우 유용하게 적용되고 MDO 시스템은 다양한 설계 분야의 통합적이고 동시적인 해석 및 설계 최적화를 위한 통합 환경 또는 시스템이다. MDO 시스템은 이기종의 환경에서 분산되어있는 다양한 해석 코드 및 최적화 코드, CAD, DBMS, GUI등의 자원들을 통합하고 효율적으로 사용할 수 있어야하며 협업설계환경을 제공해야한다. 본 논문에서는 웹 서비스 기반의 글로버스 툴킷을 이용해 설계자원들을 통합하고 워크플로우, 에이전트 등의 자동화 기술을 이용해 유기적인 자동실행을 제공하며 웹 유저 인터페이스를 통해 협업설계환경을 제공하는 웹 서비스 기반 MDO 시스템의 구축방안을 제시한다.
Recently, the rapid progress of Internet and Network affects engineering design environment as well as business fields to utilize Web technologies to enhance it's competitiveness in the world. This situation has also caused many companies to seek out the possibility to increase the collaboration between different organizations within their Product design process. Thus. this research shows the web based distributed design system framework which involves Workflow-based framework that enables to automate, integrate and manage the design process, such as CAD, CAE, Optimization tools.
The patient's waiting time and length of stay have been reported as a factor decreasing their satisfaction in the hospital, especially in developing countries. This paper focuses on modeling hospital's outpatient department workflow in a developing country and optimizing the patient waiting time as well as total length of stay. By using discrete-event simulation, many alternative scenarios have raised, such as adding more working time, altering human resources, and adjusting the staff's responsibility, those scenarios will be examined to explore better settings for the hospital. The results show that possible to achieve a 9.6% reduction in patient total length of stay and it could be accomplished without adding more resources to the hospital.
Most of business enterprises today struggle with the coordination of work which is one of the most challenging problems in the business environment. And the situation becomes worse by the increasing complexity and uncertainty. In this paper, suitability of workflow technology for the modelling, optimization, and automation in the complex business structures is discussed. Also, in the abscence of a fully fledged method for analysis and design of workflow systems, this paper proposes a method, ETM(Extended Trigger Modelling), which can solve several problems in other methods. The proposed ETM approach consists of three stages such as situation analysis stage, activity coordination stage and implementation preparation stage. A modelling case of the proposed procedure is also presented.
This paper introduces the process for Multi-objective Optimization Framework (MOF) which mediates multiple conflicting design targets. Even though the extensive researches have shown the benefits of optimization in engineering and design disciplines, most optimizations have been limited to the performance-related targets or the single-objective optimization which seek optimum solution within one design parameter. In design practice, however, designers should consider the multiple parameters whose resultant purposes are conflicting. The MOF is a BIM-integrated and simulation-based parametric workflow capable of optimizing the configuration of building components by using performance and non-performance driven measure to satisfy requirements including build programs, climate-based daylighting, occupant's experience, construction cost and etc. The MOF will generate, evaluate all different possible configurations within the predefined each parameter, present the most optimized set of solution, and then feed BIM environment to minimize data loss across software platform. This paper illustrates how Multi-objective optimization methodology can be utilized in design practice by integrating advanced simulation, optimization algorithm and BIM.
동시공학개념이 최적화의 개념과 함께 대두되면서 최적화 적용을 위한 많은 노력들이 실제 설계 문제에 적용되어 왔다. 하지만 최적화가 적용될 수 있는 설계 문제들은 확대되었지만 선박 설계과정은 모든 관련된 설계 작업들의 전산적인 통합의 어려움으로 인해 많은 부분들이 여전히 반복적인 접근 방법에 의존되고 있다. 이러한 접근 방법은 전체 설계 문제를 쉽게 다룰 수 있는 많은 하위 문제로 분해한 후 많은 다른 팀에 의해 복잡한 내부 상호작용 통해 이루어지고 있다. 본 논문은 이러한 실제 선박 설계 초기과정에 대해 초점을 맞추고 있다. 본 논문에서는 워크플로우(workflow) 기반 설계 프로세스 관리 시스템 구축을 위한 첫 단계로서, 프로세스 중심의 통합 프레임워크를 제안한다. 이 프레임워크는 크게, 관리자가 설계 진행 상황을 모니터링하고 관리할 수 있는 부분과 설계자가 설계 워크플로우를 따라 효과적으로 설계 업무를 수행할 수 있는 설계 업무 관리 부분으로 나뉘어진다. 전체 시스템은 그 관리 대상에 따라 여러 개의 모듈로 나뉘어지고, 그 모듈간에는 전체 시스템의 기능 달성을 위해 합리적인 상호작용이 이루어질 수 있도록 설계되었다. 설계 프로세스 모델은 실제 선박설계 현실의 분석을 통해 최대한 합리적이고 적용 가능한 모델이 괼 수 있도록 제안되었다. 제안된 프레임워크는 상용 워크플로우 시스템을 통해 실제로 구현될 예정이다.
전 세계적으로 다양한 응용과학 분야의 연구자들은 그들의 연구 개발에 필수적인 고성능 컴퓨팅 자원의 확보와 복잡한 수치 해석 기법 개발을 위해 막대한 연구를 수행해 왔다. 특히 항공 우주 분야에서는 공력 최적 설계를 위해 소요되는 시간과 비용을 상당 부분 줄이기 위해 진보적인 수치기법을 개발하고 컴퓨팅 기술의 발전에 의존해왔으나, 여전히 1회의 실험에 막대한 비용 지출과 수개월의 소요 기간을 감수하고 있는 실정이다. 본 논문에서는 항공 우주 분야 연구자들의 연구 개발 편의성을 도모하고자 다양한 컴퓨팅 자원 인프라를 제공하는 통합 공학 교육 실험 환경을 소개하고 그 우수성을 보인다. 다양한 컴퓨팅 인프라구조로의 연결을 통해 산재되어 있는 다수의 컴퓨팅 자원 활용이 가능하므로 다수의 교육 대상자 및 연구자들에게 장소에 제한 없는 실험 시도를 가능케 함으로써 연구 개발의 복잡성을 줄이고 생산성을 높일 수 있다. 또한 통합 환경을 교육에 활용하여 교육 효율성을 극대화시킬 수 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.