• Title/Summary/Keyword: Work System

Search Result 14,044, Processing Time 0.041 seconds

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

Proposing provisions of Standard Repair Method of Painting Work Defect by Lawsuit Case Study

  • Seo, Deokseok
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.16 no.2
    • /
    • pp.1-9
    • /
    • 2017
  • Defect dispute in apartment building has become a debating social issue. The system of defect lawsuit and the conciliation process are applicable to solve defect problems in South Korea. Among various defects, painting work defect is a critical issue because it requires large area works and entails a lot of cost. Accordingly, disputes on work procedure and cost calculation are argued oftenly between residents and housing providers. This study reviewed detailed main issues of painting work and propose relevant systems and standards. In this analysis, the main issues are categorized into pre-works, main work, and others. The most recent cases are compared and analyzed for each issue. After the analysis, following conclusions are obtained, (1) In defect lawsuit system, even though surface treatment work in pre-work step is part of main work, it has been separated and regarded as a separate work. (2) Although the main painting work are not significantly different from two systems, it is still necessary to achieve a consensus to close the gap in the methodology of painting area calculation and determining whole painting or partial painting. (3) In addition, unlike the profit rate of general construction works, that of painting work remained the maximum rate and additional charge rate for works carried out in higher place are different among cases. Therefore, it is determined that establishing consistent standards is urgent.

The necessity and recommendation on the family-friendly policy for integrating work and family (가족-일 통합을 위한 가족친화적 정책의 필요성과 방향)

  • 정영금
    • Journal of Family Resource Management and Policy Review
    • /
    • v.6 no.2
    • /
    • pp.143-155
    • /
    • 2002
  • Nowadays, the conflict of work and family has become a common problem in families due to the increase of working parents. But in Korea, there is a little supporting system which can help them work. So, this study showed the necessity of family-friendly Policy and families' demands to it. Many capitalist countries which have insufficient welfare system effort to integrating work and family by offering a family-friendly policy for working parents. So, policies for family and women have to be family friendly, and all of the corporation, community, school, and government have to support the working families.

  • PDF

Scanned Drawing-based Production Management System for Deckhouse Floor Outfitting (스캔도면 기반 선실바닥의장 생산관리 시스템 개발)

  • Kang, In-Chang;Song, Chang-Yong
    • Journal of Ocean Engineering and Technology
    • /
    • v.31 no.2
    • /
    • pp.141-154
    • /
    • 2017
  • A production management system is developed to enhance both the information and productivity of ship and offshore plant deckhouse floor outfitting. The functions of the production management system for the deckhouse floor outfitting were reviewed based on a literature survey of several production management systems with respect to the ship building and architecture fields. This study investigated numerous daily production reports and their application to actual work places to utilize the system development. The developed scanned drawing-based production management (SDPM) system minimizes any loss and/or distortion of work information between the workshop and management office when applying a scanned production drawing to the daily report. The SDPM system increases the data objectivity, as well as intuitiveness of the information generation by adopting an efficient user interface, which makes it possible to perform image annotations on the scanned drawing for the daily production report while simultaneously interacting with the production management database. Applying the system operation to actual deckhouse floor covering work verified that it was feasible to use the SDPM system for production management in the ship outfitting work process.

Work-family Balance for Working Parents with Elementary School Children in Korea (취업 학부모를 위한 초등학교의 "일-가정 균형" 제도 현황)

  • Song, Hye-Rim;Seo, Ji-Won
    • Journal of Family Resource Management and Policy Review
    • /
    • v.12 no.2
    • /
    • pp.191-207
    • /
    • 2008
  • The purpose of this study was to analyze the education policies for work-family balance in Korea. Data were collected from homepages of elementary schools(n=196). The major analysis was performed through the following 4 subjects, parent-teacher association, after-school programs, holidays on every alternate Saturday, arbitrary no school days. Based on the results, the policy implications on social investment policies were discussed : To promote work-family balance, family-friendly culture in workplaces as well as schools should be established that develop childcare system for working parents. The linkages between educational system and work system will contribute to parents' rights in Korea.

  • PDF

A Design of Work Monitoring System Using Smartphone

  • Ahn, Yoon-Ae;Cho, Han-Jin
    • International Journal of Contents
    • /
    • v.8 no.3
    • /
    • pp.20-25
    • /
    • 2012
  • Working in a hazardous environment can decrease work efficiency and cause a variety of occupational diseases. To prevent occupational accidents and build a refreshing and pleasant work environment, therefore, it is necessary to develop an application system through which a worker's safety can be monitored on a realtime basis and provide related services. Recently, smartphones have become very popular across the nation, with over 10 million users. As a result, a variety of application services have been developed and provided in diverse sectors. This study proposes a system structure to develop application services which monitor work environment using smartphones and examines its applicability through the implementation of server and client interfaces.

A Study on the Algorithm Development of End-point Position Tracking for Aerial Work Platform with Bend-linked Boom (굴절링크 붐을 갖는 장비의 끝점 좌표 추적 알고리즘 개발에 대한 연구)

  • Oh, Seok-Hyung;Hong, Yong
    • Journal of Power System Engineering
    • /
    • v.20 no.3
    • /
    • pp.64-73
    • /
    • 2016
  • In this research work, an algorithm development on tracking end-point of aerial work platform with jib profile and bend-linked boom was carried out to find the X, Y and Z direction value using coordinate transformation matrix. This matrix consists of device status value(length and angle) based on camera position axis, which are sent from device controller PLUS+1 by CAN protocol. These values are used to measure the distance and angle from the camera to the end-point. Using these distance and angle value, monitoring system controls FAN/TILT/ZOOM status of camera to get an adequate scene of workplace. This program was written in Java, C# and C for mobile device. These results provide the information to the aerial work device for secure operation.

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

The Improvement Plan of Information Management of Interior Finishing Work at Apartment in Korea (국내 집합 공동주택 내장마감공사 정보관리 개선방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.99-106
    • /
    • 2003
  • The purpose of this study is to suggest the rational plans of Information Management in the interior finishing work. The results of this study are summarized as follows; I) Analytical survey of actual construction progress of interior finishing work 2) Review of computer-based development in construction planning & information management of interior finishing work 3) Structure of interior finishing work Planning and Management Support System And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize planning and execution of interior finishing work in korea.

Promoting a Shared Representation of Workers' Activities to Improve Integrated Prevention of Work-Related Musculoskeletal Disorders

  • Roquelaure, Yves
    • Safety and Health at Work
    • /
    • v.7 no.2
    • /
    • pp.171-174
    • /
    • 2016
  • Effective and sustainable prevention of work-related musculoskeletal disorders (WR-MSDs) remains a challenge for preventers and policy makers. Coordination of stakeholders involved in the prevention of WR-MSDs is a key factor that requires greater reflection on common knowledge and shared representation of workers' activities among stakeholders. Information on workers' strategies and operational leeway should be the core of common representations, because it places workers at the center of the "work situation system" considered by the intervention models. Participatory ergonomics permitting debates among stakeholders about workers' activity and strategies to cope with the work constraints in practice could help them to share representations of the "work situation system" and cooperate. Sharing representation therefore represents a useful tool for prevention, and preventers should provide sufficient space and time for dialogue and discussion of workers' activities among stakeholders during the conception, implementation, and management of integrated prevention programs.