• Title/Summary/Keyword: Work Planning

Search Result 1,575, Processing Time 0.028 seconds

Analyzing Construction Planning Tasks for Performance Improvement (공동주택 설비공사 계획 업무의 중요도 분석에 관한 연구)

  • Kang, Sang-Hun;Kim, Dae Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.165-166
    • /
    • 2018
  • The main focus of this study is the analysis of the importance of the planning work of apartment housing projects. Group the detailed work of the facility into five major tasks, categorize each into five major categories, organize the construction plans (P1 through P 6), name the plans (C4), and analyze the quality of the environmental management plans (E1 through E 4) Finally, this study derived major planning tasks from the correlation between planning and cost metrics and from the T-test.

  • PDF

Planning of Optimal Work Path for Minimizing Exposure Dose During Radiation Work in Radwaste Storage (방사성 폐기물 저장시설에서의 방사선 작업 중 피폭선량 최소화를 위한 최적 작업경로 계획)

  • Park, Won-Man;Kim, Kyung-Soo;Whang, Joo-Ho
    • Journal of Radiation Protection and Research
    • /
    • v.30 no.1
    • /
    • pp.17-25
    • /
    • 2005
  • Since the safety of nuclear power plant has been becoming a big social issue the exposure dose of radiation for workers has been one of the important factors concerning the safety problem. The existing calculation methods of radiation dose used in the planning of radiation work assume that dose rate does not depend on the location within a work space thus the variation of exposure dose by different work path is not considered. In this study, a modified numerical method was presented to estimate the exposure dose during radiation work in radwaste storage considering the effects of the distance between a worker and sources. And a new numerical algorithm was suggested to search the optimal work path minimizing the exposure dose in pre-defined work space with given radiation sources. Finally, a virtual work simulation program was developed to visualize the exposure dose of radiation doting radiation works in radwaste storage and provide the capability of simulation for work planning. As a numerical example, a test radiation work was simulated under given space and two radiation sources, and the suggested optimal work path was compared with three predefined work paths. The optimal work path obtained in the study could reduce the exposure dose for the given test work. Based on the results, tile developed numerical method and simulation program could be useful tools in the planning of radiation work.

A Study on the Development Priority of Automation Technology for Architectural Planning and Design - Based on the Survey Architectural Design Office - (건축 기획설계 자동화 기술개발 우선순위 도출에 관한 연구 - 건축설계 사무소 실무자 설문 조사에 기초하여 -)

  • Moon, Seong-Wan;Yang, Seung-Won;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.13 no.4
    • /
    • pp.1-12
    • /
    • 2023
  • In Korea, there are many attempts to automate architectural design tasks, focusing on government-led national R&D projects and private operators, in order to enhance global competitiveness and productivity of the building service industry. However, according to a survey of architectural design office practitioners, only 25% (9 out of 37) have used it, suggesting that there are fewer cases of practical use in the field compared to research and investment in automation technology development, and there are discrepancies between automation and technology development items required in the field. In this study, the priority of automation of planning and design work of architectural design office practitioners is derived, and a comparative analysis is conducted with domestic architectural design automation service items based on the priority. A survey was conducted on practitioners of domestic architectural design offices to derive automation priorities for 19 items of architectural planning and design work. Based on the derived priorities, the degree of reflection of the working-level automation needs of domestic services was confirmed by comparing them with the domestic architectural planning and design automation service items. As a result, it was confirmed that domestic architectural planning and design automation services did not properly reflect the priority of planning and design work automation of architectural design office practitioners. This suggests that it is necessary to reflect the priorities derived in this study in technology development in order to increase the cases of practical use of the automation technology in the working environment and improve the productivity of service.

Development of Exposure Level Prediction Program in Radioactive Waste Work (방사성 폐기물 작업 중의 피폭서량 예측 프로그램 개발)

  • Park, Won-Man;Kim, Yoon-Hyuk;Whang, Joo-Ho
    • Journal of the Ergonomics Society of Korea
    • /
    • v.24 no.2
    • /
    • pp.71-77
    • /
    • 2005
  • In spite of the importance of nuclear power as one of major electric energies in Korea, the nuclear safety has become the most serious social issue in the operation of the nuclear power plant. In this paper, a virtual work simulation program was developed to predict exposure dose during radiation work in radwaste storage. The work simulation program was developed. using $Java ^{TM}$applet and VRML-virtual reality modeling language. A numerical algorithm to find the optimal work path which minimize exposure dose during the given work, was developed and exposure dose on the optimal work path was compared with that on the shortest path. Comparing with the shortest path for the given work, the predicted optimal path consumed longer work time by II% but reduced total exposure dose by 46%. The simulation result showed that the exposure dose depended on not only work time, but also the distance between the worker and the radiation source. The developed simulation program could be a useful tool for the planning of radioactive waste work to increase the radiation safety of workers.

A Study on the Status of Illumination Environment in Workplaces (업무공간의 조명 환경 실태 조사 연구)

  • Choi Han-Hee;Ha Mi-Kyoung
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.6
    • /
    • pp.167-174
    • /
    • 2004
  • The purpose of this study is to examinethe present illumination conditions in office environment and to suggest an efficient illumination plan in office planning process. Illumination conditions in work environment were surveyed in 6 offices to investigate whether the present illumination conditions were appropriate to the work type. The results of this study are as follows: Most of the general Illuminance level in the area of work were all at an adequate level, except one. The average Illuminance level in the all meeting rooms were met for the standard. Illuminance in the all reception area were extremely over the standard, The illuminations of this area were rather designed according to the image of the company than the standard. As for the illumination method in the area of general work, four offices used a general lighting by a direct lighting type, while two offices used a general lighting and a task lighting at the same time. This survey suggested that first, each company should consider illumination plan in the building planning process, second, illumination plan considering the type of places is needed, and third, illumination environment may be differentiated according to the work type. In conclusion, efficient illumination environment should be considered in office building planning process, especially In terms of illumination materials and methods.

Study on the computer method for power system planning (전력계통계획의 종합기계화에 관한 연구)

  • 송길영
    • 전기의세계
    • /
    • v.27 no.1
    • /
    • pp.49-55
    • /
    • 1978
  • This paper describes a computer method for power system planning. Power system planning was usually studied through individual programs. Because of the laborious work involved in data preparation, the increase of task for power system planning and the time required for the detailed analysis of results, the available time for assessment and decision making has been sacrificed. In order to improve the above situation, the use of data base techniques an the simplified evaluation of the presented programs were newly developed. This program has been used successfully for the routine of power system planning in Korea Electric Company. In addition, this paper describes some results of analysis and evaluation of power system planning in KECO.

  • PDF

Optimal Task Planning for Collision-Avoidance of Dual-Arm Robot Using Neural Network (신경회로망을 이용한 이중암 로봇의 충돌회피를 위한 최적작업계획)

  • 최우형
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2000.04a
    • /
    • pp.176-181
    • /
    • 2000
  • Collision free task planning for dual-arm robot which perform many subtasks in a common work space can be achieved in two steps : path planning and trajectory planning. path planning finds the order of tasks for each robot to minimize path lengths as well as to avoid collision with static obstacles. A trajectory planning strategy is to let each robot move along its path as fast as possible and delay one robot at its initial position or reduce speed at the middle of its path to avoid collision with the other robot.

  • PDF

A CONCEPTUAL FRAMEWORK FOR CONCURRENT CONSTRUCTION PLANNING

  • Euysup Shim;Kenneth Reinschmidt
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.440-448
    • /
    • 2009
  • Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.

  • PDF

Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok (초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 -)

  • Kang, Seunghee;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.48-56
    • /
    • 2020
  • Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage.

A Study on color and Image of Interiors in Office Environment (오피스 색채사용현황과 실내이미지에 관한 연구)

  • 하미경;소윤경
    • Korean Institute of Interior Design Journal
    • /
    • no.38
    • /
    • pp.143-152
    • /
    • 2003
  • The purpose of this study is to Investigate color schemes, degree of its satisfaction, and color implication of office environment. This study is to find the proper current color schemes in offices today, as well as colors that will enhance efficiency and productivity in work for future uses. The study was progressed through visiting offices and survey The collected data were analyzed by using such descriptive statistics as percentage, frequency, mean, and t-test. The result of this study shows that most of offices applied the main color only for ceilings, walls, and floors; and, some of them applied supporting colors in addition to main colors. In general, workers are not satisfied by the color in their work environment. Therefore, careful planning and exploring color schemes of main colors and supporting colors in work environments can be suggested. Also, the study results of color implication in work environment indicates that there is a need to take a careful color planning, especially in relation to the type of work, sex, and the level of education of a worker.