• 제목/요약/키워드: Work process model

검색결과 1,765건 처리시간 0.035초

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

재고설비규모를 위한 최적분배 모델의 연구 (A Study on the Optimum Allocation Model for Inventory Capacity)

  • 최진영;정기호
    • 산업경영시스템학회지
    • /
    • 제5권6호
    • /
    • pp.1-6
    • /
    • 1982
  • The objective of this thesis to Provide a better insight into the effect of the amount of in-process storage has on the efficiency of production line with variable operation times. It is assumed that the material enters the line at the first work station and is then processed progressively through the line until it exits at the last work station, a finite amount of in-process storage is provided before all but the first work station of the line and the operation time of the work stations are statistically independent and follow exponential distribution. Under the above assumption, optimum allocation model is developed and following two approaches are used : 1) Given the available storage capacity, optimum allocation which minimizes the number of items in the line. 2) Given the available storage capacity, optimum allocation which. maximizes the utilization factor of the line. In a balanced three stage line, the production line efficiency is maximized under both categories when the second in-process storage is larger than the first.

  • PDF

빌딩공사의 안전관리정보시스템 개발 (A Development on the Safety Management Information System in Building Work)

  • 박종근
    • 한국안전학회지
    • /
    • 제20권4호
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

철도 감리 업무의 ISO 9001 적용에 대한 고찰 (A Study on the ISO 9001 Application of Railway Supervision work)

  • 장석재;황인범;성정화;김해석
    • 한국철도학회논문집
    • /
    • 제9권3호
    • /
    • pp.325-329
    • /
    • 2006
  • Quite a few of persons often fall into an error that ISO has happened an additional work at construction sites. Supervision works, however, are carried out in compliance with 'Guidelines for the Supervision Works' which is including most ISO Requirements. Additional requirements needed for the supervision works are not many. This study has studied on the ISO application of supervision works in relation to, 1) ISO 9001 & KS A 9001 Quality Management System Basic Model, 2) The Process of Railway Construction Work Supervision Quality Management Plan, 3) Supervision Work Performance Guide Book(2005) & KS A 9001(2001) Standard, at the railway construction sites.

Modeling of Grade Change Operations in Paper Mills

  • Ko, Jun-Seok;Yeo, Yeong-Koo;Ha, Seong-Mun;Lim, Jung-Woo;Ko, Du-Seok;Hong Kang
    • 펄프종이기술
    • /
    • 제35권5호
    • /
    • pp.46-52
    • /
    • 2003
  • In this work we developed the closed-loop model of a paper machine during grade change with the intention to provide a reliable dynamic model to be used in the model-based grade change control scheme. During the grade change, chemical and physical characteristics of paper process change with time. It is very difficult to represent these characteristics on-line by using physical process models. In this work, the wet circulation part and the drying section were considered as a single process and closed-loop identification technique was used to develop the grade change model. Comparison of the results of numerical simulations with mill operation data demonstrates the effectiveness of the model identified.

유한요소법을 이용한 보강롤 구동 4단 냉간압연기에서의 압연하중 및 스트립 두께 예측 (FEM Based Approach to Predict Rolling Force and Strip Thickness in 4-High Cold Rolling Mill Driven by Backup-Roll)

  • 이재현;변상민;박흥식
    • 한국기계가공학회지
    • /
    • 제8권4호
    • /
    • pp.129-135
    • /
    • 2009
  • In this paper, a finite element model is presented for the prediction of roll force and strip thickness in a backup-roll-drive mill. The proposed FE model is focused mainly on analyzing the elastic/plastic behavior between a work roll and a strip as well as the rigid/plastic behavior between a backup roll and a work roll. The capability of the proposed model is demonstrated through application to 4-high silicon steel rolling mill at POSCO. Results show that the predicted roll force and strip thickness rolled accurately agree with the measured them. It is also illustrated that the proper position of work roll displaced to one side from the vertical centerline of the backup-roll may be determined by minimizing the horizontal force of work roll.

  • PDF

Analysis of Unfinished Work and Queue Waiting Time for the M/G/1 Queue with D-policy

  • Park, Yon-Il;Chae, Kyung-Chul
    • Journal of the Korean Statistical Society
    • /
    • 제28권4호
    • /
    • pp.523-533
    • /
    • 1999
  • We consider the M/G/1 queueing model with D-policy. The server is turned off at the end of each busy period and is activated again only when the sum of the service times of all waiting customers exceeds a fixed value D. We obtain the distribution of unfinished work and show that the unfinished work decomposes into two random variables, one of which is the unfinished work of ordinary M/G/1 queue. We also derive the distribution of queue waiting time.

  • PDF

물류 프로세스 표준화 연구 (The Study of Logistics Process Standardization)

  • 박순호;박수민
    • 디지털산업정보학회논문지
    • /
    • 제7권1호
    • /
    • pp.173-183
    • /
    • 2011
  • Global logistics including Korea had developed at various fields through the developed IT technology. In addition, in changing into Internet based digital economy times, economic and logistics activities became extending into worldwide over the cross-border. Logistics activity performed by off-line rapidly changed in real environment. But, unfortunately business process modeling about the whole logistics was not happened, even though process modeling had done by transport stages or logistics entities. Therefore, it is difficult to grasp the whole logistics. Additional cost and time was requested due to no association between logistics entities and invisibility. So, this paper has to be process modeling for logistics industry domain. For objective modeling, work area shall be divided and it extracts general work process per each area. And then it defines subprocess of general work process. Cargo tracking in logistics industry domain means to grasp the status and present states at transportation or storage stage. This paper defines business process and data model for electronic processed work area using the UN/CEFACT standard modeling methodology.

석면해체 공사의 작업 위험성 기반 공정 계획 모델 개발 (Development of Process Planning Model for Asbsestos Dismantling Work Based on Performance Risk)

  • 이수민;노재윤;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.71-72
    • /
    • 2023
  • Asbestos is a durable and heat-resistant building material used in various building materials such as slate, ceiling tex, and spray paint. It has been banned since 2009 after found to be a first-class carcinogen that causes various cancers and asbestos lung disease. Since workers are likely to be exposed to asbestos in the process of dismantling and removal of asbestos-made building materials and facilities, laws and work standards are proposed by the Ministry of Employment and Labor to ensure the safety of asbestos dismantling work. In addition, prior studies on exposure levels and analysis methods have been conducted in this regard mainly for residents. However, the relation between the results of the risk assessment of the process conducted during the asbestos investigation and the work is still ambiguous for the safety of workers. Therefore, this study proposes a process model development methodology that considers work risk based on the results of a survey from asbestos dismantling companies.

  • PDF

Modeling of Grade Change Operations in Paper Plants

  • 고준석;여영구;하성문;고두석;강홍
    • 한국펄프종이공학회:학술대회논문집
    • /
    • 한국펄프종이공학회 2003년도 추계학술발표논문집
    • /
    • pp.291-305
    • /
    • 2003
  • In this work we developed the closed-loop model of a paper machine during grade change with the intention to provide a reliable dynamic model to be used in the model-based grade change control scheme. During the grade change, chemical and physical characteristics of paper process change with time. It is very difficult to represent these characteristics on-line by using physical process models. In this work, the wet circulation part and the drying section were considered as a single process and closed-loop identification technique was used to develop the grade change model. Comparison of the results of numerical simulations with plant operation data demonstrates the effectiveness of the model identified.

  • PDF