• Title/Summary/Keyword: Work-in-Process Management

Search Result 1,893, Processing Time 0.029 seconds

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.

An Analysis on Process Type for Construction Logistics Using RFID Technology (RFID를 이용한 건설 물류관리 프로세스 타입 분석)

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.161-166
    • /
    • 2006
  • Recently various applications have been proposed to improve supply chain process and management by not only using various management theories such as JIT(just In Time) and SCM(Supply Chain Management) but also utilizing emerging technology like RFID(Radio Frequency Identification). But existing research was merely focused on the use of the theories and technology on a particular work or material. Therefore, the objective of this study is to derive basic types of construction supply chain management which spans from manufacturing to installation at the construction site. This research proposes the seven types of construction supply chain processes, which has been derived based on the progress management theory and budget items for construction project. It is expected that the result of this study can be applied for RFID-based construction supply chain management as well as more efficiencies in various management areas.

  • PDF

DESIGN MANAGEMENT FOR CONSTRUCTABILITY REVIEW OF HIGH QUALITY EXPOSED CONCRETE

  • Doo Won Hwang;Young woong Song;Yoon ki Choi;Dong Woo Shin;Jae Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1154-1157
    • /
    • 2005
  • This report is to do design management for constructability review of high quality exposed concrete, which is used increasingly in recent. To secure systematic management at design phase, we reviewed each definition and work at each design phase, we define high quality exposed concrete, a part of architectural concrete, as "an exposed concrete which has well ordered joint & is in pursuit of smooth surface." We reviewed requirements and influential factor to obtain High quality finishing surface and compared construction process of high quality exposed concrete with that of other finishing method. Management method at each design phase for constructability review to meet additional works and requirements is presented.

  • PDF

Deep learning platform architecture for monitoring image-based real-time construction site equipment and worker (이미지 기반 실시간 건설 현장 장비 및 작업자 모니터링을 위한 딥러닝 플랫폼 아키텍처 도출)

  • Kang, Tae-Wook;Kim, Byung-Kon;Jung, Yoo-Seok
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.24-32
    • /
    • 2021
  • Recently, starting with smart construction research, interest in technology that automates construction site management using artificial intelligence technology is increasing. In order to automate construction site management, it is necessary to recognize objects such as construction equipment or workers, and automatically analyze the relationship between them. For example, if the relationship between workers and construction equipment at a construction site can be known, various use cases of site management such as work productivity, equipment operation status monitoring, and safety management can be implemented. This study derives a real-time object detection platform architecture that is required when performing construction site management using deep learning technology, which has recently been increasingly used. To this end, deep learning models that support real-time object detection are investigated and analyzed. Based on this, a deep learning model development process required for real-time construction site object detection is defined. Based on the defined process, a prototype that learns and detects construction site objects is developed, and then platform development considerations and architecture are derived from the results.

Differences in Clinical Professors' Work-Life Balance by Position in Medical Schools (의과대학 임상교수 직급에 따른 일과 삶의 균형 차이 )

  • Yu Ra Kim;Hwan Ho Lee;So Jung Yune
    • Korean Medical Education Review
    • /
    • v.25 no.1
    • /
    • pp.45-54
    • /
    • 2023
  • We investigated the work-life balance of clinical professors in charge of patient care, research, and education at medical schools and the demand for work-life balance support according to position (professor, associate professor, or assistant professor). In total, 163 clinical professors completed the consent form and participated in the study. They filled out an online survey consisting of questions about essential characteristics, a work-life balance test, stress, burnout, work-life satisfaction, and work-life balance support needs. We analyzed the results by analysis of variance and cross-tabulation using IBM SPSS ver. 23.0. Differences were found in work-life balance, stress, burnout, and satisfaction with life and work by position. The requirements for support for work-life balance also varied by professional status. Professors had a higher balance between life and work than associate professors or assistant professors. The specific requirements for work-life balance support were also slightly different for each position. Overall, there was a high demand for work process simplification and efficiency for work support, flexible working hours and sabbatical years for family and leisure, and career management consulting and training support for growth. Assistant professors and associate professors had a lower level of work-life balance than professors, as well as higher levels of stress and burnout. Professors' job satisfaction was also higher than that of the other groups. Based on the results of this study, we hope that a healthy work environment can be established through work-life balance support suitable for clinical professors' positions.

A Model of Risk Management Plan in the Development Phase of Urban Regeneration Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.11 no.2
    • /
    • pp.35-42
    • /
    • 2009
  • Recently, intensive urban redevelopment concentrated on new towns has reduced the number of settled population, and weakened various functions such as commercial, culture, education and welfare in old towns, and made the stagnation and declination of the entire or some parts of old towns. Urban regeneration project means renewing cities' functions in terms of physical, environmental, social, cultural, industrial and economic aspects or revitalizing the existing functions through improvement project in the entire or part of a city, which is now drawing keen attention from the public. However, urban regeneration project is huge in scale, needs long construction period and various complex facilities, and also characterized by complicated relations with many stakeholders. Due to such characteristics, there are many risks in the project. Therefore, systematic risk management is absolutely necessary to efficiently manage various risk factors inherent in urban regeneration project. The purpose of this research proposes a basic model to establish risk management plan and work process in order to help project participants to perform risk management more systematically and rationally in the development phase of urban regeneration project.

A Study on the P.S.M. system for the Construction Safety (건설안전을 위한 P.S.M. 기법에 관한 연구)

  • Lee, Song;Son, Gi-Sang;Choi, Won-Il;Oh, Tae-Sang;Chae, Jum-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.4
    • /
    • pp.101-111
    • /
    • 2000
  • In order to introduce P.S.M. system adequate to domestic construction first, many cases similar to advanced foreign P.S.M. system have been collected and compared to the domestic situation. Then, the current safety management status of bridges, subways, apartment and office building construction are investigated while visiting interview, using questionnaire at site have being done. The potential hazard and measurement have been investigated for each kind of works, and the domestic introducing method of P.S.M. system is analyzed with expert discussion. In order to represent how to make out P.S.M. plan, the questionnaire is made out using each five place for bridge, subways, apartment and office building. As the weight factor for potential hazard of each work obtained from more than forty site places, is produced and shown. Also, a direction the recommendation is suggested to improve tool in each construction site with work schedule. It is thought that proposed schedule contributed to keeping in safe business administration of each company in decreasing many effort at the construction site.

  • PDF

Engineering Process Management System for Commercial ship Design (상선 설계를 위한 엔지니어링 프로세스 관리 시스템)

  • Park, Kwang-Phil;Suh, Heung-Won;Lee, Sung-Geun
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.57-67
    • /
    • 2007
  • As the competition among commercial shipyards gets more intense and the number of ships to be designed is increasing significantly, the state is that engineering work volume has increased proportionately. Under these conditions, various attempts have been tried to improve performance in design activities and it has come to a vital issue as to how the design process should be managed and conducted in more efficient manner. To achieve this goal, an engineering process management system has been developed, named 'DSME Engineering Wizard System'. It aims to accelerate process performance by managing execution, promoting collaboration and maximizing engineering data reusability based on workflow concept. For the application of this system, Marketing Design which is one of the major processes for commercial ship design was analyzed and established into a unique workflow template consisting of activities, getting design experiences organized into a best practice in which engineering tasks are performed in the way proven most efficient.

  • PDF

Experimental Implementation of Digital Twin Simulation for Physical System Optimization (물리시스템 최적화를 위한 디지털 트윈 시뮬레이션의 실험적 구현)

  • Kim, Kyung-Ihl
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.4
    • /
    • pp.19-25
    • /
    • 2021
  • This study proposes a digital twin implementation method through simulation so that the manufacturing process can be optimized in a manual manufacturing site. The scope of the proposal is a knowledge management mechanism that collects manual motion with a sensor and optimizes the manufacturing process with repetitive experimental data for motion recognition. In order to achieve the research purpose, a simulation of the distribution site was conducted, and a plan to create an optimized digital twin was prepared by repeatedly experiencing the work simulation based on the basic knowledge expressed by the worker's experience. As a result of the experiment, it was found that it is possible to continuously improve the manufacturing process by transmitting the result of configuring the optimized resources to the physical system by generating the characteristics of the work space configuration and working step within a faster time with the simulation that creates the digital twin.

The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes (국가 산.학.연 협력 연구개발을 위한 과제목표관리 정보시스템의 설계 및 효과 분석)

  • Sohn, Kwon-Joong;Yoo, Wang-Jin;Lee, Cheol-Gyu
    • Journal of Technology Innovation
    • /
    • v.16 no.1
    • /
    • pp.107-139
    • /
    • 2008
  • We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.

  • PDF