• Title/Summary/Keyword: Work Scope

Search Result 606, Processing Time 0.025 seconds

Negation in Chaucer's English (초오서 영어의 부정에 대한 소고)

  • Goh, Gwang-Yoon
    • English Language & Literature Teaching
    • /
    • v.9 no.2
    • /
    • pp.91-107
    • /
    • 2003
  • Although the language of Geoffrey Chaucer as part of late Middle English has been discussed by many studies, among which David Burnley (1983) seems to be most remarkable, some aspects of Chaucer's language still need to be better illuminated for a more thorough understanding of not only Chaucer's work and language but also the English language in the late Middle English period. This paper examines the English negation of Chaucer's language, shown especially in his Canterbury Tales, and explains how negation is used in his work, focusing on the three different types of sentence negation and the uses of or and and in the scope of negation.

  • PDF

Realizing an Object-Oriented Informationalization for Activity-Based Business Processing (활동기반 업무처리를 위한 객체기반 정보화)

  • Hwang, Jong-Ho
    • Journal of Information Technology Services
    • /
    • v.12 no.1
    • /
    • pp.309-321
    • /
    • 2013
  • In current complex nature of management with task-structures, a method to reach the enterprise's informationalization success is not common. To satisfy these various requirement, improving the usability of information technology (IT) is a key factor which defining the level of organizational requirement first. Imposing an IT-solution which has excess service of the organization's previous task-environment, procedure and scope is not effective to SME-level unit, which unit could not have a formal organization structure and task structure. SME level informationalization will be success if each function realizes easier on the task-employee's viewpoint. Achieving this objective, a solution provider or department must reflect their work characteristics of nature which has least level of work performing resistance. It is most useful system for SME level unit, if a provider develops single programs which based on task activities, and each program can configure network-linking.

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

Improved reactor regulating system logical architecture using genetic algorithm

  • Shim, Hyo-Sub;Jung, Jae-Chun
    • Nuclear Engineering and Technology
    • /
    • v.49 no.8
    • /
    • pp.1696-1710
    • /
    • 2017
  • An improved Reactor Regulating System (RRS) logic architecture, which is combined with genetic algorithm (GA), is implemented in this work. It is devised to provide an optimal solution to the current RRS. The current system works desirably and has contributed to safe and stable nuclear power plant operation. However, during the ascent and descent section of the reactor power, the RRS output reveals a relatively high steady-state error, and the output also carries a considerable level of overshoot. In an attempt to consolidate conservatism and minimize the error, this work proposes to apply GA to RRS and suggests reconfiguring the system. Prior to the use of GA, reverse engineering is implemented to build a Simulink-based RRS model. Reengineering is followed to produce a newly configured RRS to generate an output that has a reduced steady-state error and diminished overshoot level. A full-scope APR1400 simulator is used to examine the dynamic behaviors of RRS and to build the RRS Simulink model.

The Effect of the Sentence Location on Arabic Sentiment Analysis

  • Alotaibi, Saud S.
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.5
    • /
    • pp.317-319
    • /
    • 2022
  • Rich morphology language such as Arabic needs more investigation and method to improve the sentiment analysis task. Using all document parts in the process of the sentiment analysis may add some unnecessary information to the classifier. Therefore, this paper shows the ongoing work to use sentence location as a feature with Arabic sentiment analysis. Our proposed method employs a supervised sentiment classification method by enriching the feature space model with some information from the document. The experiments and evaluations that were conducted in this work show that our proposed feature in the sentiment analysis for Arabic improves the performance of the classifier compared to the baseline model.

RESEARCH OF THE BEST TIMING FOR GOVERNMENT'S TERMINATION OF FREEWAY REPAIR WORK CONTRACT

  • Jin-Fang Shr;Da-Jung Chang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.699-704
    • /
    • 2005
  • Normally, monetary penalties for breach of agreement will be stipulated in the contract. The contractor parties, who fail to fulfill the agreement, are required to pay the other parties a certain amount or proportion of money as a fine. However, it is worth our study - whether or not the scope of monetary penalty implementation and bases for determination of a fine will cover the losses of social and administrative costs incurred by the interruption of the contract. This research is about the best timing for government to cancel the freeway repair work contracts. Under the goal of the maximum social welfare, the limitation of government spending for the social and administrative costs invoked by interruption of contracts will have to be considered to attain the best timing of contracts' suspension or deferment. According to the factors of social and administrative costs, the best time point is calculated to reduce the loss of the aforesaid costs, which can also be used as theoretical basis for the future road-widening construction at home.

  • PDF

Review on the Working Hours of Radiation Work Plan for ECT through In-service Inspection (원전 가동중 ECT 검사 방사선 작업시간 고찰)

  • Chae, Gyung-Sun
    • Journal of Radiation Protection and Research
    • /
    • v.29 no.1
    • /
    • pp.57-63
    • /
    • 2004
  • As a part of In-service Inspection works in a nuclear power plant, Eddy Current Testing through all the outage of nuclear power plants has been controlled by the radiation management. From the case study about the periodical ECT work, the exposed dose rate of worker has announced over the organized dose rate before the radiation work, it affects the personnel exposed dose management and radiation work permit issue. It is not easy to get some information about ECT related working hours, scope of work and how many workers to forecast the radiation working and the predict dose exposure. It should be need the data accumulation about ECT related radiation work to prepare the ALARA achievement and the radiation work plan for dose mitigation. We can discuss a few information about ECT related radiation working issue for the application of predict dose exposure on this paper.

A Study on the Development of Checklist for Safety Management of Frequently occured Accident Process in Steel Structural Work (철골공사 재해다발공정의 안전관리를 위한 체크리스트 개발에 관한 연구)

  • Hong Hyun-Seok;Yeo Seong-Jin;Jeong Young-Heun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.552-555
    • /
    • 2004
  • As the scale of building construction is larger and more complex, accident is increasing on the steel structure work process. But Safety-Inspection has been carried out through many other checklists in the workplace, it hasn't been used actively. Because checklist wasn't written at the level of specific work and applied scope is Insufficient. So, we must grasp accidental cause about detailed work for making safety management checklist accurately. For this study, we are confining a range to steel structure work of all the building construction. We will classify steel structure process into the detailed work for preventing accident. And we will grasp accidental cause about detailed work for developing the checklist in the future.

  • PDF

A Basic Study on Securing Welfare Space in Crew Accommodation for Fishers Working in Coastal and Inshore Fisheries (연근해 어선원 복지 공간 확보를 위한 기초 연구)

  • KIM, Ki-Sun;HAN, Se-Hyun;CHO, Jang-Won
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.29 no.3
    • /
    • pp.811-821
    • /
    • 2017
  • This paper intends to propose the direction for improving the welfare space in crew accommodation of fishing vessels engaged in coastal and inshore fishery business in order to solve the phenomenon which young fishers trend to avoid working on fishing vessels. Coastal and inshore fisheries are defined as permitted fisheries business under the Fisheries Act and classified into coastal fisheries and inshore fisheries based on a gross tonnage of 10 tons. Fisheries Act also stipulates the upper limit tonnage regulation and the restrictions on bottoms of fishing vessels permitted for coastal and inshore fisheries to protect fishery resources and to prevent overfishing. It is difficult to increase the welfare space in crew accommodation of fishers under such restrictions because the welfare space in crew accommodation could be secured by reducing the space for the strength of fishing. Therefore, this paper compares the revision trend of the international convention(The Work in Fishing Convention, 2007) and domestic laws on welfare space in crew accommodation of fishing vessels engaged in coastal and inshore fishery business to find out the problems and improvement points in securing the welfare space in crew accommodation of fishing vessels. As a result, it is proposed to revise the Enforcement Ordinance of the Fisheries Act so as to secure the welfare space in crew accommodation of coastal and inshore fishing vessels within the scope of maintaining the maximum allowable tonnage limit regulation by adding an exemption provisions of the restrictions on bottoms of fishing vessels in which case the gross tonnage is increased for securing the spaces for crew accommodation and sanitary facilities of fishers without increasing net tonnage where the bottoms of fishing vessels is increased by renovating or replacing the fishing vessels bigger than the bottoms of fishing vessels permitted within the scope of maintaining the maximum allowable tonnage limit regulation.