Case Study of Precast Concrete Erection Work of the Heavy-Loaded Long Span Structure (초대형 건축물의 PC부재 양중작업 사례연구)

  • Cho, Wonhyun;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.58-59
    • /
    • 2016
  • Along with the logistics development, heavy-loaded warehouses and sales facilities tend to be bigger and designed as a PC structures. PC erection work of heavy-loaded structures is influenced by various factors, including the required construction duration, site and surrounding situations, safety, PC member procurement, equipment rental cost, which ultimately impact the construction cost. It requires creative efforts and a lot of time when preparing an erection plan in consideration of these factors, and the plan prepared has a great influence on safety as well as the construction duration and cost. However, many engineers do not have enough experiences on PC erection work of heavy-loaded, long span structures, making it difficult for them to set erection plans and establish simulations. The study's results will provide a knowledge to obtain a solution for engineers to establish PC erection plans of heavy-loaded, long span structures.

  • PDF

Effect of Ar ion Sputtering on the Surface Electronic Structure of Indium Tin Oxide

  • Lee, Hyunbok;Cho, Sang Wan
    • Applied Science and Convergence Technology
    • /
    • v.25 no.6
    • /
    • pp.128-132
    • /
    • 2016
  • We investigated the effect of Ar ion sputtering on the surface electronic structure of indium tin oxide (ITO) using X-ray and ultraviolet photoelectron spectroscopy (XPS and UPS) measurements with increasing Ar ion sputtering time. XPS measurements revealed that surface contamination on ITO was rapidly removed by Ar ion sputtering for 10 s. UPS measurements showed that the work function of ITO increased by 0.2 eV after Ar ion sputtering for 10 s. This increase in work function was attributed to the removal of surface contamination, which formed a positive interface dipole relative to the ITO substrate. However, further Ar ion sputtering did not change the work function of ITO although the surface stoichiometry of ITO did change. Therefore, removing the surface contamination is critical for increasing the work function of ITO, and Ar ion sputtering for a short time (about 10 s) can efficiently remove surface contamination.

A Study on the Simplification for Quantity Bill Writing and Structure in the Electrical Extension Field (내선분야 내역서 작성 및 체계 간소화 방안 고찰)

  • Hyun, So-Young;Kim, Gwang-Gon;Park, Min-Young;Choi, Seung-Dong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.1
    • /
    • pp.173-178
    • /
    • 2012
  • The quantity bill writing of organized electrical construction can be an effective to quality and process management in the construction. Therefore, in order to overcome confusion of the construction and doing an effective work, the clearly quantity bill writing is need. This paper is a focused to solve a problem of existing quantity bill as the difference in terms of work section and item information, regulatory information of ordering authority. Therefore, a terms of work section and item information, regulatory information of ordering authority has been normalized. Moreover, basic data of simplification for quantity bill writing and structure has been guaranteed.

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

Attitudes of Urban Homemakers Toward Household Work (I) (도시주부의 가사노동에 대한 능도 (I))

  • 김외숙
    • Journal of the Korean Home Economics Association
    • /
    • v.19 no.4
    • /
    • pp.55-64
    • /
    • 1981
  • The purpose of this study is to clarify the attitude of urban homemakers toward household work. The data in this study are obtained from a survey by means of a questionnaire to 174 homemakers in Chuncheon. Frequency, percent, F-test and t-test were applied for the statistical analysis and following results were found. 1) Respondents expressed slightly favorable attitudes toward household work and attitudes varied among the work and attitudes varied among the work activities. 2) The variables affecting the attitude were the age, educational level of homemakers, and the family structure.

  • PDF

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

On the Plans of Kyongju's Sokkuram Restoration Project (1961) by Pai Ki Hyung (배기형의 「경주 석굴암 보수공사 설계도」(1961)에 관한 고찰)

  • Woo, Don-Son;Kim, Tae-hyung
    • Journal of architectural history
    • /
    • v.28 no.2
    • /
    • pp.53-64
    • /
    • 2019
  • This study examines the restoration project of Sokkuram, and introduces its preliminary plans by the architect Pai Ki Hyung. The restoration project started in 1958 with an inquiry committee of the restoration project, and was completed in 1964. Despite having undergone extensive repair work under Japanese supervision from 1913 and 1923, the repair work caused water leakages inside Sokkuram, and regular cleaning work that began in 1933 caused a lot of damage to the sculpture. In result of the surveys, the top priority of this project was to protect the sculptures inside Sokkuram by improving the environment of the cave. At that time, the architect Mr. Pai participated as a head of the fourth field surveyors to plan the restoration project and to design the preliminary plans. He proposed the installation of a double dome structure to prevent further water leakages on the concrete addition that was built up around the grotto by the Japanese. However, in 1961, the Cultural Heritage Committee of Korea examined the plans of Mr. Pai and immediately rejected them. The factors of the rejection were the omitting of entrance design, system of new double dome structure that presses the existing structure, and these changes that had to be made outside of the drainage plans. The repair work of Sokkuram began in 1961, and the main construction was building double dome structure and entrance installation. In this we realize that Mr. Pai's double dome structure plans were very important key concept of this project. This study attempts to demonstrate the double dome installations that Mr. Pai initially proposed, which ultimately remains as emblematic factors of Sokkuram's legacy.

The Change of Industrial Distribution Pattern by Worker Status Classification : Busan, 1994~2004 (종사상 지위분류에 따른 산업분포변화: 부산, 1994~2004)

  • Kang, In-Joo;Nam, Kwang-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.4
    • /
    • pp.111-121
    • /
    • 2007
  • Diagnosis and Prediction of urban industrial structure is a key subject for establishment of sustainable urban development plan. By this time, studies of industry-related urban spatial structure have been concentrated on measurement of space distribution by industry type mainly using data about urban industries or total worker numbers. Now, status of workers become an important issue so this study analyzed qualitative change of urban industrial structure in the view of space using work status classification system. For that, data for work status in 1994 and 2004 were collected in towns and villages, and space analysis units were coincided based on change data between 1994 and 2004. Then, it analyzed spatial distribution pattern of employment through qualitative standard called work status using GIS. The analysis results by work status type of Busan industrial structure in GIS circumstance were as below. First, traditional labor intensive industries met a limit and service and wholesale/retail sale industries went to be poor livelihood. Therefore, Busan's employment rate should be decreased and worker numbers were statistically increased, however, irregular and non-wage workers were suddenly increased. So, it was determined that the quality of employment in Busan area came down. Second, a traditional downtown area has dwindled; on the other hand, employment has been increased in new town or new industrial complex and in the area developed services rather than the manufacturing industry. It is expected that the result of this study may be meaningful as data to prepare for longterm industrial development plan through qualitative evaluation called work status as well as to make behavior pattern of industrial structure which is basis of urban development.

  • PDF

An AHP Approach to Select the Task Related Technique for Work Efficiency Improvement in Shipbuilding Enterprise (AHP에 의한 조선기업의 작업능률향상을 위한 과업관련기법의 선택)

  • Kim, Tae-Soo;Lee, Kang-Woo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.2
    • /
    • pp.67-74
    • /
    • 2007
  • The objective of this research is to select the most effective technique among task related techniques(motion & time study, job redesign, physical environment improvement) for improving work efficiency in shipbuilding enterprise. This study consists of several principal steps. The first step is to design critical criteria in evaluating work efficiency in ship-building enterprises. The second step is to develop sub-criteria of the critical criteria. The third step is to develop a four level AHP(Analytic Hierarchy Process) structure using the critical criteria, sub-criteria and techniques among task related techniques. The fourth step is to develop the pairwise comparison matrix at each level of AHP structure, which was based on survey data collected at the H heavy industry. And the last step is to select the most effective technique among task related techniques using AHP analysis. The result of AHP analysis has shown clear difference in priority among task related techniques in terms of work efficiency of the shipbuilding enterprise: The reduction of normal time is more important than the reduction of allowance time in improving of the work efficiency. Motion & time study is the most important technique for the reduction of normal time, and physical environment improvement is the most important technique for the reduction of allowance time as well.

Happy Work : A Software Architecture Design Environment (Happy Work : 소프트웨어 구조 설계 환경의 개발)

  • 강병도
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.5 no.3
    • /
    • pp.87-93
    • /
    • 2000
  • Recently Software Industry has tended to enhance the productivity and quality with using the software architecture in software development and administration. The research of software component technique and software development methodology are just doing and making many applications. The software architecture is considered as the essential element for analyzing and maintaining the entire structure with organizing the software into components and describing the relations with connectors. The software modeling methodology that we propose is generating Happy Work Language describing the software structure with the modeling tool as Happy Work. We can use System Context Diagram, Component Diagram, Component Sequence Diagram, and they are composed of four Elements as Users, Systems, Components, Connectors.

  • PDF