• 제목/요약/키워드: Work-in-Process Management

검색결과 1,890건 처리시간 0.027초

석면 해체제거 보양작업에서 JSA 및 Checklist 적용 (Application of JSA and Checklist in Asbestos Sealing)

  • 조규선
    • 한국안전학회지
    • /
    • 제35권2호
    • /
    • pp.61-66
    • /
    • 2020
  • As asbestos-containing buildings are getting older, asbestos deconstruction works are increasing. As a result, accident risks such as falls, cuts, electric shocks, and suffocation are increasing. Existing studies are mostly about health management and institutional policy research and there is little research on work risk. So workplace risk assessments that are easily applicable in the field are required to be applied. Sealing is the first process of asbestos deconstruction and is the first step to ensure worker's safety. Job Safety Analysis(JSA) and Checklist were used to identify the risk factors and to calculate the level of the risk. By comparing the two risk assessment tools, it was figured out that the JSA is appropriate for the initial process and change of work procedure while Checklist is appropriate for repetitive work. Because the sealing process is sort and simple, it is unlikely to cause serious injury. But since the risk of falling and cuts are exist, safety education and supervision are necessary to maintain a safe working environment.

조직업무 특성과 계획수립 과정이 정보계획수립 성과에 미치는 영향 (A Study on the Relationship of Organizational Work and Planning Process with ISP Performance)

  • 길이홍;김성근
    • 경영정보학연구
    • /
    • 제3권1호
    • /
    • pp.103-114
    • /
    • 2001
  • Today many firms rely on information systems planning (ISP) to remain competitive by transforming their business model and redesigning their IT architecture. In spite of some great success stories, many firms are having a lot of difficulty with ISP. Previous research has found a number of critical factors for ISP. However, these studies have focused mainly on organizational characteristics. In contrast, our study has taken into consideration organizational work and planning process as main critical factors for ISP performance. Empirical results indicate that the ISP performance has a stronger relationship with ISP planning process rather than organizational work characteristics.

  • PDF

HACCP 적용 초등학교급식에서의 시행실태와 개선방안 (Current State and Improvement Measures of HACCP System Applying in Elementary School Lunch)

  • 우근연;박재용;한창현
    • 한국학교보건학회지
    • /
    • 제16권2호
    • /
    • pp.13-23
    • /
    • 2003
  • To provide data necessary for effectively applying the HACCP system by understanding the current application condition of HACCP system and satisfaction level of the dietician in elementary schools, a mail-in survey was conducted on dieticians serving for 227 elementary schools applying HACCP system in Kyungsangbuk-Do since November 1, 2001 to December 20, 2001. 83.5% of the subjected schools were conducting more than 50% of HACCP cooking process management, and the level of cooking process management displayed significant relevance according to the number of dieticians serving the school meals. The area that was not well conducted in the field of HACCP system was proven to be water examination(94.0%), inspection on self-sanitation of cooks prior to cooking(90.6%), and maintenance of dry kitchen floor(l4.8%). The reason why the above areas are not well conducted was because of lack of time due to over workloads. Subjective dieticians had pointed out improvement of sanitary concept(58.1%) and improvement of self-sanitation (28.8%) as benefits of applying HACCP. 21.2% of the subjective dieticians were satisfied with application HACCP and 35.2% were dissatisfied with applying HACCP. In case of which the duration of applying the HACCP was longer than one year and in case of higher rate of HACCP cooking process management and longer work experience of the dieticians, the level of satisfaction was proven to be significantly higher. The most difficult things to follow in important management categories according to the features of dietitian work and work experience were food distribution of CCP7 step and maintenance of optimum temperature(70.7%). Subjective dieticians had pointed out insufficient facility or environment and lack of inspection equipments in order regarding problems of applying HACCP. Also in the level of necessity of improvement categories in applying HACCP, dieticians had replied that facility and equipment improvement was mostly needed. Due to the induction of HACCP system in school meals, comparatively well cooking process management is being conducted, and I believe it could contribute in securing safety and quality improvement of school meal by improving the sanitation concept of the dieticians. However, the satisfaction level of dieticians are rather low and there are many difficulties in maintaining optimum temperature in the process of food distribution and transportation process. Also, lack of facilities and environment, lack of inspection equipments and etc are pointed out as problems of inducing HACCP. Thus, to settle HACCP system, it is believed that brave investment must be preceded.

전행적 BCP프로세스 구축운영이 은행원의 직무만족도에 미치는 영향에 관한 연구 (A Study on the Effect of Banker's Business Satisfaction Through the BCP Process)

  • 정해원;김현수
    • 한국IT서비스학회지
    • /
    • 제6권1호
    • /
    • pp.31-45
    • /
    • 2007
  • With the announcement of Basel II Accord in 2004, worldwidebanks have been strengthening their risk management system. Under the circumstances, S became the first bank among other financial institutions in Korea to establish bank-wide BCP process that goes beyond the past Disaster Recovery Planning or DRP. Considering that the purpose of the process is to guarantee stability of work under the real disastrous situation, other banks are anticipated to introduce the process sooner or later to cope with any possible disaster and adhere Basel II Accord. The purpose of this thesis is to see how much impact does the work process or its improvement would have on employees' satisfaction level by considering Recovery Time Objectives (RTO) via Business Impact Analysis (BIA) and influence of BCP process implementation on parties involved.

공동주택 하자사례 분석에 관한 연구 (The Study on Case Analysis of an Apartment House Defects)

  • 이희두;이해진;김진호;임남기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.130-135
    • /
    • 2001
  • In this study, I have researched into the causes of defects in apartment house, The results of this study are listed below. (1) Water leakages which result from land sinking and cracks, results of misuse of back filling method, are the main reason of defects in civil engineering work and architectural work. (2) Inexperience and unwillingness are the main reason of defects in plaster work. (3) In windows work and painting work, the main reasons are lacks of precision construction and efflorescence resulting from outdoor air, respectively. (4) Defects in waterproofing work and electric work result from fault construction by low unit Costs. (5) Equipment work requires uses of standardized construction materials and management, and landscape architecture work requires minimizing human mistakes, for instance, degin carelessness. For the reasons stated above, the causes of defects in apartment house are insufficient construction labors, inferior construction materials, urgent construction process time, and conscientiousless industrialists who only seek after a profit margin.

  • PDF

상주 소방감리업무의 현실적 문제점에 대한 연구 -대전지역을 중심으로- (A Study on the Actual Problems of Field Fire Supervision System(Focus to Dajeon City))

  • 최만철;김병석
    • 대한안전경영과학회지
    • /
    • 제13권1호
    • /
    • pp.31-39
    • /
    • 2011
  • In this study, supervision resides fire mission against problems associated with case studies and surveys done through the side of the field work, technical personnel, fire management, including fire code aspects classified into three kinds of items dealt with the issue. Started at the scene of the problem in terms of performance, the issue of the construction process, mainly dealt with the issue at the time of completion. Fire management side, supervisor of technical personnel, human resources management issues, contract issues, fire code level, the frequent revisions of fire regulations, supervision, processing delays of the resulting report, the problem resides with the expansion of Fire Supervision target was mentioned. Finally, the target for each hierarchical supervision, and resident supervisor of the need for supervision of work performance test was carried out by the correlation.

A Quality Assurance Process Model on Fault Management

  • Kim, Hyo-Soo;Baek, Cheong-Ho
    • Journal of Information Processing Systems
    • /
    • 제2권3호
    • /
    • pp.163-169
    • /
    • 2006
  • So far, little research has been conducted into developing a QAPM (Quality Assurance Process Model) for telecommunications applications on the basis of TMN. This is the first trial of the design of TMN-based QAPM on fault management with UML. A key attribute of the QAPM is that it can easily identify current deficiencies in a legacy system on the basis of TMN architecture. Using an empirical comparison with the legacy systems of a common carrier validates the QAPM as the framework for a future mode of the operation process. The results indicate that this paper can be used to build ERP(Enterprise Resource Planning) for a telecommunications fault management solution that is one of the network management application building blocks. The future work of this paper will involve applying the QAPM to build ERP for RTE (Real Time Enterprise) fault management solution and more research on ERP design will be necessary to accomplish software reuse.

DEVELOPMENT OF KNOWLEDGE BASED SELECTION PROCESS FOR FINISHING MATERIALS AT BUILDING DESIGN PHASE

  • Su-Ho Yun;Hyun-Soo Park;Gyu-Tae Noh;Hye-Rin Lee;Kyo-Jin Koo
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.209-212
    • /
    • 2011
  • Selection of finishing materials in the design stage is an important management factor in terms of use safety and satisfaction, and work cost and process. However, selection of materials in the design stage is usually conducted without related guidelines or a set process, but depends on the experience of the architect or advice of materials company employees. Therefore, the aim of this study was to develop a finishing materials selection process that can be used by a architect. Materials selection related rules collected through interview with experts and five office building cases were used as knowledge. In addition, another aim of the study was to propose a prototype system interface for use in the field.

  • PDF

다변량 시스템 공정능력지수(SCpsk) (A New Multivariate System Process Capability Index)

  • 조남호;이용훈
    • 대한안전경영과학회지
    • /
    • 제5권3호
    • /
    • pp.145-156
    • /
    • 2003
  • As we understand it, Process Capability indices are intended to provide single-number assessments of ability to meet specification limits on quality characteristics of interest. As a consequence of the varied ways in which PCIs are used, there have been two natural lines of research work: $\circled1$ studies on the properties of PCIs and their estimators in many different environments; $\circled2$ construction of new PCIs purporting to have better properties in certain circumstances. The most of existing process capability indices are concerned with the single variable. But, in many cases, a quality characteristic is composed with several factors. In that case, we want to know the integrated process capability of a quality characteristic not those of each factor. In this paper, we proposed a new multivariate system process capability index called $MSPCI:SC_{psk}$ which is the geometric mean of performance measure $C_{psk}$'S, and will be used as the criterion to assess multiple response process designs. Numerical illustration is done for $SC_{psk}$, $\overline{C_p}$(f), Cp, Cpk, Cpm, and Cpsk.

벽식구조 거푸집공사의 품질 및 생산성향상을 위한 공법개선 연구 (A Study of Construction Methods for Quality and Productivity Enhancement of Form Works in the Bearing Wall Systems)

  • 이정호;주진규;김선국;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.523-526
    • /
    • 2002
  • 벽식구조 골조공사에서 거푸집공사는 원가에 지배적 비율을 점하고 RC 구조체의 중심공법으로 활용되고 있기 때문에 체계적이고 효율적인 공법개선이 요구된다. 이에 본 논문은 거푸집공사의 품질 및 생산성향상을 위한 공법개선을 목적으로 한다. 과학적인 분석기법을 통한 기존 벽식구조 거푸집공사의 문제점을 개선하고자 생산성 분석기법인 워크 샘플링을 활용하였다. 개선안을 도출하기 위한 방법론을 제시하고, 개선방향에 따라 거푸집공사의 품질 및 시공단순화를 위한 유닛화 및 기계화 방안으로 키커폼(kicker form)을 제시하였다. 이는 거푸집공사 수행에 있어 불필요한 작업프로세스를 줄이고 생산성 및 종합적인 시공품질이 향상될 것으로 판단된다.

  • PDF