• Title/Summary/Keyword: Work delay

Search Result 613, Processing Time 0.031 seconds

The Influence of Occupational Therapist's Work Ethics on the Organizational Commitment (작업치료사의 직업윤리가 조직몰입에 미치는 영향)

  • Ki-Hoon Hong;Ji-Hoon Kim
    • Journal of The Korean Society of Integrative Medicine
    • /
    • v.11 no.3
    • /
    • pp.137-145
    • /
    • 2023
  • Purpose : The purpose of this study was to identify the degree of work ethics of an occupational therapist and examine the correlation between work ethics and organizational commitment. In this study, we aimed to investigate the effects of occupational therapists' work ethics on organizational commitment. Through this study, we aim to determine the importance of work ethics and find a way to improve organizational commitment in occupational therapists. Methods : We conducted nationwide surveys on occupational therapists working in hospitals and other institutions from April 24, 2023 to May 30, 2023. We evaluated general characteristics, work ethics, and organizational commitment. General characteristics were analyzed using a frequency analysis. Work ethics and organizational commitment were examined using descriptive statistics. The correlation among work ethics and organizational commitment was analyzed using the Pearson correlation coefficient. Additionally, a multiple regression analysis was conducted to identify factors that affected organizational commitment. Results : The results of this study were as follows. First, the average score of work ethics was 3.32 ± .32. Second, a significant positive correlation was observed between work ethics and organizational commitment (p<.01). And as a result of the correlation between work ethics sub-factors and organizational commitment, wasted time (r=.261, p<.01), centrality of work (r=.366, p<.01), morality/ethics (r=.470, p<.01), leisure (r=.189, p<.05), delay of gratification (r=.410, p<.01), hard work (r=.437, p<.01), self-reliance (r=.233, p<.01) showed a statistically significant correlation. Third, the sub-factors of work ethics that influenced organizational commitment, including morality/ethics (𝛽=.302, p<.01), hard work (𝛽=.271, p<.01), and delay of gratification (𝛽=.205, p<.01) were identified. Conclusion : In conclusion, the results of this study underscore the importance of work ethics in influencing organizational commitment. Through this study, we recognized the importance of work ethics, which may serve as basic data to promote work ethics and improvement of organizational commitment.

Performance Analysis of the DQDB Protocol (DQDB (Distributed Queue Dual Bus) 프로토콜의 성능분석)

  • 이창훈;박광만;홍정완
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.19 no.3
    • /
    • pp.1-14
    • /
    • 1994
  • In this paper, an analytical model of the message delay in the DQDB (Distributed Queue Dual Bus) network is investigated. The DQDB network has been adopted as a subnetwork for the IEEE 802 MAN (Metropolitan Area Network) standard. The DQDB network consists of two high speed undirectional buses and a series of stations attached to both of the buses. Massages arriving at each station consists of severla packets according to its size. This system is approximated into " $B^{[x]}$/G/1 with exceptional first service queueing " by defining the concept of service time on a packet. The service time for a packet is defined as the time from the instant the packet arrives at the transmission buffer until the time the packet is fully transmitted. By using the BASTA property and the average work in the system, the mean message delay time is obtained.age work in the system, the mean message delay time is obtained.d.

  • PDF

Time Delay Controller Design for the High Speed Precision Servo-Control of the Direct Drive Multi-axis Manipulator (고속정밀 서보제어를 위한 직구동 다관절 메니플레이터의 시간제어기 설계)

  • 이태경;김학성;정상철;최용제;안태영
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1996.11a
    • /
    • pp.1004-1011
    • /
    • 1996
  • This paper covers the technology developmental stage work for the automatic ammunition loading system mainly focusing on the controller design of the electro-hydranlic type direct drive multi-axis manipulator. Mathematical model of the plant derived and PIDM servo-controller structured. Comparative study between the analytical and experimental work has been carried out to help understand the response property of the direct dine multi-axis robot. In the direct drive robot, non-negligible amount of disturbance and load Induced dynamics variation are transmitted to the drive axis and nonlinearity is highly observed. Thereupon a robust controller Implementing time-delay control law is proposed, and computer simulation confirms the possibility for the time-delay control application against the unpredictable disturbance and load-Induced dynamics variation.

  • PDF

Analysis of the hematopoiesis process in mammalian bone using homotopy perturbation method

  • Akano, Theddeus T.;Nwoye, Ephraim O.;Adeyemi, Segun
    • Biomaterials and Biomechanics in Bioengineering
    • /
    • v.5 no.1
    • /
    • pp.51-64
    • /
    • 2020
  • In this study, the mathematical model that describes blood cell development in the bone marrow (i.e., hematopoiesis) has been studied via the Homotopy Perturbation Method (HPM). The results from the present work compared very well with the numerical solutions from published literature. This work has shown that the HPM is viable for solving delay differential equations born from hematopoiesis problem. The influence of the proliferating cells loss rate, time delay rate and the phase re-entry rate on the population densities of both the proliferating and resting cells were also determined through the underlined procedure.

Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.

Input Time-Delay Compensation for a Nonlinear Control System

  • Choi, Yong-Ho;Chong, Kil-To
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.395-400
    • /
    • 2004
  • In most physical processes, the transfer function includes time-delay, and in the general distributed control system using computer network, there exists inherent time-delay caused by the spatial separation between controllers and actuators. This work deals with the synthesis of a discrete-time controller for a nonlinear system and proposes a new effective method to compensate the influence of input time-delay. The controller is synthesized by using input/output linearization. Under the circumstance that input time-delay exists, the system response has more overshoot and tends to diverge. For these reasons, the controller has to produce future input value that will be needed for the system. In order to calculate the future input value, some predictors are adopted. Using the discretization via Euler's method, numerical simulations about the Van der Pol system are performed to evaluate the performance of the proposed method.

  • PDF

An Algorithm for Computing the Source-to-Terminal Reliability in the Network with Delay (시간제약하의 네트워크 신뢰성 계산에 대한 알고리즘)

  • Hong, Sun-Sik;Lee, Chang-Hun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.12 no.1
    • /
    • pp.133-138
    • /
    • 1986
  • In this paper, we are modeling the problem of the reliability evaluation in the network with delay. The triconnected decomposition and factoring algorithm for the network reliability, known as the most efficient algorithm, does not work in this constrained problem. So, we propose some ideas that reduce the above constrained problem to the general network reliability problem. We also present an algorithm for the reliability evaluation in the network with delay based on these ideas.

  • PDF

A TX Clock Timing Technique for the CIJ Compensation of Coupled Microstrip Lines

  • Jung, Hae-Kang;Lee, Soo-Min;Sim, Jae-Yoon;Park, Hong-June
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.10 no.3
    • /
    • pp.232-239
    • /
    • 2010
  • By using the clock timing control at transmitter (TX), the crosstalk-induced jitter (CIJ) is compensated for in the 2-bit parallel data transmission through the coupled microstrip lines on printed circuit board (PCB). Compared to the authors' prior work, the delay block circuit is simplified by combining a delay block with a minimal number of stages and a 3-to-1 multiplexer. The delay block generates three clock signals with different delays corresponding to the channel delay of three different signal modes. The 3-to-1 multiplexer selects one of the three clock signals for TX timing depending on the signal mode. The TX is implemented by using a $0.18\;{\mu}m$ CMOS process. The measurement shows that the TX reduces the RX jitters by about 38 ps at the data rates from 2.6 Gbps to 3.8 Gbps. Compared to the authors' prior work, the amount of RX Jitter reduction increases from 28 ps to 38 ps by using the improved implementation.

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

Simulation Modeling for Productivity Analysis of Concurrent Construction Method of External Insulation Finishing System in Apartment (공동주택용 외단열 적층시공 공법의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kim, Min Ju;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.68-69
    • /
    • 2015
  • Traditional External Insulation Finishing System(EIFS) is applied to apartment construction by performing structural framework and insulation finishing work sequentially. Separate execution of the three works increases construction cost and duration. Concurrent construction method of EIFS, which performs framework and insulation finishing work simultaneously, is introduced in order to solve these problems. However, the introduced method is exposed to the risk of construction delay caused by bottlenecks due to interacting processes and resources. Therefore, this paper presents a simulation model suitable for estimating work productivity of the concurrent construction by considering predecessor and successor processes to optimize resource allocation and minimize construction delay.

  • PDF