• Title/Summary/Keyword: Work Productivity Analysis

Search Result 484, Processing Time 0.023 seconds

Labor Productivity Model for Reinforced Concrete Construction Projects

  • Ho Myun Jang;Kyong Hoon Kim;Sang Hyeon Kim;Kyung Hwan Kim;Jae Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.983-989
    • /
    • 2009
  • This study aims to systematically identify direct and indirect factors that influence labor productivity and to build a model that mathematically quantifies them so as to efficiently manage and increase labor productivity in the construction work. This study was performed based on the productivity model for workers in reinforced concrete construction projects, because it aims to establish a general construction labor productivity model that reflects many factors that influence labor productivity. Using statistical analysis, we found that the components that significantly influence productivity were the worker component, the work characteristic component, the work technique component, the work management component, the equipment & materials component, and the work guide component, while the work delay components did not significantly influence productivity. In addition, a priority analysis was performed based on the components that showed statistically significant effects. The results of the analysis indicated that the influence of work management component and the work technique component is more than that of the worker component and the work characteristic component. The construction labor productivity model that was formulated in this study could be used for the determining the standard productivity during the initial planning stage, so the best strategy for increasing labor productivity could be formulated.

  • PDF

A Case Study on Productivity Analysis and Methods Improvement for Masonry Work

  • Chang, Chul-Ki;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.372-381
    • /
    • 2013
  • In the construction industry, a great deal of research has been focused on productivity improvement because a minor change in labor productivity can often make the difference between a profit and a loss. This study shows how productivity measurement methods can be applied in practice, step by step, to analyze and identify potential problems both in productivity and methods performance for masonry work. A work sampling technique was conducted to determine the nature and extent of an observable activity as an aid to measuring overall performance. Also, a method productivity delay model was used to identify non-productivity in individual cycle times. From the work sampling technique, it was found that the masonry crew had a Labor Utilization Factor of 47.1%, and from the videotape analysis, it was found that the material and dumpster location need to be adjusted to reduce the travelling distance. We have found that efforts to improve the productivity of masonry work should be focused almost exclusively on machine and labor delays, based on the result from the method productivity delay model.

A Study on the Productivity of Form Work by using Work Analysis Method (작업측정기법을 이용한 거푸집 공사의 생산성에 관한 연구)

  • Jung, Hea-kyang;Yun, Yer-Wan;Yang, Keek-young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.131-137
    • /
    • 2005
  • Lately Construction industry has been depressing by hard construction market circumstance. Construction company, especial at this time, makes more rationalize the management of inside Company and Construction field. In this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

Workload and Productivity during Work from Home (WFH) for the Construction Workforce

  • Wu, Hongyue;Chen, Yunfeng
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.492-499
    • /
    • 2022
  • A large number of employees shifted to Work from home (WFH) due to the COVID-19 pandemic, including the construction workforce. The changes in workload and productivity due to WFH impact the work performance and economic outputs of companies. However, there are mixed results about the impacts of WFH on workload and productivity. In particular, limited studies focused on specific types of work of different occupations in the construction workforce. This study aims to explore the impacts of WFH on workload and productivity considering different types of work for the construction workforce in the U.S. After identifying three main occupations and five types of work, an online survey (N = 69) was distributed. Descriptive analysis showed that participants had less workload (0.82 hours/week) and lower productivity (9.69%) during WFH. Three occupations had varied changes due to the different types of work. Analysis of Variance (ANOVA) indicated that there was no significant difference in workload, while productivity was decreased during WFH. In particular, the productivity of project-related work and communication and documentation decreased significantly. Overall, participants finished 2.85% less workload per week during WFH. The findings provide an insight into WFH in the construction workforce, which improves future remote or hybrid work arrangements in the construction industry.

  • PDF

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

A Study on the Measure of Productivity of Form Work (거푸집 공사의 생산성 측정에 관한 연구)

  • Jung Hea-kyang;Yun Yer-Wan;Yang Keek-young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.149-155
    • /
    • 2005
  • Lately Construction industry depressed by hard construction market condition. So Construction company, especial at this time, make more rationalize the management of inside Company and Construction field. So in this study we are to present the method of calculation reasonable duration at Reinforced Concrete Work. For the study first make up a question at field workers, then sampling the Form workers based the question. Second, We are using Work Analysis Method analysing the worker's work-method and Time. And then using the result of analysis, measure the Productivity of Form work. The productivity of Form work is used the basic data of duration at Reinforced Concrete Work

  • PDF

Impact of Work stopped on Site Productivity and Productivity Achievement Ratio (작업중단이 현장 생산성과 생산성달성율에 미치는 영향)

  • Kim Tae-Wan;Yu Jung-Ho;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.311-314
    • /
    • 2003
  • This study takes a statistical approach to quantify tile impact of wort stopped on the following day's site productivity. Therefore, this study is aimed to verify this null hypothesis: 'A work stopped in a construction field does not impact on the following day's productivity and productivity achievement ratio'. For the purpose, work, stopped is presumed as a dummy variable impacting site productivity in multiple linear regression analysis. Moreover, the quantified impact of work slopped on productivity achievement ratio is identified based on this study. This study shows that construction managers should persevere in their efforts to secure the work continuity in order to improve site productivity and productivity achievement ratio.

  • PDF

Analysis of Productivity and Distribution of Female Workers in FB's Industries

  • Arfah, Aryati;Putra, Aditya Halim Perdana Kusuma
    • Journal of Distribution Science
    • /
    • v.17 no.3
    • /
    • pp.31-39
    • /
    • 2019
  • Purpose - This study aims to investigate and analyze the factors that affect women's work productivity based on ethnic in the food and beverage industry. Also, it is also to determine whether there are differences in the productivity of female workers based on these ethnic groups. Research design, data, and Methodology - The approach of this research is quantitative by using multiple linear regression analysis and analysis of different tests using SPSS and tested on 114 samples of female workers in various small-scale, medium-sized food and beverage industry categories and large in Makassar City, Indonesia. Determination of samples based on proportional stratified sampling. Industry sampling criteria based on some workers, assets and wealth. Results and Conclusions - The results of this study state that health, years of service, work ethic, age, wages, and work environment have a significant effect on work productivity. While the level of education, the number of dependents does not have a considerable impact, the fact that there is a difference in the productivity index of female workers in a significant sector is compared to small and medium scale enterprises, including the variables of government policies related to pension insurance, work accident insurance and health insurance.

Productivity Analysis of Gas Pressure Welding Work Using Web-CYCLONE (웹싸이클론을 이용한 가스압접공사의 생산성 분석에 관한 연구)

  • Gu, Shin-Hyuk;Kim, Yong-Woo;Lee, Dong-Eun;Huh, Young-Ki;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.273-275
    • /
    • 2012
  • In apartment building with column structure, reinforcing bar of the column is constructed mainly using gas pressure welding job. Therefore, gas pressure welding job in very critical process is construction apartment building with column structure. The purpose of this study is to analyze productivity of gas pressure welding work in column structure apartment using Web-CYCLONE. In this study, a CYCLONE model was developed for the productivity analysis of gas pressure welding work. Through this model, the optimal combination of the resources was obtained. This study will be utilized in the future as a useful tool of productivity analysis and the determination of an optimal combination of resources for gas pressure welding in apartment with column structure.

  • PDF

Improving productivity for a fast food company : a case study (즉석 식품 생산 업체의 생산성 향상을 위한 사례연구)

  • 민선기;김채복
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.10a
    • /
    • pp.57-60
    • /
    • 1996
  • It is critical that all companies improve productivity in order to maintain their international competitiveness. The productivity can be explained as a measurement of effectiveness that is calculated by "the ratio of what is produced to what is required to produce it". The goal of this paper is to enhance productivity for a small fast food company mainly through work analysis. This work analysis will help the company to downsize by improving efficiency via motion analysis and by reduction of losses via facility improvement.provement.

  • PDF