• Title/Summary/Keyword: Work-in-Process Management

Search Result 1,890, Processing Time 0.034 seconds

A Study on the Application of FRAM to PSM through the Analysis of Serious Industrial Accident in Non-routine Work (비정상 작업에서 발생한 중대산업사고 분석을 통한 FRAM의 PSM 활용 방안에 관한 연구)

  • Young-Gwan Kim;Jin-Woo Jung
    • Korean Chemical Engineering Research
    • /
    • v.62 no.1
    • /
    • pp.44-52
    • /
    • 2024
  • PSM(process safety management), introduced for the purpose of managing complex chemical processes, has contributed to the prevention of chemical accidents, but has recently revealed its limitations. Recently, major industrial accidents have increased, and in particular, Serious Industrial Accidents have increased rapidly in non-routine works since 2020. It is time for an effective PSM operation plan. This study examined that FRAM can be effectively used in the PSM operation process by using FRAM (Functional Resonance Analysis Method), a useful technique for understanding and predicting human error and accident occurrence processes by modeling nonlinear and complex interactions, to analyze accident cases that occurred in non-routine works, and to further analyze the process of performing general PSM non-routine works.

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF

Efficiency Analysis for RFID-based Curtain Wall of unit Type Construction (RFID 기술 적용에 따른 유닛타입 커튼월 공사의 효율성 분석)

  • Kang, Hyun-Koo;Ha, Young-Seo;Lim, Chul-Woo;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.206-213
    • /
    • 2008
  • Due to the following reasons, the management of curtain wall parts and material is very Important. Firstly, curtain wall work is one of the main works in High-rise building construction for it takes about $10{\sim}15%$ of the total construction cost. Secondly, the whole process of curtain wall work including manu acture, delivery, storage, installation and maintenance is very complicated and sometimes more than 30 companies involve in the process. Thus there are many control points for curtain wall units. Thirdly, there are not enough space on site for material storage and this situation is more serious for sites in urban area. The purpose of this research is to validate an information systems using RFID technology that is developed to manage the curtain wall units following the process of curtain wall work. For the validation, the cycle times of curtain wall work before and a ter the system was used. The results show that using the systems shorten the cycle time of the curtain wall work. Thus it is concluded that the system can increase the efficiency of managing curtain wall work.

Photodegradation stability study of PVDF- and PEI-based membranes for oily wastewater treatment process

  • Ong, C.S.;Lau, W.J.;Al-anzi, B.;Ismail, A.F.
    • Membrane and Water Treatment
    • /
    • v.8 no.3
    • /
    • pp.211-223
    • /
    • 2017
  • In this work, an attempt was made to compare the effects of UV irradiation on the intrinsic and separation properties of membranes made of two different polymeric materials, i.e., polyvinylidene fluoride (PVDF) and polyetherimide (PEI). The changes on membrane structural morphologies and chemical characteristics upon UV-A exposure (up to 60 h) were studied by FESEM and FTIR, respectively. It was found that cracks and fractures were detected on the PVDF-based membrane surface when the membrane was exposed directly to UV light for up to 60 h. Furthermore, the mechanical strength and thermal stability of irradiated PVDF-based membrane was reported to decrease with increasing UV exposure time. The PEI membrane surface meanwhile remained almost intact throughout the entire UV irradiation process. Filtration experiments showed that the permeate flux of UV-irradiated PVDF membrane was significantly increased from approximately 11 to $16L/m^2.h$ with increasing UV exposure time from zero to 60 h. Oil rejection meanwhile was decreased from 98 to 85%. For the PEI-based membrane, oil rejection of >97% was recorded and its overall structural integrity was marginally affected throughout the entire UV irradiation process. The findings of this work showed that the PEI-based membrane should be considered as the host for photocatalyts incorporation if the membrane was to be used for UV-assisted wastewater treatment process.

Creation and Use of Process oriented Knowledge for Effective FRACAS (효과적인 FRACAS 운용을 위한프로세스 지식의 생성과 활용)

  • Lee, Jae-Hoon;Yoo, Ki-Hoon;Kim, Ki-Young;Seol, Dong-Jin;Jang, Joong-Soon
    • Journal of Applied Reliability
    • /
    • v.8 no.3
    • /
    • pp.113-124
    • /
    • 2008
  • In reliability engineering, failure reporting, analysis, and corrective action system (FRACAS) is an useful tool for effective failure reporting and related operations. FRACAS is generally mainly focused on implementation of its closed-loop process, but also includes various related information which has to be effectively managed such as failure types, failure modes, failure mechanisms, and corrective actions. In this study, we adopt and utilize the concept of process knowledge, and create it through abstraction of FRACAS information. At each step of closed-loop process, the necessary type of knowledge, priority and usability are clearly defined. This study also suggests corresponding management tools such as business process management system, knowledge management system, and their key elements and functions to deal with process knowledge. A prototype system using simple closed-loop process with its process knowledge is presented to demonstrate the feasibility of the proposed work.

  • PDF

Work Process Analysis of the High-performed Precast Concrete Columns using Simulation Technology (시뮬레이션 기법을 활용한 고성능 프리캐스트 콘크리트 기둥의 작업프로세스 분석)

  • Shin, Young-Su;Cho, Kyuman;Cho, Chang-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.49-57
    • /
    • 2014
  • Since the structure systems of construction projects have been forced to be large, high-rised, and complex, many researchers have been put their efforts to develop high strength concrete incorporating diverse advanced materials. In order to improve the performance of the concrete, the fibers leading high ductility to concrete have been used, consequently concrete columns adopting High-Performance Fiber Cement(HPFC) have been developed. This paper analyzed not only the construction work process of HPFC column installed to the real construction project, but also construction productivity of the columns by using discrete event simulation technique. As a result, several considerations on installing such a column have identified, compared with the works for typical concrete columns. In particular, there was specific characteristic to install the columns in terms of labor resource productivity, which is not shown with the work for the typical concrete columns.

DEVELOPMENT OF A CONTROL SYSTEM FOR AN AUTOMATIC ROAD SIGN REMOVING EQUIPMENT USING HIGH PRESSURE WATER-JET (초고압수를 이용한 노면표시 자동제거 장비개발을 위한 제어시스템 및 노면최적조건에 대한 연구)

  • Kwon Soon-Wook;Kim Kyoon-Tai;Han Jae-Goo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.139-146
    • /
    • 2004
  • Resent removal work for road signs has been labor intensive and required times since it has been done manually using shaving type equipment. While traditional process is conducting, there are traffic jams caused by the passing control, and happened unexpected accidents to workers working at dangerous road circumstance. Besides, in current shaving method, there are high potentialities on the air pollution as well as the explosive accident occurred by using a propane gas. So, as an alternative, we have studied to develop the automatic erasing equipment made up with a high pressure water-jet system and automatic control system, mobile system; Wate-rjet system consists of an intensifier and nozzles to give a high pressure and spray on the sign, and automatic control system is composed of one axis robot using a hydraulic servo actuator controlled by a lever, And as a mobile system, a truck plays an important role for the transport of equipment and the forward movement in a removal process. In this paper, we have analyzed the characteristics of road signs and have investigated current erasing methods in the field. And we have organized and designed automatic erasing equipment, and we have made a basic experiment to find out the optimal spray condition as like the spray distance, spray angle and injection pressure.

Analysis of Social Relations Among Organizational Units Derived from Process Models and Redesign of Organization Structure (프로세스 모델에서 도출한 조직간 사회관계에 대한 분석과 조직 재설계)

  • Choi, Injun;Song, Minseok;Kim, Kwangmyeong;Lee, Yong-Hyuk
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.1
    • /
    • pp.11-25
    • /
    • 2007
  • Despite surging interests in analyzing business processes, there are few scientific approaches to analysis and redesign of organizational structures which can greatly affect the performance of business processes. This paper presents a method for deriving and analyzing organizational relations from process models using social network analysis techniques. Process models contain information on who performs which processes and activities, along with the assignment of organizational units such as departments and roles to related activities. To derive social relations between organizational units from process models, three types of metrics are formally defined: transfer of work metrics, subcontracting metrics, and cooperation metrics. By applying these metrics, various relations among organizational units can be derived and analyzed. To verify the proposed method and metrics, they are applied to standard process models of the semiconductor and electronic, and automotive industry in Korea. This paper presents a taxonomy for diagnosing organization structure based on the presented approach. The paper also discusses how to combine analyses in the taxonomy for redesign of organizational structures.

A Study on Developing the System for Supporting Mobile-based Work Process in Construction Site (모바일 기반의 건설현장 업무처리 지원시스템 개발 연구)

  • Kim, Seong Jin;Kim, Tae Hak;Ok, Hyun
    • Smart Media Journal
    • /
    • v.6 no.4
    • /
    • pp.50-57
    • /
    • 2017
  • As the construction sites are far from the construction site offices, the construction workers perform work on the sites with a variety of reference books and materials. This inconvenience may lead to construction accidents, and as such, the demand for mobile app development for simplifying work is increasing. Therefore, in this study, the trends of mobile research and mobile app development, and their application to the construction field were investigated to develop a mobile app that would help construction workers process their work. Based on this, mobile services applicable to construction sites and work process improvement plans were proposed. To apply the proposed work process, the functions of the existing construction project management system were improved, and a mobile app that could be used in both the Android and iOS environments was developed.

A Study on Development Framework of Lift-up and Procurement System for Effective Resource Management in the Building Construction (건설공사의 자재관리 효율화를 위한 조달 및 양중시스템 기반구축에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.133-139
    • /
    • 2004
  • The purpose of this study is to present an improved lift-up &procurement work flow for effective resource utilization in building construction. The current lift-up &procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up &procurement work flow. The main contents of the study are as follows; 1) Problems of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning was investigated. The study recommends continuous improvement of lift-up &procurement work flow and efficient management of information in building construction as a future research.